Change Management Tool.

Slides:



Advertisements
Similar presentations
Chapter 9 Designing Adaptive Organizations
Advertisements

Implementing Strategy in Companies That Compete in a Single Industry
Business Transformation: Lessons from the Matrix of Change Prof. Erik Brynjolfsson Center for eBusiness, MIT Sloan School October, 2004 Generous support.
Lead Black Slide. © 2001 Business & Information Systems 2/e2 Chapter 13 Developing and Managing Information Systems.
Enterprise Architecture
Initiating and Planning Systems Development projects
1 There are a number of organization designs, including many combinations or hybrids of models. Seven designs are shown below: Process Centered Front End.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
© 2001 Business & Information Systems 2/e1 Chapter 13 Developing and Managing Information Systems.
What is a Process? A logically related set of tasks performed to achieve a defined business outcome. A structured, measured set of activities designed.
CHAPTER 3 PROCESS MANAGEMENT. WHAT IS PROCESS MANAGEMENT ? The selection of the inputs, operations, work flows and methods that transform inputs into.
Decision Support System Development By Dr.S.Sridhar,Ph.D., RACI(Paris),RZFM(Germany),RMR(USA),RIEEEProc. web-site :
1 Capturing Requirements As Use Cases To be discussed –Artifacts created in the requirements workflow –Workers participating in the requirements workflow.
360 Degree Feedback. Benefits of applying appropriate feedback will help in the manager in people and task areas of development.
BBB Planning, Goals Strategic Goals & Loblaw Strategy1 The #1 job of Management… SETTING GOALS & OBJECTIVES u u PLANNING = “Corporate Strategy is what.
THE PROCESS APPROACH. Basic Concepts of Quality Outline Introduction to the Process Approach Types of Process Identification of Processes Process Analysis.
© 2005 Prentice Hall, Decision Support Systems and Intelligent Systems, 7th Edition, Turban, Aronson, and Liang 6-1 Chapter 6 Decision Support System Development.
Prepared by Amira Selim 31 st October 2009 Revised by Dahlia Biazid Requirements Analysis.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Introduction to Project Management Project management.
Organizational Linkages for Surviving Technological Change: Complementary Assets, Middle Management, and Ambidexterity Alva Taylor, Constance E. Helfat,
Project and Project Formulation and Management
Economic Foundations of Strategy
TK2023 Object-Oriented Software Engineering
Systems Analysis and Design in a Changing World, Fifth Edition
BRAND POSITIONING S.Senthil kumar AP/MBA SNSCT Advertising Management unit III.
A Systems View of Project Management
UML(Unified Modeling Language)
Fundamentals of Information Systems, Sixth Edition
Principles of Information Systems Eighth Edition
Fundamentals of Information Systems, Sixth Edition
Cooperative Strategy Cooperative Strategy
Organizational Effectiveness
KNOWLEDGE MANAGEMENT (KM) Session # 44
Project Integration Management
Manage Change and Organizational Learning
The Project Management Framework
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Measuring Outcomes of GEO and GEOSS: A Proposed Framework for Performance Measurement and Evaluation Ed Washburn, US EPA.
Chapter 16 Implementing HR Strategy: High-Performance Work Systems
Designing Adaptive Organizations
Requirements and the Software Lifecycle
Introduction to Software Engineering
MGT 498 TUTORIAL Education for Service--mgt498tutorial.com.
© 2016, 2017 Change Healthcare Solutions, LLC. All Rights Reserved.
Design, prototyping and construction
Systems analysis and design, 6th edition Dennis, wixom, and roth
Systems analysis and design, 6th edition Dennis, wixom, and roth
Chapter 2 Define the role of advertising within marketing
Objectives 1. A definition of planning and an understanding of the purposes of planning 2. Insights into how the major steps of the planning process are.
Function Notation Transformations.
Tour VII: Change Management
10 Ways to Outsource Business Processes Effectively outsource-business-processes-effectively/
Management and Entrepreneurship
Economics of Organization
1.5b Combining Transformations
Project Lifecycle and IT Product Life Cycle
Table of Contents Methodology 2018 Digital Marketing Plans for the SMB
Strategy Implementation and Management control system
1.5b Combining Transformations
CHAPTER 13 THE STRUCTURE OF INTERNATIONAL FIRM
Organization: Structure and Culture
Rapid Application Development (JAD)
“BPR AS A MEANS OF REINVENTING THE ORGANIZATION: AN OVERVIEW”
Project Management and the Organization
I4.0 in Action The importance of people and culture in the Industry 4.0 transformation journey Industry 4.0 Industry 3.0 Industry 2.0 Industry 1.0 Cyber.
Strategy Implementation and Management control system
Design, prototyping and construction
Beckhard & Harris Change Process Template
Unit IV – Chapter 2 V-Test Model.
Presentation transcript:

Change Management Tool

The Matrix of Change (MOC) Helps identify critical enforcing and conflicting interactions within an existing organizational system; Helps identify how the existing interactions can transition to a proposed organizational system; Can provide useful insights regarding: change, feasibility, sequence, location, and pace. http://ccs.mit.edu/moc/

The Matrix of Change (MOC)

The Matrix of Change (MOC)

The Matrix of Change (MOC)

First Step: Identify Critical Processes Managers should first list their existing goals, business practices, and ways of creating value for consumers. A process is "a structured, measured set of activities designed to produce a specified output ... a specific ordering of work activities across time and place, with a beginning, an end, and clearly identified inputs and outputs. (Davenport, p. 5)" A second list will describe new or target practices.

Second Step: Interactions The team creates the horizontal triangular matrix to identify complementary and competing practices Complementary processes reinforce one another whereas competing processes work at cross-purposes.

Third Step: Transition Interactions The team constructs the Transition Matrix - a square matrix combining the horizontal and vertical matrices which helps determine the degree of difficulty in shifting from existing to target practices.

Fourth Step: Importance The team needs to determine where various stakeholders stand with respect to retaining current practices and implementing target practices.

Final Matrix

Analysis: Feasibility Is the goal state a coherent and stable system? Is our current set of practices coherent and stable? Is the transition likely to be difficult?

Analysis: Sequence of Execution Where should change begin? How does the sequence of change affect success? Are there reasonable stopping points?

Analysis: Pace and Nature of Change Should the change be slow or fast? Incremental or radical? Which groups of practices, if any, must be changed at the same time?

Analysis: Stakeholder evaluation Have we considered the insights from all stakeholders? Have we overlooked any important practices or interactions? What are the greatest sources of value?

Merril Lynch Old Practices New Practices Example (Adapted from MIT Sloan – Professor:Brynjolfsson (Fundamentals of Digital Business)) Merril Lynch Old Practices Information & Operations Proprietary & Custom Information Retail Front Brokerage Pricing High Fees New Practices Outsourced, generic information Web and e-mail for Interaction Low Fees