The European Commission’s science

Slides:



Advertisements
Similar presentations
ASPIRE Off-Site Visits. Rationale Why make an allowance for off-site visits in the protocol? Adherence & Retention Off-site visits Improving Clinic Flow.
Advertisements

Presented By Dr. Yousef Alyousef Energy Research Institute
Health and Safety Executive Health and Safety Executive Inspector’s Competency Model - HSE’s approach Mike Cross 3 June 2014.
ISO 9000 Certification ISO 9001 and ISO
Chapter 10 Verification Procedures. Objective In this module, you will learn: u How to define verification u What functions are part of HACCP plan verification.
Rapid Assessment A quick evaluation of a disaster/emergency impacted area.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
Sep 2005Power Generation1 Proposed LNG Gas Turbine Interchangeability Study 20 Sep 2005.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Part 37 Physical Protection of Byproduct Material Kevin Hsueh Office of Federal and State Materials and Environmental Management Programs HPS Annual Meeting/CRSO.
PowerLight Confidential 1 SunPower / PowerLight Commercial Monitoring Services.
Harikishan Perugu, Ph.D. Heng Wei, Ph.D. PE
September 22, 2010 Strategic Aerospace and Defence Initiative (SADI) Program Overview.
Stephanie Inabnet Edmond Wilson Harding University.
© TAFE MECAT 2008 Chapter 6(b) Where & how we take measurements.
1 EPA’s Climate Change Strategy Robert J. Meyers Principal Deputy Assistant Administrator U.S. EPA, Office of Air and Radiation December 3, 2007.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
Photovoltaic Systems – Residential Scale Part 2 April 2, 2014.
VITO----SYEPA Air quality monitoring and forecasting in China: Shenyang Shenyang EMC.
Power Generation from Renewable Energy Sources Fall 2013 Instructor: Xiaodong Chu : Office Tel.:
Photosynthesis Objective 2: The student will demonstrate an understanding of living systems and the environment. (7.8) Science concepts. The student knows.
Energy, Environment and National Security Directorate (EENS) Best Management Practices in the Experimental Safety Review Program Robert Doty Experimental.
IAEA International Atomic Energy Agency Advanced Workshop School for Drafting Regulations on Radiation Safety RER/9/096.
IAEA International Atomic Energy Agency Advanced Workshop « School for Drafting Regulations on Radiation Safety » RER/9/096 Regional Planning Meeting 2.
10 October 2008, Cavtat (CROATIA) – First Planery Meeting FAIRMODE1 IES - Institute for Environment and Sustainability Ispra - Italy
Topic 6. Without energy from the sun, conditions on Earth would be different. What is the energy that is radiated from the Sun? The energy that is radiated.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
PSR at Training Reactor VR-1 Marek Sedlbauer Czech Technical University in Prague IAEA Workshop on Application of the Code.
GCSE Science A Physics 1 Generation of Electricity Learning Outcomes Be aware of the significance of commissioning, running and decommissioning costs for.
1. TEMPUS PROGRAMME PROJECT REPRESENTATIVES’ MEETING Brussels, March 2010 Management of the Grant Agreement.
CHAPTER 13 – ATMOSPHERE AND CLIMATE CHANGE Section 3a – Climate Change.
Chapter 10 Verification Procedures.
ESS licensing process and Readiness Reviews
Fort Stanwix National Monument Energy Audit Contract
Greenhouse Effect How we stay warm.
Institute for Energy and Transport
Some arrangements for personnel safety 1- Procedures for access
European Commission “Intelligent Energy for Europe”
Installation of an Instrument on a CERN machine
Greenhouse Effect How we stay warm.
XYZ Port Facility Maritime Security Drill
Snow Watch Team Terms of Reference
Industrial Assessment Center Database
BASIC PROFESSIONAL TRAINING COURSE Module XIV Surveillance Case Studies Version 1.0, May 2015 This material was prepared by the IAEA and co-funded.
BTEC Applied science The applied science btec qualification is an excellent choice for those who need 2 science qualifications without the exam stress.
XYZ Port Facility Maritime Security Drill
XYZ Port Facility Maritime Security Drill
Module 2 Key Phases of the Peer Review Programme
Chapter 10 Verification Procedures.
RDE Regulation Commission Meeting
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
What is the UL QFCP? FCIA Webinar Presenters:
United Nations Regional Workshop on the 2020 World Programme
Additional RDE trip indicator(s)
Greenhouse Effect How we stay warm.
RDE Discussion of Conformity Factors - JRC views on the ACEA propsal - - August 2015 – RDE Data Evaluation group European Commission - Joint Research Centre.
Photovoltaic Systems Engineering Session 12
Installation Binder / IRR – an example
Workshop commissioning Installation Coordination at ESS
Boundary conditions - Status
Nutrient Cycles in Nature Ch. 3-3
Energy in the Atmosphere
PSS verification and validation
LDV Real Driving Emissions: - Assessment of RDE data evaluation methods: Set-up of "reference database“ - 16th of September 2013, Brussels Pierre Bonnel.
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Local Communities and Social Innovation for the Energy Transition
Criterion: - Technical Ability
Participating ! Philippe Schild Senior Expert European Commission – DG RTD.
Presentation transcript:

The European Commission’s science and knowledge service Joint Research Centre 1500 core research staff, 3000 total staff 83% Of core research staff with PhD’s Over 1,400 scientific publications per year

Fuels from the Sun: Artificial Photosynthesis EIC Horizon Prize for Fuels from the Sun: Artificial Photosynthesis Grand Final Demonstration Event, summer 2021 Location (Ispra, Italy) Procedures Safety & Security Open points/discussion

JRC Ispra

Proposed area for grand final ESTI about 2000 persons (JRC and external) 167 hectares N

Ispra average daily insolation per month. Notes Ispra has an annual insolation of 1710 kW/m2/year (for a south-facing plane at 35o). The JRC's European Solar Test Installation (ESTI) lab continuously monitors the solar radiation (beam and diffuse), spectrum, ambient temperature, humidity and wind speed). In high summer short thunder storms may occur. Proposed area for grand final ESTI N

Outline Procedure Participants transport their device to JRC Ispra at a time to be specified (at their own cost and responsibility) Set-up on an outdoor pad (max. space for device 5 m x 5 m x 3 m; 48 hours allowed; CO2, mains electricity and water upplied (and monitored) to all test pads) Inspection by expert jurors to verify device design, materials use and inputs; Simultaneous unassisted operation of all devices for a continuous period of 72 hours using natural sunlight.; Evaluation of the fuel produced (composition analysis and powering a Stirling engine). Results to contribute to the overall AP Prize Evaluation

Safety & Security JRC Ispra site has restricted access and visitors need to request an entry permit in advance Participating teams to send in advance safety related details of their device and a statement of safety conformity (gas handling, electrics etc) The JRC site safety office will perform a check on each device prior to the commencement of the verification test (72 test).

Open Points Interest for a site inspection / workshop event at Ispra in 2020? For safety/risk assessment, what type and amount of gas is likely to be produced in 72 hours? Current upper bound estimate is 2.5 m3 CH4 @ STP. Collection method for gas produced and transfer procedure to Stirling engine test Others ….. 