ICARUS Internal Cryogenic Sensors

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
1 Comparison of MIRAC-4 array with Cornell test array, both warm ver 3 Bill Hoffmann November 10, 2009 Test configuration Array: MIRAC-4 array or Cornell.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
LH2 Safety Issues for MICE 1.O2/LH2 separation 2.No Ignition sources near LH2 3.Adequate ventilation 4.Affects: Windows: absorbers and vacuum Primary and.
Summary of the Electrical Feedthroughs. 2 SFT Channels for the 3x1x1 m 3 N. 6 cold + N. 6 warm on a D=222mm flange (each with 20x68pin connectors)
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
Page 1 MCQUAY DIGITAL SCROLL SYSTEM Installation.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
35ton and LAPD cryostats and future DUNE detector development.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
AT/CRG/cd 1 DFBX Low Current Lead Chimneys Consolidation May 16th 2008.
CM Testing Equipment: Quench Protection, DAQ, Splice Resistance Darryl Orris/Mike Tartaglia 25 April 2016 LMQXF Cold Mass Requirements and Conceptual Design.
Installation of the T600 at Fermilab Fermilab, February 15,
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
35 Ton Membrane Cryostat Temperature Profiler Proposal Hans Jostlein Fermilab 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 1.
S A Griffiths CM42 June 2015 Electrical & Control.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Teleconf ACS – FREIA 28th March 2017
Integrating part of the ATLAS Radiation Monitor will measure
Installation of the T600 at Fermilab
Considerations from machine protection and the ELQA teams
Cryogenic Plant Electrical and Controls
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Calorimeter Mu2e Development electronics Front-end Review
Various Views From CAD Layout Emphasis on the relative locations of
ProtoDUNE SP – Slow control Status
ProtoDUNE SP – Slow control temperature readout setup test
Marco Statera NA62 - GTK working group meeting
LCLS-II 2K Cold Box Controls Design Review
Christian Veelken last updated 11/09/06
Teleconference ACS – FREIA 10th May 2017
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
NP04 CPA/FC/HV Interfaces
XFEL Vacuum System Commissioning
Teleconference ACS – FREIA 20th February 2018
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
SNS PPU Cryomodule Instrumentation
J. Fleiter, S. C. Hopkins, A. Ballarino
We are working on developing “cheap” RTD monitoring channels for the CMS Phase-2 requirements. The channels will provide the complete readout for 4-wire.
Presentation transcript:

ICARUS Internal Cryogenic Sensors Purpose This system provides a means of reading the temperature and liquid level sensors internal to the ICARUS cryostats. Resistance Temperature Detector (RTD) 30 locations per T300 cryostat Type Pt1000 in cryostat 1 Platinum RTD with R=1000Ω at 0°C Type Pt10k in cryostat 2 Platinum RTD with R=10kΩ at 0°C Provide interlock during initial LAr fill (Tmax−Tmin<50°C) Monitor LAr temperature during normal operation Resistive Level Meters (RLM) 4 locations per T300 cryostat (five 470Ω resistors per RLM) Resistance lowers ~25% when immersed in LAr Alert when nearing top during initial LAr fill Monitor LAr level during normal operation RTD Installation RLM Installation

ICARUS Internal Cryogenic Sensors Readout Controlled by a PLC, Beckhoff CX5120-0115 performance CPU module, located on the mezzanine Four control panels located on top of the cryostats, near the chimneys for RTDs and RLMs Uses Beckhoff EL3204- 0200, universal RTD modules (resistance range 100Ω to 240kΩ) Electrical isolation between panels for grounding DC excitation current to sensors (low noise) Connected to main cryogenic controls PLCs Data accessible through iFIX HMI and saved in historian (same as all other cryo data) OPC server makes data available over Fermilab network (i.e. can be read by EPICS) System Layout Control Panel

ICARUS Internal Cryogenic Sensors Feedthrough Flanges Using four feedthrough flanges from original installation, plus three new feedthrough flanges All feedthrough flanges installed Wiring Verification Some wiring errors found (broken or shorted wires) Wiring errors inside cryostats cannot be repaired; bad channels noted on drawing 5 RTDs in NE corner lost due to lost connector inside cryostat 1 shorted resistor on NE RLM 1 bad RTD (broken wire?) in SE corner 1 bad RTD (broken wire?) in SW corner Readout Boxes Assembled and completed safety review To be installed inside racks housing TPC power supplies Save space on top of cryostat Test conducted to ensure noise will not affect TPC power supplies Connector to Cold Side of Feedthrough Flange

ICARUS Internal Cryogenic Sensors Next Steps Install readout boxes in the top of corner racks on top of warm vessel First box expected to be installed today Expect other three in next week Route wires from boxes to flanges Part of overall cryogenic system wiring Expected over next couple weeks PLC Programming and verification of sensor reading Part of overall cryogenic system programming and commissioning Expected over next three weeks