SSRAC 2019 Robert Cloutier September 10 – 12, 2019

Slides:



Advertisements
Similar presentations
BAE Systems Norfolk Ship Repair National Career Pathways Network Conference 18 October
Advertisements

Preparing a Coating Inspection Plan
Calculating Coating Lifetime Costs
Overview June 10, PROPRIETARY INFORMATION PRIVILEGED AND CONFIDENTIAL ATTORNEY CLIENT COMMUNICATION General Dynamics l Headquartered in Falls.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Navy / Air Force Systems Capabilities Overview
Quality Assurance/Quality Control Policy
Office of Business Development Training
U.S. Small Business Administration
The Maintenance and Engineering Organization
Pollution Prevention Toyota Industrial Equipment Mfg., Inc. December 7, 2011.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
BAE Systems Proprietary Information 1 San Francisco Ship Repair POSF Maritime Commerce Advisory Committee Meeting September 17, 2009.
1 CAPT Larry Olsen Deputy Commander MARMC 16 June 2004 Mid-Atlantic Regional Maintenance Center Overview.
Generic GFE Implementation Toolset for Prime Contractors -IUID Guidance- –Initial population of Government Furnished Equipment Data into the IUID Registry.
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
Standards, Training, and Certifications in the Marine Coatings Industry Presented by: Earl Bowry.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
Chapter 6 Requirements for a Maintenance Program.
Laser Ablation Coating Removal Process for Navy Use Goal (s) (1)Approve LASER ablation as an authorized paint removal method for use on all classes of.
NMD-R Update 2015 Improvements Mr. Dale Hirschman CNRMC C200 3 SEP
Surface Ship Maintenance and Modernization Contracting Strategy
Milestones, Definitions, AIT Work Integration, Quality CNRMC C300 / SEA Ted Sanders / Dale Davis.
NAVSEA Material Fraud and Counterfeit Materiel Manager
Department of Public Works FY 2018 Recommended Budget
Modular Nondestructive Aluminum Sensitization Quantification and Mitigation System, ElectraWatch, Inc., FY16-DoN-RIF-NAVSEA-02 Contribution to the Requirement:
Content of Tender Dossier Instructions to Tenderers
RFP EMISSIONS SOURCE VALIDATION
Transactional Data Reporting
Voting Procedures Committee Report
SAP CS INTRODUCTION SAP Customer service is a highly integrated process module which involves a strong integration of SAP PM,SD,MM,FICO and PS. The scenarios.
Ron Perry President National 8(a) Association & Teya Services, LLC.
(Additional materials)
FEASIBILITY STUDY Feasibility study is a means to check whether the proposed system is correct or not. The results of this study arte used to make decision.
Enterprise Content Management Owners Representative Contract Approval
Developing and Issuing the RFP
Proposed Revision of: NSTM 631 Rev
NSRP Joint Panel Meeting
State of the Surface Preparation & Coatings Panel
School Advisory Committees
Retention of Type VI Epoxy under UHS Epoxy NSRP Surface Preparation and Coatings Panel 3/29/18 Conlan Hsu Engineer, R&D.
Schedule 84 SIN Consolidation
THIS IS A GENERAL REFERENCE ONLY – SEE NOAA APG CHAPTERS for specific guidance and references to applicable statute, regulation, DOC policy, and NOAA policy.
2018 NAVSEA Standard Specifications for Ship Repair and Alteration Committee (SSRAC) Meeting 30 JULY – 03 AUG 2018 Preliminary Outbrief *As of 02 AUG 2018.
Paul Boase, Chair, Transport Canada Jill Collins, CSA Val Todd, CCMTA
SALMAWY UNITED GROUP CONSULTANT
Product Development Scenario Overview
INFORMATION ABOUT ASBESTOS
Election Contracts, Joint Election Agreements & Leases For Equipment
ST1 Maintenance & Modernization Summit
Coating Failure at a Gas Compressor Facility
Planning Department FY 2019 Recommended Budget
Distribution A: Approved for Public Release
Surface Preparation & Coatings (SP&C) Panel Update
Surface Preparation & Coatings (SP&C) Panel Update
John Kern SSPC Technical Services Dept.
Thermal Insulating Coating to Achieve R Value Using Aerogel
Ship Design & Material Technologies Panel
Membership & Professional Standards Committee
THE SCHOOL SITE COUNCIL
Donald Hamadyk Director, Research and Development
ASME A17 Committee Structure
Evaluation and Control of Beryllium Exposure in Shipyards Risk Management Panel Project NSRP Subcontract No March 12-14, 2019 Charleston, SC.
2nd Edition: 2019 Winter Standards Meeting
TCEQ Environmental Trade Fair Water Quality Division
DOE Review of the LCLS Project October 2006
City Council February 4, 2019 Item No. 2
Competitive Solicitations & Sole Source Justifications
Bob Cloutier, for SSPC Technical Services Dept.
NSRP Joint Project SP&C and WD Panels Robert Cloutier
Presentation transcript:

SSRAC 2019 Robert Cloutier September 10 – 12, 2019 NSRP Joint SP&C and EH&S Panel Meeting Quonset Point, RI

VASCIC – Newport News Shipbuilding SSRAC 2019 (FY21) Standard Specification For Ship Repair and Alteration Committee 24 - 28 June 2019 VASCIC – Newport News Shipbuilding Virginia Advanced Shipbuilding and Carrier Integration Center

SSRAC - Subcommittees Unless designated Environmental / Safety / Health Hull / Preservation Machinery / QA Piping / Boiler Electrical / Electronics General (non-trade specific) 4-E / Phraseology

SSRAC – Hull / Preservation Unless designated as a Government Representative, Contractors are non-voting participants of the Subcommittee also known as “Participant Witnesses”. Our Industry Partners’ serve as “information providers” to the Subcommittees, and they do not participate in the deliberations by the Government members of the Subcommittees to reach consensus on what to recommend to the Steering Committee, nor do they vote on any matter before the Subcommittee. NSRP – SP&C Panel Representatives Robert Cloutier Steve Cogswell

NSI – NAVSEA Standard Items 009-04 Quality Management System 009-26 Deck Covering Requirements 009-32 Cleaning and Painting Requirements 009-124 TSN – Thermal Sprayed Non-skid Proposals for change Adopted Adopted as modified Not adopted Other

Hull / Preservation Subcommittee Reviewed a total of 83 total change proposals 16 Adopted 32 Adopted as Modified 32 Not Adopted 3 Other

Key Changes 009-04 Check-point notification reduced from 4 to 2 hours 009-32 Eliminate “Chloride” and require Conductivity Measurements Mil-PRF-23236, Type VII, Class X/18: Single Coat UHS epoxy, limited to 3% touch-up with alternate coatings Non-skid: segregated rolled vs spray applied Standardized the number of reading for testing; per 5,000 sq ft Anchor tooth profile for non-skid was 10 vs 13 Conductivity reading was 9 vs 13 Dust test was 10vs 13 009-124 Complete review for Thermal Sprayed Non-skid FY20 NRL testing showed that chloride measurements do not pick up non-chloride water-soluble salts while conductivity-based total salts detect the chlorides in addition to the non-chloride water soluble salts. This may allow the application of paint over a surface contaminated with other salt types, such as nitrates and phosphates, which are detrimental to coating systems Non-skid specifically segregated to stated either spray or roll applied

Discussed, but not adopted 009-32 Non-skid applications Requirement to apply Type V spray-able non-skid commercial equipment meeting A-A-28852 Requirements to mix non-skid with a mixer qualified to A-A-59984 Abrasive blasting on aluminum (non-ferrous metals) Waiting for final approval of SSPC-17 “Thorough Abrasive Blasting” Non-skid sprayer Developed to mix MIL-SPEC nonskid deck coatings, ICM2000 has the power to completely mix thick coatings containing abrasive materials.

Opening Remarks Dale Hirschman: Technical Director, CNRMC Code 200 287 US Navy ships to maintain Limited Dry-docks available San Diego has the least available dry-dock locations Streamline dry-docking; Reduce schedule and time DDG 51 class: Optimum ~110 days CNRMC – Commander, Navy Regional Maintenance Center

Navy/Industry NSI Review On-going Projects: 50% Checkpoint Reduction Pilot Initiative An aggressive “stretch” approach with an objective of executing pilot availabilities with significantly reduced Checkpoints content 2 East Coat – 2 West Coast USS ARLEIGH BURKE (DDG 51) – Norfolk, VA USS BULKELEY (DDG 84) – Norfolk, VA USS SHOUP (DDG 86) – Everett, WA USS ESSEX (LHD 2) – San Diego, CA

Underwater Hull Paint Pilot Background: Industry proposed that the underwater (U/W) hulls of Navy ships could be painted in one quarter of the time if accomplished the way MSC U/W hull preservation is accomplished CNRMC observed an MSC ship undergoing U/W hull preservation and acquired the MSC specification. Required checkpoints were almost identical. The only technical difference was a slightly higher threshold for chlorides (conductivity). Obtained TWH concurrence to pilot the MSC model Way forward: Developing an NSI that describes the application process for U/W hull preservation (95% complete). Developing contract that will be used in the solicitation package for: Obtaining a Third Party Paint OEM to act as government representative. Purchase paint as GFM. Provide a two year warranty for the paint. CNRMC – Commander, Navy Regional Maintenance Center MSC – Military Sealift Command OEM – Original Equipment Manufacturer NSI – NAVSEA Standard Item GFM – Government Furnished Material

Drydock – Propulsion Work Master Specification Catalog (MSC) Checkpoint Reduction Initiative A systematic and sustainable approach for reviewing Work Templates in order to reduce the number of Checkpoints (by system/equipment). Initial systems for review include: SWILN 245 Controllable Pitch Propellers (CPP) 312 (G) Checkpoints in FY19 SWILN 243 Propulsion Shafting 227 (G) Checkpoints in FY19 SWILN 244 Propulsion Shaft Bearings 146 (G) Checkpoints in FY19 ~685 government check-points

Clarification of 009-90 Change to 009-90 Technical Representative; provide “The NSI 009-90 Technical Representative will only be contracted by the prime contractor and the same company cannot provide both the Technical Representative and perform the actual production work.” CNRMC Letter: Clarification for Use of NAVSEA Standard Item 009-90, During Surface Ship Maintenance Availabilities Clarifies OEM role augmenting the Government oversite vice production support. 4E Guidance: Generally technical support should be provided by the supervisor. The Technical Representative should only be requested when: Technical documentation is not available to the supervisor. The supervisor does not have sufficient personnel to support oversight of maintenance being performed. Special tools or equipment are required. The supervisor does not have personnel with the knowledge or expertise to support the maintenance being performed. Planners must identify what services the technical representative is to provide. NSI 009-90 will be invoked as a pre-priced option when the need for a Technical Representative for a Work Item in an availability is unknown. When invoked in a work specification, the Technical Representative providing the technical support may witness/conduct (G) checkpoints as authorized by the supervisor.