PROJECT SAFETY Richard Hislop.

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Richard Hislop Construction April 7, CONSTRUCTION SAFETY Richard Hislop.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Michael Scharfenstein FAC June 17, ES&H Status of Construction and Technical System Installations Michael Scharfenstein.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
1 Michael Scharfenstein 1 Environment, Safety and Health CXI Final Instrument Design Review, June Mike Scharfenstein ES&H.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Safety Oversight for SLAC Accelerator Department Operations
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Michael Scharfenstein FAC April 16, 2007 LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Michael Scharfenstein FAC October 30, LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Mike Scharfenstein CF Breakout - 12 November 2008 SLAC National Accelerator Laboratory 1 ES&H Status of Construction and Technical.
M. Scharfenstein FAC April 20-21, PROJECT SAFETY Michael Scharfenstein LCLS ES&H Coordinator.
Richard Hislop FAC October Construction Safety Richard Hislop.
Lumbermen’s Underwriting Alliance
M. Scharfenstein - ES&H Coordinator 8 June 2009
International Civil Aviation Organization European and North Atlantic Office SAFETY MANAGEMENT Elements Michel Béland ICAO Regional Safety Officer Europe.
Risk Assessment – An Essential Standard
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
LCLS NEH Operational and User Safety Programs
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 Lori Plummer 1 LCLS Office Space FAC Review – Breakout Session CONVENTIONAL FACILITIES LCLS Office Space Lori Plummer, PMP,
Science What is “Safety” Freedom from danger Safety is the condition of being protected against failure, breakage, error, accidents, or harm. (Protection.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 Teichert’s Zero Injury Culture Program Overview Nancy Moorhouse, CSP, ARM, CMSP Presented for MSHA on Safety & Health Management Systems October 12,
Health and Safety Policy
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Take 5 for Safety E. Lessard January 13, Readiness for High Consequence Risks: Accelerator Operations  Implementing procedures tie responsible.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
IIPP An Overview of the Injury and Illness Prevention Program.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
Safety procedures in sport
LCLS-II ES&H Requirements: Subcontractors
ESS licensing process and Readiness Reviews
Installation Procurement Package
Accelerator Operations Department Readiness (Part 2)
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Meeting of the LCLS Facilities Advisory Committee
Injury and Illness Prevention Program (IIPP)
Sector 20 Project Overview
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Electron Beam Systems ETC and Methodology
Ian Evans SSRL Safety Office
Conventional Facilities (WBS 1
Details supporting the increase
Project Status Review May 13-15, 2008.
Integrated Safety and Environmental Management
Michael Scharfenstein Project ES&H Coordinator
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
Environment, Safety and Health
CONVENTIONAL FACILITIES
Richard Hislop Construction Safety Coordinator
DOE Review of the LCLS Project October 2006
Welcome from the Director
Safety Program for LCLS Experiments
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Presentation transcript:

PROJECT SAFETY Richard Hislop

Contractor Activity to Date FFTB Wall FFTB Before MMF Magnet Measurement Facility Utility Line to MMF Final Focus Test Beam Wall Final Focus Test Beam Removal Laser Injector Facility 39K Hours without injuries FFTB After Electrical Feed Objective: Outline extent of contracted work done to date and envisioned. Development: R. Hislop was retained in April to begin developing the LCLS construction safety structure. Working with SLAC – Chapter 42 LCLS Conventional facilities group Developed the LCLS ES&H Program Process: Execution of Work: Construction safety is a process Work planning: David Saenz “Sign Off Form” Review: Technical and SLAC Safety Committee (CC) review of design Authorization: LCLS Director Oversight: Contractor, LCLS (CFG, ESH, Mgt), SLAC ESH Division, DOE-SSO

Turner Mobilization Dedicated safety manager Safety Program Turner Corporate Program LCLS Requirements Cal/OSHA Voluntary Protection Program (VPP) Contractor Controlled Insurance Program Substance abuse testing program SLAC/LCLS Coordination Turner Northern California Safety Director Actively involved in program development Dan Goodman

Note: Injury rates based on 200 K hours (100 man years) of effort. Injury Experience Lost Time Injury Rate SubContractors 39 K Hours worked Zero Injuries LCLS Collaboration 518 K Hours worked 2 Lost Time Incidents Turner Experience 2002 – 2006 Lost Time Rate - 0.26 June 8th was shoulder injury date. As Michael Scharfenstein pointed out in his presentation LCLS work consisted of work performed in office environments and contracted work. The injury we have experienced to date was a a shoulder strain experienced by an individual moving a coffee urn. She picked up more that she was apparently able to carry and strained her shoulder. In response to that incident and the recognition that injuries in office environments are not catastrophic events, such as electrical shocks or asphyxiation in cubicles, but the result of individuals trying to “Help” the institution by getting the work done and possibly cutting corners, the SLAC COO John Cornuelle was asked to give a talk to the LCLS staff on that very subject that he had done an analysis of SLAC experience and had come to that same conclusion. May 11, 2006 APS Back Injury After a discussion of work entailed in assembling a desk a technician wrenched his back as he and another individual lifted a portion of the desk. Note: Injury rates based on 200 K hours (100 man years) of effort.

ISMS In Practice Documented Safety Program (IIPP) Employee Safety Orientation and Photo ID Area Hazards Analysis and Sign-in Work day starts with Tool Box review of JSA Safety included in Progress Reports Daily safety inspections Regular management walks SSO Weekly Inspections

Work In Progress Construction Turner Safety Program Emergency/ Crisis Management Reporting Protocols & Scenario discussions Tunnel Rescue Training (5 Hrs) Accelerator Readiness Review - Injector Commissioning Target Date January 5, 2007 Coordinating readiness details with SSO Safety Documentation (SAD FHA Procedures) Readiness Reviews

Thank You