CSC Electronics Problem Report CSCE I&C

Slides:



Advertisements
Similar presentations
EMU Peripheral Backplane. Timing with the CCB’2004 M.Matveev Rice University April 26, 2004.
Advertisements

Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Trouble shooting and Managing system. Computer is running slow what steps needed? Reboot Free hard drive space Verify that there is at least MB.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Status of the CSC Track-Finder Darin Acosta University of Florida.
28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
22-March-2010CSC DCS Instructions1 Top Level of CSC DCS UI Communication Status Majority Logic Subsystem Panel HV, LV, FEDS CSC End View * CSC * PCrates.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
HOW TO FIX MSVCR100. DLL IS MISSING ERROR? missing-error.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
VME Bus error A possible error condition for TMB whose firmware has been “misloaded” is to cause Bus Error on VME crate controller (VCC) at power up… Under.
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
University of California Los Angeles
University of California Los Angeles
Darin Acosta University of Florida
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
The Ohio State University
TMB, RAT, and ALCT Status Report
CSC Electronics Installation and Commissioning CSCE I&C
B904 Status Report by Fred B.
CSC Trigger Primitives Test Beam Studies
New Calorimeter Trigger Receiver Card (U. Wisconsin)
University of California Los Angeles
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
How to Fix Brother Printer Offline Status with Free Brother Printer Support? VISIT WEBSITE.
Fred’s Input to Rice Workshop
VCC Hardware Production Status
CSC Turn ON Status Report by Fred B.
Configuring the Peripheral Crates
Sector Processor Status Report
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Peripheral Crate Testing, Installation, and Commissioning
CSC Status Report Status reports;
B904 Status Report by Fred B.
CSC Electronics Installation and Commissioning CSCE I&C
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
ME I&C -- PC Electronics
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

CSC Electronics Problem Report CSCE I&C 19-April-05 CSC Electronics Problem Report CSCE I&C Fred Borcherding 13-Nov-19 ME I&C -- PC Electronics

ME I&C -- PC Electronics 19-April-05 Activities Over the past months two activities have been ongoing 1 Peripheral Crate + Chamber testing has been in process for –Z 2 The minus end Slice Test has been in process Both processes have identified problem PCrate electronics boards The next slide lists these problems The following third and forth slides list earlier problems 13-Nov-19 ME I&C -- PC Electronics

List of Problem PCrates & Boards 19-April-05 List of Problem PCrates & Boards Date of Entered Location status ID action taken Action by Location 1 8-Feb-07 Misha VME-2/3 detector removed DMB0104 We couldn't download the firmware. 2 22-Feb-07 Misha VME-2/1 detector removed DMB0506 ground potential for CFEB 1,2,4 read >0.25V 3 5-Mar-07 Misha VME-3/6 detector removed EMUPC0038 1 pin bent, 1 pin in wrong position, slot #20 RAT side 4 18-Apr-07 Misha VME-1/6 detector removed DMB0490 DMB tests 4,8,9 failed 5 3-May-07 Misha VME-1/6 detector removed TMB5532 gave CREBrx: 2,6,6,7,7 > wrong 6 14-May-07 Misha VME-1/4 detector removed DMB0067 didn't enable +3.3V,5V,6V for CFEB#3 7 16-May-07 Misha VME-1/2 detector removed DMB0321 Couldn't download the firmware 8 21-May-07 Misha VME-1/2 detector removed EMUPC0034 couldn't download ALCT firmware through slot #2 9 21-May-07 Misha VME-1/2 detector removed MPC0048 the winner bit test failed in all TMB slots 10 22-May-07 Misha VME-1/3 detector removed TMB5096 STEP not able to read ALCT data through slot #2 11 31-May-07 Misha VME-1/1 detector removed DMB0067 didn't enable +3.3V,5V,6V for all CFEBs 12 4-Jun-07 Misha VME-1/1 detector removed CCB0072 hangs up the system talking to DMB modules in slot #19 13 2-May-07 Greg VME-3/3 detector removed DMB0074 ELOG:1939 - Not acting correctly since latest DMB firmware update 20-May-07 Jianhui B904 Fixed DMB0074 ELOG:2098 - Reload PROM at B904 >> fixed, OK board 14 2-May-07 Greg VME-2/1 detector removed DMB0400 ELOG:1939 - Not acting correctly since latest DMB firmware update 20-May-07 Jianhui B904 NOT Fix DMB0400 ELOG:2098 - looks like problem PROM >> board bad 13-Nov-19 ME I&C -- PC Electronics

ME I&C -- PC Electronics 19-April-05 Earlier Problems - 1 Entry Date of Action Location status Serial N/O A (mfg) comment 2723 08-Feb-07 ISR problem DMB0016 mechanical problem 2717 08-Feb-07 ISR problem DMB0053 set aside during ISR testing 2702 08-Feb-07 ISR problem DMB0057 set aside during ISR testing 2722 08-Feb-07 ISR problem DMB0128 mechanical problem 2716 08-Feb-07 ISR problem DMB0209 set aside during ISR testing 2713 08-Feb-07 ISR problem DMB0221 set aside during ISR testing 2721 08-Feb-07 ISR problem DMB0229 set aside during ISR testing 2712 08-Feb-07 ISR problem DMB0259 set aside during ISR testing 2710 08-Feb-07 ISR problem DMB0276 set aside during ISR testing 2719 08-Feb-07 ISR problem DMB0303 set aside during ISR testing 75 30-May-05 B904 problem DMB0304 The front pannel is upside down 2714 08-Feb-07 ISR problem DMB0325 set aside during ISR testing 2704 08-Feb-07 ISR problem DMB0332 set aside during ISR testing 2708 08-Feb-07 ISR problem DMB0337 set aside during ISR testing 2709 08-Feb-07 ISR problem DMB0338 set aside during ISR testing 2705 08-Feb-07 ISR problem DMB0340 set aside during ISR testing 2706 08-Feb-07 ISR problem DMB0343 set aside during ISR testing 2707 08-Feb-07 ISR problem DMB0355 set aside during ISR testing 2715 08-Feb-07 ISR problem DMB0363 set aside during ISR testing 2718 08-Feb-07 ISR problem DMB0427 set aside during ISR testing 2711 08-Feb-07 ISR problem DMB0438 set aside during ISR testing 2720 08-Feb-07 ISR problem DMB0524 set aside during ISR testing 2703 08-Feb-07 ISR problem DMB0531 set aside during ISR testing Note: Date shown here is when entered, not when tested 13-Nov-19 ME I&C -- PC Electronics

ME I&C -- PC Electronics 19-April-05 Earlier Problems 2 Entry ID Date of Action Location status Serial N/O A (mfg) comment 2726 07-Feb-07 ISR problem EMUPC0021 2 broken connectors on BP 2689 08-Feb-07 ISR problem EMUPC0021 2 broken connectors on BP back side bottom RAT slots 7 & 8 2956 30-Mar-07 X3S41d20 problem RAT5438 replaced RAT in slice test 813 07-Jun-06 ISR problem TMB5058 fails "CCB Out" Test 814 07-Jun-06 ISR problem TMB5177 misaligned to backplane 822 07-Jun-06 ISR problem TMB5465 problem with RAT cards 824 08-Jun-06 ISR problem VCC0012 fails to download DMB firmware 827 08-Jun-06 ISR problem VCC0015 fails to download DMB firmware to far DMB 831 08-Jun-06 ISR problem VCC0021 fails to download DMB firmware 835 08-Jun-06 ISR problem VCC0025 hangs during TMB/MPC chain test 834 08-Jun-06 ISR problem VCC0026 fails to download DMB firmware to far DMB 2701 08-Feb-07 ISR problem CRB0017 failed startup test - 2700 08-Feb-07 ISR problem CRB0071 broken LV connector - dropped Note: Date shown here is when entered, not when tested 13-Nov-19 ME I&C -- PC Electronics

Summary of Recent Problems 19-April-05 Summary of Recent Problems A total of 14 problems were encountered in –Z testing and minus slice test DMB -> 8 problems TMB -> 2 problems MPC -> 1 problems CCB -> 1 problems Crate -> 2 problems These have come from a detailed testing series over 16 pcrates 13-Nov-19 ME I&C -- PC Electronics

ME I&C -- PC Electronics 19-April-05 Plan Setting up dedicated board test area @ B904 lab Multiple PCrates in place Computer in place Updating testing software on computer Ready from 12-June-07 Single test chamber in place Procedure at B904 Re-test each board in known environment All those listed in all 3 tables above Give experts a test facility to look at problem boards in detail Averaging close to 1 problem per crate Need to determine seriousness of each of these problems Can we find ways to prevent or to fix these in place in the future 13-Nov-19 ME I&C -- PC Electronics

ME I&C -- PC Electronics 19-April-05 Backup Slides Backup slides >> elog problem entries 13-Nov-19 ME I&C -- PC Electronics

ME I&C -- PC Electronics 19-April-05 Message ID: 2097     Entry time: Sat May 19 12:50:42 2007 Author:ignatenko, ignatenk@physics.ucla.edu  Type:PC commissioning Subject:Problem with VME-1_2 crate Dear all, last Friday we met a problem that related to peripheral crate itself. We weren't able to "talk" to ALCT on ME-1/1/03 CSC, which were connected to the slots 2 and 3. But we were able to download the ALCT firmware to the chamber and read back all necessary information (like status ALCT) through the slot #4. We tried to talk to ALCT on ME-1/1/04 CSC (this CSC normaly connected to the slot #4) through slot #2 and we failed again. Moreover, whichever TMB or RAT board were inserted into slot #2 they showed the same type of problem. The bottom line - something wrong with PC backplane (most probable something wrong with the connector between the TMB and the RAT boards). We are going to swap VME-1/3 and VME-1/2 crates in the peripheral rack and go on testing trigger sector -1/2. Once we get approval for crate replacement we will replace the PC. 13-Nov-19 ME I&C -- PC Electronics

ME I&C -- PC Electronics 19-April-05   Wed May 2 11:20:12 2007, Greg Rakness, Gregory.Rakness@cern.ch, Electronics, swapped DMB ME-2/1/8 and ME-3/1/10       Sun May 20 14:44:40 2007, Jianhui Gu, gujh@mps.ohio-state.edu, Electronics, swapped DMB ME-2/1/8 and ME-3/1/10 Message ID: 1939     Entry time: Wed May 2 11:20:12 2007     Reply to this: 2098 Author:Greg Rakness, Gregory.Rakness@cern.ch  Type:Electronics Subject:swapped DMB ME-2/1/8 and ME-3/1/10 Swapped out boards which are not acting correctly since the DMB firmware update... https://cmsdaq.cern.ch/elog/CSC/1936 ME-2/1/8: removed DMB074, replaced with DMB180 ME-3/1/10: removed DMB400, replaced with DMB300 13-Nov-19 ME I&C -- PC Electronics

ME I&C -- PC Electronics 19-April-05 Wed May 2 11:20:12 2007, Greg Rakness, Gregory.Rakness@cern.ch, Electronics, swapped DMB ME-2/1/8 and ME-3/1/10       Sun May 20 14:44:40 2007, Jianhui Gu, gujh@mps.ohio-state.edu, Electronics, swapped DMB ME-2/1/8 and ME-3/1/10 Message ID: 2098      Entry time: Sun May 20 14:44:40 2007     In reply to: 1939 Author:Jianhui Gu, gujh@mps.ohio-state.edu  Type:Electronics Subject:swapped DMB ME-2/1/8 and ME-3/1/10 Check these two DMBs in Building 904: DMB#400: The Controller FPGA was not programmed. Reload the PROM, the FPGA is programmed. Tried different ways (single, or broadcast), all worked. So, this is a good board. DMB#074: The controller FPGA was not loaded. Reload the PROM, the FPGA still can NOT be programmed. Load older version of firmware, still can NOT be programmed. The PROM was re-soldered after initial assembly. It looks to me that there was problem with this PROM. So, this is a bad board. Suggestion: replace the PROM. (could be connection?) 13-Nov-19 ME I&C -- PC Electronics