Review panel for LIEBE Thierry Stora – EN-STI-RBS.

Slides:



Advertisements
Similar presentations
Paul Scherrer Institut 5232 Villigen PSI EURISOL Kick-off meeting, L. Zanini EURISOL DS Task 4 L. Zanini PSI Kick-off Meeting CERN,
Advertisements

EURISOL Peter Butler University of Liverpool
NuPECC June 2007 The ISOLDE research programme Peter Butler (University of Liverpool) 1.The present 2.The future.
EURISOL DS : Status and Future Yorick Blumenfeld CERN-ISOLDE* We acknowledge the financial support of the European Community under the FP6 Research Infrastructure.
1 MEGAPIE Structural Materials : Is there a risk of failure? MEGAPIE Workshop Aix-en Provence, Nov MEGAPIE Structural Materials Is there a risk of.
EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay.
ISOLDE Yield Database Development
Yoro TALL Santiago de Compostela (Spain) June 7 – 10, Second IP EUROTRANS Internal Training Course on Nuclear Data for Transmutation: status, needs.
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
ISOLDE contribution to task 11 8.Prediction of secondary beam intensities Pierre Delahaye for the ISOLDE collaboration EURISOL DS Task 11 kick-off meeting,
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Town meeting – Helsinki – 17 th September 2007 Overview on EURISOL targets Thierry Stora on behalf of the Target Tasks.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
SPL, a driver for EURISOL? Yorick Blumenfeld* Isolde-CERN * On leave from IPN Orsay We acknowledge the financial support of the European Community under.
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5A. Marchix19/09/2013 Thanks to : AP. Bernardes/EN/STI, J.Blaha/DGS-RP,
LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.
Copyright © 2013 SCKCEN Pb-Bi target for Optimization toward higher yields SCKCEN Mentor : Dr. Lucia-Ana Popescu University Promoter : Prof.
The ISOLDE yield database Measured secondary beams intensities at ISOLDE Pierre Delahaye for the ISOLDE collaboration EURISOL DS Task 11 kick-off meeting,
Y. Romanets 1, R. Luis 1,J. Bermudez 3, J.C. David 5, D. Ene 5, I. F. Goncalves 1, Y. Kadi 2, C. Kharoua 2, F. Negoita 4, R. Rocca 2, L. Tecchio 3, P.
ISOLDE Workshop and Users meeting 2011 Nanostructured Calcium Oxide Targets for the Production of Argon Beams João Pedro Ramos 7 th of December 2011 Dr.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Opportunities for neutrino experiments at ISOLDE Tânia Melo Mendonça IFIMUP, Porto University and CERN.
Beam developments during the LS1
May 2013 LIEBE Project T. Stora 1 LIEBE Progress Report Coordination meeting – 3 rd SC CEA-Saclay, 24 th May 2013 T. Stora – EN-STI-RBS.
Target and Ion Source Development
Status of Target and Ion Source Group Developments 2013 Christoph Seiffert on behalf of TISD 1.
Prototype target tests with the ISOLDE Tape Station Tania M. Mendonca.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
ISCC/INTC 10-11Nov 2015T. Stora on behalf of R. Catherall EN/STI Technical news MENU Technical Issues: HRS coupling table piston - BTY Line water leak.
Page Production and Release of Gas and Volatile Elements from Sodium- based Targets E. Noah, 38 th Meeting of the INTC, 4 th November 2010 Production and.
EURISOL R&D projects Kick-off meeting Pb/Bi loop target Thursday 10 th of May 2012 A. MARCHIX & V. BLIDEANU/CEA collaboration with AP.Bernardes & J.Vollaire/CERN.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Welcome to the CHARMS See – Tea Saturday, March 05, 2016 Comparison of ISOLDE yields with calculated in- target production rates Strahinja Lukić,
João Pedro RAMOS ISOLDE Workshop 2015 Radioactive beams at ISOLDE: Status and Developments João Pedro RAMOS (CERN/EPFL) On behalf of the ISOLDE Target.
LIEBE: Design of a molten metal target based on a Pb-Bi loop at CERN-ISOLDE 6/25/2014 LIEBE project meeting1 T. De Melo Mendonca, M. Delonca, D. Houngbo,
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
Negative ion sources and Be ionisation studies Tania de Melo Mendonca on behalf of the TISD team EN-STI-RBS.
T. Stora ISCC – Nov 2014 (TISD) Beam developments ‏ Thierry Stora.
High Power Target Studies at CERN-ISOLDE Tania M. Mendonca, Melanie Delonca, Veronique Ghetta, Etam Noah, Thierry Stora.
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
Safety & Radioprotection 8 Jul. 2005, Liverpool, UK WP 5: Safety & Radioprotection Participants:role 1. GANIL, France - sub-task D 2.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
CERN-MEDICIS: Production d’isotopes selon l’approche « ISOLDE » pour la recherche médicale Thierry Stora EN-STI EN-GMS 5 th March 2013.
Summary of IAP comments from 2007 EURISOL Town Meeting
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
Friday, March 27 Today's Objectives
The Future of EURISOL Results from the Design Study
ISOLDE and n_TOF Consolidation
Beam developments in 2011 Target and Ion Source Development (TISD) Thierry Stora, EN-STI-RBS With input from many different colleagues.
for the EURISOL Steering Committee
Dorothea Schumann, Jörg Neuhausen, Tânia Melo Mendonça, Thierry Stora
Status of the beta-beam study
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Accelerator R&D for Future Neutrino Projects
Difficult beams accepted in 2014 (updated since last meeting)
GUAPI working group meeting June 26th 2013
Ana-Paula Bernardes EN-STI-RBS
TISD BeO tests 1st learnings
A. Herlert, CERN PH-SME-IS
Alexander Herlert, CERN (PH-SME-IS)
Richard Catherall EN-STI-RBS
Presentation transcript:

Review panel for LIEBE Thierry Stora – EN-STI-RBS

Larger framework of high power targets: ISOL specificity : release of isotopes, “high T” Melanie Delonca’s PhD 1st high power oxide direct ISOL Target @ TRIUMF 1st salt target at ISOLDE-PSB And also some hard learning cases 21 March 2019 LIEBE Review

Initial concept & LIEBE prototype Conceptual design + prelimin. tests, E. Noah et all, EURISOL-DS (2005-2009) Critical Weber number for small droplet formation from LBE  possibly solves the main Liquid target drawback of slow release Double enclosure, etc Test and beam at the offline separator 21 March 2019 LIEBE Review

Review Presentations available there : https://indico.cern.ch/event/805955/ 3rd June 2019 LIEBE - GUI meeting

Review Conclusions 3rd June 2019 LIEBE - GUI meeting

The promises with a fast released molten metal loop

Where do we stand today 100Sn physics potential for HIE-ISOLDE Options to complete the lessons learned action : failure analysis at IPUL (LBE spill in ion source/F End) Offline operation of (modified) LIEBE with LBE at CERN Define the optional LIEBE-next project: La-base option, safety file requirements, RP and waste management to be evaluated by EN-STI 5/06/2018 ISCC

Initial pists to complete this phase French ANR : REPARE (lead by GANIL (G d France), with Arronax, Subatech, CERN : passed 1st evaluation phase wih rather positive evaluation. SCK.CEN contribution in the framework of the CERN-SCK MoU under discussion 3rd June 2019 LIEBE - GUI meeting