Technical Excellence Practical Experience Client Responsiveness Misc. Notes: Questions they asked Why use Langan not AKRF, VHB? Size, speed, cost, connections?? In-house vs. sub services? Importance of community interaction, ability to speak to and present in front of people in laymans terms They look for OUR connections, expertise, in-house track record (on all projects), multi-discipline (1) Speed (2) connections (3) quality of proposal Technical Excellence Practical Experience Client Responsiveness
Geotechnical Solutions John J. McElroy Jr., Ph.D., P.E. 215.845.8912 (office) 215.280.5522 (mobile) jmcelroy@langan.com Philadelphia Office 1818 Market Street Suite 3300 Philadelphia, PA 19103 Jared M. Green, P.E. 215.845.8900 (office) 914.720.3920 (mobile) jgreen@langan.com 16 March 2018
Langan Engineering and Environmental Services, Inc. Soil Nailed Wall at Highly Sensitive Site (Staten Island Courthouse – SI, NY) Jared M. Green, P.E. Langan Engineering and Environmental Services, Inc. 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Site Location 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Site History and Background 4 acre site – for proposed Courthouse and Parking Garage Approximately a 35 ft differential in ground elevation across the site About 20 ft across the proposed 46,930 sq-ft courthouse About 15 ft across the proposed 48,860 sq-ft garage Located at the former Marine Quarantine Hospital 1. The site is currently an asphalt paved parking lot and is located within the northeast portion of Staten Island, called the Tompkinsville area. 2. Due to the sloping topography of the site, the proposed courthouse and parking garage structures will be constructed into the slope. 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Marine Quarantine Hospital From 1799 to 1858, this quarantine hospital treated sick immigrants – taken directly from ships that entered New York Harbor 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Marine Quarantine Hospital In the late 18th Century, people were seen by physicians while their ships were anchoring in New York Harbor If they were thought to have infectious deseases, they were taken to the Marine Quarantine Hospital Some patients recovered and were discharged Others did not and were buried in a rude graveyard on the campus. This is a glimpse of immigration – long before Ellis Island (circa 1892)… http://www.ellisisland.org/genealogy/ellis_island_timeline.asp 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
They complained of the terrible odors. Neighbors of the hospital repeatedly repealed to the authorities to close hospital. They complained of the terrible odors. They complained of people in the community getting sick. 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
In 1858… The Hospital was Burned Down… …by the community! Gates were battered down Each building was emptied of the residents. Each building was then burned down. No one went to jail for the fires… Arson was defined as burning down a house… …with people in it 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
This was well documented in Staten Island’s historic documents... 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Site History and Background The history of the site became apparent after an environmental review conducted in 2000. An archaeological survey performed in 2006 resulted in the discovery of human remains in the northern corner of the site. 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Site History and Background The new buildings would be constructed south of the cemetery. The skeletal remains removed during the survey would be reinterred in the cemetery at the end of construction. The “Memorial Green”, park will cover the area of the cemetery. 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Subsurface Investigation 31 borings were drilled 5 observation wells were installed 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
SOE Constraints Buffer Zone Unexamined Cemetery 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Final SOE Constraints No excavation is permitted within this zone Buffer Zone Unexamined Cemetery No excavation is permitted within this zone Drilling is permitted within this zone No work is permitted within 5 ft of the Unexamined Cemetery No work is permitted within this zone 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Soil Nail Wall – Plan View 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Final Soil Nail Wall Configuration 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Soil Nail Design Permanent condition – 22 ft high wall; FS=1.51 Temporary condition – 27 ft high wall; FS=1.31 SV = 5 ft; SH = 4 ft; 3 - 5 rows of nails required Nail Grout 3,000 psi w:c ratio 0.40 Shotcrete 4,000 psi (pump mix) w:c ratio = 0.39 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Soil Nail Installation 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Soil Nail Installation 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Soil Nail Installation 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Soil Nail Installation 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Soil Nail Installation 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Soil Nail Installation 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Soil Nail Installation 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Completed Soil Nail Wall 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Completed Soil Nail Wall 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
General Observations and Monitoring Results 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Foundation Wall Construction 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Thanks! 6th Annual Statewide Structural Engineers Conference – State College , Pennsylvania – 7 June 2018
Geotechnical Solutions John J. McElroy Jr., Ph.D., P.E. 215.845.8912 (office) 215.280.5522 (mobile) jmcelroy@langan.com Philadelphia Office 1818 Market Street Suite 3300 Philadelphia, PA 19103 Jared M. Green, P.E. 215.845.8900 (office) 914.720.3920 (mobile) jgreen@langan.com 16 March 2018
Technical Excellence Practical Experience Client Responsiveness Misc. Notes: Questions they asked Why use Langan not AKRF, VHB? Size, speed, cost, connections?? In-house vs. sub services? Importance of community interaction, ability to speak to and present in front of people in laymans terms They look for OUR connections, expertise, in-house track record (on all projects), multi-discipline (1) Speed (2) connections (3) quality of proposal Technical Excellence Practical Experience Client Responsiveness