Università di Catania and INFN – Sezione di Catania

Slides:



Advertisements
Similar presentations
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
Advertisements

CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
CMS Tracker Week, CERN, July July 2003Tracker Week - Bonding WGSalvatore Costa - Catania Bonding-DB Usage or lack thereof.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Resistor An electrical component that limits or regulates the flow of electrical current in an electronic circuit.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
Electronic Component Functions What is this component doing my in electronic device?
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
Circuits and Symbols. The flow of electrons through a circuit Electricity A closed circuit allows electricity to flow An open circuit has a break so electricity.
Press Esc to Exit ©2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
Catania Integration site 5/11/15 Integration meeting 5 Nov 2015 Latest activities in Catania site 1.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Strasbourg status Ring 7 pilot run François Didierjean.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Catania Production Center S.Albergo Universita’ & INFN Catania.
Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.
Chapter 22 Electrical Systems. Textbook page 169, 171.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Basic Quality Control Tools. Flowchart Check sheet Cause-effect diagram Pareto chart Histogram Scatter diagrams Control chart.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
6.2 ELECTRONICS. CAPACITOR An electrical device used to store electrical charge.
Using a Mulitmeter A digital multimeter is a test tool used to measure two or more electrical values—principally voltage (volts), current (amps) and resistance.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
Time Value of Money Annuity.
Status Report on Bonding at Catania
Questions-DCF.
Coach Guttmann Economics
Universitat de Barcelona
Transistors and Integrated Circuits
Circuit Breakers & Reclosers
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Present Perfect Vs. Past Simple 1) John Lennon made a lot of records
Spending plan Essentials
FNAL Module Testing Status
Module Production Status in Florence
What are the different tenses used in these sentences?
Bari production centre resp. M. de Palma
OGP Surveying & DB Entry
7J Revision Quiz.
Budgets.
FNAL module testing summary
Module Failures on Rods
Parallel Circuits 119.
302.2.
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005
Circuits.
Circuits _____________ ______________
Money Demand Worksheet Answers
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

Università di Catania and INFN – Sezione di Catania Bonding in CATANIA Salvatore Costa Università di Catania and INFN – Sezione di Catania

Catania: recent activity Machine broke ~2 months ago For a while tried over and over to fix it by ourselves to save money, given the current stop in the flow of incoming modules, but could not get machine back to normal behavior. Had to get service by Palomar Technologies (5 k€) Mechanics fixed and adjusted Faulty electronics components (capacitors, integrated circuits) located and replaced by our own electronics technicians After this fixing, bonded 13 modules with excellent visual bond foot quality and good pull test results [not yet in DB]: 11-13 g, all FBHB.

Catania: accounting Module Type IB34 IB12p IB12sl IB12sr Total 85 45 Received from Gantry 85 45 14 15 159 Bonded 80 125 ARC tested 78 123 OK 75 43 118 bad 3 (IV) 2 (LV) 5