ME I&C -- PC Electronics 19-April-05 Status of LV + endcap LV ready for operation ALL of plus end ready to begin operations ME+1 far side being run for pcrate testing DCS panels are run directly on S4F10 DCS computer New procedures posted http://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/Procedures-LV-OnOff.htm For cold startup/shutdown For overnight startup/shutdown Next to do Need to install air ducting in ME+(-)1 X2 Maraton racks Remember we are in supervised operation only DSS not final Rack DCS not final Safety review not made 22-Nov-19 ME I&C -- PC Electronics