ME I&C -- PC Electronics

Slides:



Advertisements
Similar presentations
Hospital of the Future Construction Update as of Dec. 3, 2010.
Advertisements

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Jeremy Hamman & Greg Wemer Wright State University Managing a Mac Dual Deployment.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
computer
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
Dc bus for photovoltaic power supplying computing loads 4 th year Electronic Engineering Michael ikerionwu.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Design and realization of experiments for an embedded Linux Laboratory class. Student: Andrew Sweeney Supervisor: Peter Corcoran Final Year Project Electronic.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
22-March-2010CSC DCS Instructions1 Top Level of CSC DCS UI Communication Status Majority Logic Subsystem Panel HV, LV, FEDS CSC End View * CSC * PCrates.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
CALO News Pascal Perret LPC Clermont 22 January 2012.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
Learning and remembering.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
PLUS.
PIXEL CAEN Installation Status
Cabling for LHCb Upgrade
LKr status R. Fantechi.
Rack Design Proposal as of 01/03/2013
Integration and Services RE3/1 and RE4/1
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
General aspects: Optical links :
Institute of Nuclear Physics Polish Academy of Sciences
SUPERVISION SYSTEM IMPREGNATING LINES
CMS Area Working Group Meeting
EMU Slice Test Run Plan a working document.
CSC - HV, LV - Present Status and Future Plans Toward Phase 2
Status of the cryogenic system for B180
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
CSC Electronics Installation and Commissioning CSCE I&C
B904 Status Report by Fred B.
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
B904 Status Report by Fred B.
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
UXC55 ME Muon Endcap On Detector Layout
مديريت موثر جلسات Running a Meeting that Works
Each month you need to do these:
Fred’s Input to Rice Workshop
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
YE+3 Changes YE+3 X4A51 S4F04 Additions for TS ME+4/2/x chambers
Equipment Management DB Rack Wizard USC55 Underground Counting Room
CSC Electronics Installation and Commissioning Oct ‘06
CSC Status Report Status reports;
B904 Status Report by Fred B.
CSC Electronics Installation and Commissioning CSCE I&C
CSC DSS Status Report by Fred B.
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

ME I&C -- PC Electronics 19-April-05 Status of LV + endcap LV ready for operation ALL of plus end ready to begin operations ME+1 far side being run for pcrate testing DCS panels are run directly on S4F10 DCS computer New procedures posted http://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/Procedures-LV-OnOff.htm For cold startup/shutdown For overnight startup/shutdown Next to do Need to install air ducting in ME+(-)1 X2 Maraton racks Remember we are in supervised operation only DSS not final Rack DCS not final Safety review not made 22-Nov-19 ME I&C -- PC Electronics