Liceo Scientifico “A. Volta”

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

SMG facility – 24k Square Feet. Drilling We have 7 fully automated Excellon Drilling/ Routing machines. The drilling program is generated from the customer.
Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Shantanu Menon Thomas Irons Michael Jacoutot. Cosmic Rays  High energy particles (mainly protons) from outer space.  Have up to 10 million times more.
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
Stations There are six stations of RPCs. They are 1-3 north, and 1-3 south. RPC3SRPC2S RPC1SRPC1N RPC2NRPC3N This document is available at
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Characterization And Testing Of 2m X 2m Glass Resistive Plate Chamber Mohammed Salim M Aligarh Muslim University.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
AR4702 (cover plate replacement) Remove existing cover plate by removing the 2 x screws fixed through the top of the plate into the chassis (Phillips screw.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
First detection of extensive air showers with the EEE experiment CRIS 2010, Catania, September  Introduction to EEE project  The MRPC detector.
Measuring the Position Resolution of a COMPASS Drift Chamber Prototype Rojae Wright 1, Ihnjea Choi 2, Caroline Riedl 2, Matthias Grosse Perdekamp 2 (1)
Design of a readout system for RPCs Olu Amoda2 The LODEN Group The group is an association of Fermilab scientists who teamed up to build a cosmic ray.
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
ROV Cameras. Extending Your Camera We want your ROV to be able to see the sea! (And the pool)
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
M. Bianco On behalf of the ATLAS Collaboration
Collaboration Meeting Argonne National Laboratory June 10-11, 2010 Mechanical Design of Glass Tiles and Trays Rich Northrop University of Chicago Second.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Slide 1Crispin Williams INFN BolognaALICE TOF The ALICE-TOF system 1. Quick overview of the TOF system that we are building 2. The Multigap Resistive Plate.
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
Measuring the Position resolution of a COMPASS Drift Chamber Prototype Rojae Wright, Mathias Perdekamp, Ihnjea Choi, Alabama A&M university, University.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
The ALICE-TOF system 1. Quick overview of the TOF system that we are building 2. The Multigap Resistive Plate Chamber -what is it? 3. Difference in.
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
GRPC development in Lyon
European DHCAL Meeting 13/06/08
(On Behalf of CMS Muon Group)
Update on Pavia MM mechanical prototype
Dept. of Physics and Space Sciences, Florida Institute of Technology
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
"Cosmic pi vs. EEE: different tools for the same goal"
Preliminary Y-chamber specifications – First draft
An improved design of R-MSGC
Studies on TH2 chamber Michele, Maria, Givi, Joerg
GRPC activity for EuDHCAL in IHEP-Protvino
Multigap Resistive Plate Chambers (MRPC)
Investigation on tray MID 063 Back
First of all we will remind some numbers:
WORKSHOP PRACTICE WEEK-3 OBJECTIVE OF LAB-2 To be familiar with the capacitor and the inductor.
HPL DG d=1.4mm/e= mm.
Test box for ProtoDUNE SP – Integration Test
Design of Distribution Feedbox at LHC P7
SIT AND FTD DESIGN FOR ILD
Study of Chinese oil-less chamber
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Han Jifeng BESIII MUON GROUP IHEP, CAS
STAR TOF MRPC Mass Production & Q.C. (USTC)
MRPC -High Time Resolution Detector R&D at USTC CHINA Chen, Hongfang 2001/Oct. Oct.2001, Beijing MRPC,USTC.
construction and tests
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Electronic Signals How do electronic signals convey information?
EEE telescope simulation
(On Behalf of CMS Muon Group)
COSMIC BOX: Boxing the Dark
Presentation transcript:

Liceo Scientifico “A. Volta” Reggio Calabria Referent teachers: Prof.ssa Caterina Romeo Prof.ssa Carmela Petronio Students: Giuseppe Alampi Francesco Chirico Chiara Fortugno Maria Gattuso Fortunato Martino Francesco Modafferi

Our experience From the 10th to the 16th of March 2019, a group of six students, attending the fourth class of the Scientific Lyceum “A. Volta” of Reggio Calabria, together with their teachers, prof.ssa Caterina Romeo and prof.ssa Carmela Petronio, went to CERN, in Geneva, in order to build a new cosmic-ray detector for their school. The detector will be sent by CERN by the end of June. The electronic part will be finished by these students at the University of Calabria, under the supervision of prof. Schioppa. Hopefully, by the beginning of the next session, the telescope will be operative.

The building process The external box, which contains the detector, is 2m x 1m and it is made by aluminium panels. The support base chosen for the chamber is made of honeycomb panel. We put some strips of double-sided tape on the honeycomb, on which we applied vetronite (a green material). On the vetronite, we drew some lines on which we put copper strips in parallel, with a distance of 3 mm between every strip.  

The strips are electrodes that reads signals: there are both anodic and cathodic strips, used for transmit the particles of signals at the edge of the layers. We applied 24 strips, both on the top and the bottom of the chamber. At the end of each strip, we welded iron, to connect electric cables later. The vetronite panel isolates the strips from the high voltage floor above them, that is a glass plate with a resistive coating.

We had to clean the glass plates from wax and dust, before assembling the chamber. Then, we moved each plate to the honeycomb, thanks to a vacuum transporter, which guarantee not to break the glass. We applied a resistive coating on the inner part of the outer plates, to make high voltage floors.

The structure of the detector consists of six gaps, that will be filled with gas. We made a space of 350 micron between each glass, using a fishing-line and fixing it around nails. We put the glasses one upon the others and then pressed them in order to let them adhere to the tape. Then, we used a scalpel to remove the film of the tape. When we finished applying the six glass plates, we closed the chamber with the top panel.  

Then, we welded twisted-pair cables with the copper strips both on top and bottom panels. The chamber was moved into the aluminium panel built before. The building process was repeated three times, for each chamber.

And that is our final product!

Thanks for your attention!