EU Update Transmission Workgroup 3rd October 2019.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
European Developments Transmission Workgroup 5 th April 2012.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
EU Developments Transmission Workgroup 6th October 2011.
1 Warsaw, 16 October 2012 the system, that connects New Gas Market Model in TNC.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Understand Web Services
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
Update on e-Placement at Aon Ian Summers. Aon Limited is authorised and regulated by the Financial Services Authority in respect of insurance mediation.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
All Island Single Electricity Market IWFA Update Laura Brien
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
22 – 23 November 2007 GIE Annual Conference How the Third Package might encourage investment.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 1 st December 2011.
European Developments Transmission Workgroup 3 rd May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
GC0104 – Demand Connection Code (DCC)
Gas Regional Initiative South South-East
EU Phase 3 Customer communications
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
GRI North-West Meeting
19th GRI Coordination Group meeting
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Enagás, GRTgaz, Reganosa, REN and TIGF
Capacity Conversion – 616s
EU Implementation Programme
26th IG meeting 23th January 2014
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Allocation of Capacity in Portugal Under the New Regulation
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
ACER’s view on the future role of the Gas Regional Initiative
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
GRI North-West Meeting
HMM E-SERVICE.
Transparency Platform
Transparency from a practical point of view ENTSOG Transparency Workshop Brussels, September 11, 2012.
26th February 2015 Teleconference
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
Proposer: National Grid NTS Panel Date: 17th April 2014
GRI North-West Meeting
Implementation of the Network Code Balancing in the Netherlands
26th February 2015 Teleconference
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative South South-East
Entry Capacity Transfer and Trade
Transmission Workstream - EU 3rd Package Update
Gas European Network Code Implementation
ACER’s view on the future role of the Gas Regional Initiative
Gas Regional Initiative South South-East
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

EU Update Transmission Workgroup 3rd October 2019

Interoperability Update: EU Data Exchange Equinor raised an issue on the Functionality Platform: EU capacity booking platforms (such as PRISMA, GazSystem, RBP) as well as some TSOs use different interfaces and data exchange solutions for CAM/CMP capacity trading processes. Current EU Code obligation is for ‘interactive’ data exchange (i.e. a web portal) for capacity trading processes Equinor recommend changing to a ‘document-based’ solution using Edigas- XML format ENTSOG and ACER have assessed the issue as valid for the FUNC process, of EU-wide relevance The first stakeholder meeting was held on 24th September 2019

Feedback from the meeting Equinor presented the case for change: EU shippers currently manage multiple interfaces and standards with platform operators to book their capacities, including Edigas XML, Proprietary format, via protocols AS2/4, https, SOAP (web services). Standardisation to Edigas would: Reduce shipper operating costs due to greater automation Avoid logging into a web portal to book capacity which is time consuming Reduce the risk of manual errors Facilitate easier tracking of capacity bookings, reducing risk of nomination penalties Facilitate competition among platform operators

Feedback from the meeting Platform operators summarised the data exchange solutions they currently have in place Some operators were concerned that mandated use of Edigas might constrain their service offering, e.g. PRISMA use their own XML format which allows new services to be introduced quickly Possible to implement Edigas for the CAM/CMP processes but not others, e.g. downloading auction results, therefore multiple standards would still be needed Some felt that AS4 is costly, has a slow time to market for new interfaces/features and people with skills to develop and maintain it are scarce  Next step: Public consultation later in 2019

Markets Area Update ENTSOG will be gathering information from TSOs shortly to enable the production of implementation monitoring reports for submission to ACER for the Balancing, Tariffs and CAM EU Codes Biennial Demand Assessment Reports are being prepared by TSOs for submission to ENTSOG (Art 26 of CAM Code)