Town Hall Assessment and Design Progress Update THRAC

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Construction Contracting
Lessons Learned: CM at Risk & Design Build
December 9, 2014 San Diego County Office of Education ESFG Meeting Tyree Dorward:Attorney, Best, Best, & Krieger Guiselle Carreon: Commercial Warrants.
Uniform Public Construction Cost Accounting (UPCCA) presented by: Kevin Cobb AIA/ARA, the Addington Partnership William Duncan IV, Taft College December.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
1 CDBG Procurement Requirements For Local Officials.
Risk & Responsibility Understanding Contract Surety Understanding Contract Surety.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
Commonwealth Self Bonding Program by the Department of General Services – Division of Engineering and Buildings Department of Treasury – Division of Risk.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
1 William Paterson University NJHEPA New Jersey Higher Education Purchasing Association Members: Kean University Monmouth University Montclair State University.
Chapter 2 Introduction to Construction Procedures
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Introduction to Procurement for Public Housing Authorities Independent Cost Estimates and Cost/Price Analyses Unit 3.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
BLAKELY  Welcome.
Design process.
Joint Parking Task Force Update Procurement & Strategic Sourcing
Joint Parking Task Force Update Procurement & Strategic Sourcing
Cohasset Town Hall Renovation Advisory Committee (THRAC)
Joint Parking Task Force Update Procurement & Strategic Sourcing
CM at Risk v. Design-Bid-Build
Bidding Requirements Review Questions.
Understanding The Benefits Of Surety Bonds
Managing Construction Projects
Operations Update 15 November 2012
Caryl School Open Hearing March 26, 2007.
Cohasset Town Hall THRAC August 29th, 2017.
Joint Parking Task Force Update Procurement & Strategic Sourcing
Punch list / Close Out - Project Completion
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Procurement & Strategic Sourcing
Cohasset Town Hall Renovation Advisory Committee (THRAC)
Procurement & Strategic Sourcing (FPM USB HVAC FIRE ALARM 2018)
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Thank you to our Sponsors
SEC Distribution Field Force Overview
Pre-contract Planning and Practice
Finance Summer Training
Procurement & Strategic Sourcing FPM PRB Freezer Farms HVAC
Procurement & Strategic Sourcing USB Roof & Structure Repairs
Procurement & Strategic Sourcing Social Work Roof Replacement
Procurement & Strategic Sourcing Woodward and Warren Greenspace 2018
Washington Metropolitan Area Transit Authority (WMATA)
Traditional Steps Leading To A Bid Document
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
Procurement.
Procurement & Strategic Sourcing
Design process.
Request for Proposal and Specifications for
Constructed c.1932 Designated as a Master Plan Historic Site in 1979 Significant for commercial and social history related to the Depression A unique.
Cohasset Town Hall THRAC August 29th, 2017.
Procurement & Strategic Sourcing
Prime Factors for Successful Preservation Treatments
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing School of Social Work Phase II
FPM State Hall DTE PLD Electrical Conversion June 26, 2019
FPM State Hall DTE PLD Electrical Conversion June 26, 2019
FPM School of Social Work Phase II Renovation Project No
State Hall Elevator Improvements Phase 1 August 19, 2019
Presentation transcript:

Town Hall Assessment and Design Progress Update THRAC Town Hall Assessment and Design Progress Update THRAC Daedelus Projects McGinley Kalsow & Associates

Deteriorated cornice on the West Elevation of Historic Town Hall Deteriorated cornice on the West Elevation of Historic Town Hall. Note lack of copper or lead cladding. Cohasset Town Hall

Detail view of chimney crack. Cohasset Town Hall

Existing asphalt shingle roof is near the end of its life Existing asphalt shingle roof is near the end of its life. Missing shingles should be replaced before August 30th. Cohasset Town Hall

Gutter placement and mounting details have led to some failures Gutter placement and mounting details have led to some failures. Gutter was going to be attached by town; but long-term solution is to replace gutter with institutional hung gutter. Cohasset Town Hall

Loose and bowed clapboards due to poor nailing through insulation board. Cohasset Town Hall

Historic, character-defining features remain at this impressively sized and proportioned space. Re-creation of such space is costly today. Cohasset Town Hall

Much of the required Town Hall infrastructure is current, code-conforming and functioning well. Existing Town Clerk’s vault meets the Secretary of the Commonwealth’s requirements for record storage. Cohasset Town Hall

Lower Level Records Storage Vault is conforming and functions well. Cohasset Town Hall

The quality of the interior space is very good at some offices. Cohasset Town Hall

Structural Analysis Cohasset Town Hall

Historic Color Analysis Cohasset Town Hall

Site Options Cohasset Town Hall

Cohasset Town Hall

Cohasset Town Hall

Programming Cohasset Town Hall

Project Phases and Process Owners Project Manager & Designer Selection Design Program/Feasibility Study Approval to Proceed to Design and Bid Schematic Design Design Development Construction Documents Prequalification & Bidding Approval to Proceed to construction Construction Completion & Occupancy

M.G.L. 149 Building Construction Contracts Procedure: Contracts above $10,000,000 prequalification of general and filed sub-bidders required Contracts below $10,000,000 prequalification is optional DCAMM certification required for general bidders above $150,000 DCAMM certification required for filed sub-bidders above $25,000 (17 categories) Invite sealed bids from prequalified general and filed sub contractors Bid deposit of 5% of the value of the total bid or sub-bid required Contract must be awarded to lowest responsive and responsible bidder 100% Performance and Payment bond required Must pay prevailing wage

Cohasset Town Hall