Door Panel Door panel can open after 1800 angle /KK/12_RPP_6

Slides:



Advertisements
Similar presentations
The MATURA System, an overview. Matura Slide series The Matura System, an overview.
Advertisements

Electrical Installation-Module 3
Section 4.1 – Vectors (in component form)
“Enerpak” Units » Propeller Type Fan » Size 100 – 400 MBH » 80% Thermal Efficiency » Natural or LP Gas » 10 Year Warranty on Heat Exchanger, Burners,
Our Quasi-Broadband Home. Dave’s PC Sandy’s PC Card scanner and camera.
Place Measuring Tape at BOTTOM of Upper Rail and Measure Downward Towards the Bottom Rail HEIGHT MEASUREMENT (TOP)
HTS5120 Rework Instruction for service centre Nov 18, 2010.
Graphics Assignment. I was asked to do a mug design thing so here it is.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
TECHNICAL TRAINING 2008.
VS Compact Slim Enrique Rodriguez Head of Product Management.
AR1FS Debugging Guide Critical Components Mitch Newcomer August
© 2007 Ray S. Babcock Tracks Game is played on a (nxn) set of squares. There are three possible moves (labeled A,B,C). Players alternate making a move.
Equipment for VRI zone control – up to 5400 management areas Valley PRO2 + Valley VRI.
Electrical Wiring Three-Way Switches. Three-Way Switch.
Lines Identifying Different Types of Lines. LINES There are many different types of lines. Can you think of any? vertical horizontal diagonal perpendicular.
Navigate to the User Control Panel Click on User Control Panel Site:
INTRUSION ALARM TECHNOLOGY
You can type your own categories and points values in this game board. Type your questions and answers in the slides we’ve provided. When you’re in slide.
Electrical Components.  This supplies all the power to the robot. It is a single 12 V battery. They are sealed to prevent battery acid from leaking.
Transition Board Redesign aka: The Connector Project Project Manager: Ashley Walker Teammates: Brad Westgate and Bryn Hollen NASA Mentor: Dr. F. Scott.
X-box Factoring. Step 1: Set up X- Box Factor ax 2 + bx + c Product a  c Sum b.
Wiring Schematics 101 Electrical Symbols Supplemental Inflatable Restraint (SIR) or Supplemental Restraint System (SRS) Icon This icon is used to alert.
A VISUALOVERVIEW WU PROFILE SYSTEM. LOGGING INTO WUPS PCF DOM.
Air Racer Design and Layout.
Setting up the Ricoh C305 Press F5 to start the Presentation
Electrical Materials Continued. Powering your home Homes in Ontario now have Smart Meters, these meters keep track of how much you use and when. The idea.
Vacuum system.
Connecting solar cells in series
Part IV: Finishing The Layout – Finishing Touches and Design Rule Check September 24-28, 2012 Carol Lenk Introduction to Prototyping a LED Driver.
RAKING MOULDS by Greg Cheetham. Start with an original mould with square corners as it will sit in the square corner of the side wall and raked ceiling.
Trace connecting two pads! More than 45 degree bends Traces too close together Rule of thumb: traces at least 40 mil apart.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
Precept Marine Conventional Control Panels
The angle of elevation of an antenna is 43 0 as shown in the diagram. a.If the distance along the base is 36 feet, estimate the height of the antenna.
Details of 28” LED segment
TRIANGLES OF THE PYTHAGOREAN THEOREM KENDAL GRIGGS & JAY WILLIAMS.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
Move 2 racks G16-RR2-4 G16-RR2-3. G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT 8 G15-PP-01 CKT Power Feed.
Optimization Problems
Notes taken from Gillette’s Designing with Light.
Multiplying Fractions. Fraction Multiplication Here are some fraction multiplication problems Can you tell how to multiply fraction from these examples?
Page 1 Hardware Disassembly | © 2008 Lenovo Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Please.
SIZE - Top SERVER ROOM Designed by – openbox |
Figure 3-9: Implementing the Load Diverter CAUTION Do NOT connect the wires to the Diversion Load Controller or the terminal block at this point. IF.
© ExplorNet’s Centers for Quality Teaching and Learning 1 Use appropriate tools for network cabling and connections. Objective – 2%
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
PostBase Automatic Feeder Component Removal Service Training
MKTG 2016.
TOWER 3 CONFIGURATION Configuration:
News about the WA104 Programme
WARNINGS Side Description COMPONENTS SIDE (TOP) EXPRESSIONS BOARD 1/2
Blackbird 002 – Value Proposition
قراءة القوائم المالية وفـاء شـريف علي. محلل مالي
FeMaidens Programming
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
Front panel wiring PICO 155
MKTG 2016.
Reengineering and Technology
Chassis Power Regulator Board
Bridge through Ten Addition
Door Panel Door panel can open after 1800 angle /KK/12_RPP_04
Panel Detailed Design 12” L R Bottom (21.75 x 16.5) A1 platform
Reader Swap out Guide.
Miniature Train Smoke Stack.
Identifying Different Types of Lines
Top panel: AUC0–31h of M1 and glargine in the nine individual subjects (M1, open circles; glargine, filled circles) and median and 10th, 25th, 75th, and.
support a power pole that is 15 meters
Building pattern  Complete the following tables and write the rule 
Door Panel Door panel can open after 1800 angle /KK/12_RPP_05
Presentation transcript:

Door Panel Door panel can open after 1800 angle 1800 011/KK/12_RPP_6 22/11/2019

Box Panel 011/KK/12_RPP_6 22/11/2019 Board panel

Board Panel board panel Up Pipa kampuh (canal cable) Rel Omega (profil F) Terminal deret (line up terminal) Down 22/11/2019 011/KK/12_RPP_6

Location of Control Component Up Top of board Using to wiring protection Door Bottom of board Using to wiring control component Line up terminals and source terminals Down 011/KK/12_RPP_6 22/11/2019

WIRING PANEL ΥΔ 011/KK/12_RPP_6 22/11/2019