That person will have been involved in the planning of the work.

Slides:



Advertisements
Similar presentations
ICT Services Suppliers Briefing Thursday, 17 September 2009.
Advertisements

University of Glasgow Major Capital Projects Project Governance Gateway Process.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Managing the Health and Safety of Contractors
Effectively applying ISO9001:2000 clauses 6 and 7.
ALO Planning & Assurance Requirements
Charging and financial assessment Care Act Outline of content  Introduction Introduction  Conducting the financial assessment Conducting the financial.
Line Blockage Guidance for Planners & GZAC
Planning & Delivering Safe Work. /23-May-15 Presentation Title: View > Header & Footer 2 Planning & Delivering Safe Work 10 point plan overview Roles.
Welcome Module 17 Activities Outdoors. Aim To enable adults to plan and run exiting, safe and developmental activities outdoors for the young people in.
Risk Assessment – An Essential Standard
SHE Code 34: Electrical Safety Safety, Health and Environment (SHE) Group.
National Standards for Safer Better Healthcare
/ 1 Line Blockage Guidance for IWA,COSS or PC Operational Close Call Line Blockage Group 24-Mar-14.
Overview report of a series of FVO fact- finding missions and audits carried out in 2012 and 2013 in order to evaluate the systems put in place to give.
Workforce matters How to workforce plan to support
Prime Responsibility for Radiation Safety
3D LEISURE - Health & Safety Refresher Training Manual.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Conducting business the right way Nobody should get hurt or made unwell by what we do GROUP HEALTH, SAFETY & WELLBEING POLICY Version 1 [August 2016]
ETHICAL ISSUES IN HEALTH AND NURSING PRACTICE CODE OF ETHICS, STANDARDS OF CONDUCT, PERFORMANCE AND ETHICS FOR NURSES AND MIDWIVES.
Introduction to Workforce Planning
Internal Audit White Paper
Standard 019 Update Briefing
Standard 019 Update Briefing
Standard 019 Update Briefing
Solihull Review of Urgent Care Programme Approach And Governance 2013
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
The same report also stated that:
Successful Integration is a result of good governance – getting the wiring right Integrated care as an aspiration is simple, and simplest if one begins.
Health and Safety Policy
Rebecca Rhodes, Senior Associate, UVAC
Priorities and system changes
Safety Accountabilities
Considerations If viewing this presentation in slide show format; you will not see all of the extra information supplied within the footnotes. If you want.
What is performance management?
Temporary Works Co-ordination
Project Roles and Responsibilities
Design Risk Management Spotlight on CDM 2015
Standard 019 Update Briefing
Smart Employment Solutions is the trusted name in Apprenticeships and Traineeships across Brisbane and Gold Coast. For advice and options call us on 07.
NR/L3/OHS/019-IP Work Instruction Briefing
SHE Code 34: Electrical Safety
Introduction In the first lesson we demonstrated the following:-
Standard 019 PDSW “One Year On”
Considerations If viewing this presentation in slide show format; you will not see all of the extra information supplied within the footnotes. If you want.
Safety Hour Discussion Pack
OHS Staff Introduction Training
Safety Hour Discussion Pack
STFC Safety, Health and Environment (SHE) Codes
MMU Project Management Community of Practice
Role & Responsibilities: Surrey Safeguarding Children Board (SSCB)
Nick Bonvoisin Secretary to the Convention on the
Introduction to the role of Sector Official/Marshal in Charge
Line Blockage Guidance for IWA,COSS or PC
Management Verifications & Sampling Methods
Safety & Health Programs
Safety & Health Programs
Portfolio, Programme and Project
Plan your journey.
A COMPETENCY FRAMEWORK FOR GOVERNANCE GOVERNORS’ BRIEFING LANGLEY HALL PRIMARY ACADEMY 14 JULY 2017 Clive Haines & Rebecca Walker.
Jake Atkinson Chief Officer, LRALC
Safety & Health Programs
Programme 1: Responsibilities
About the national data opt-out
The role of the CSP Safety Rep
CEng progression through the IOM3
Health and Safety Refresher Training
Frank Power Ergonomist (Inspector) Health and Safety Authority
Presentation transcript:

Standard 019 PDSW “One+ Year On” Wessex Route version of National Briefing

That person will have been involved in the planning of the work. PDSW Vision There will be a person in charge accountable for managing site, task and operational safety risk. That person will have been involved in the planning of the work. The PIC will be involved in the planning and delivery of the work being undertaken. It is understood this may not be face to face; telephone and or email communication is acceptable.

Introduction Embedment Issues: National feedback has shown that the key themes for non-compliance towards to the standard include; Lack of understanding of the new process Lack of understanding of the PIC role and responsibility Operational challenges making it difficult to always involve the PIC in planning Planner capability and capacity

Key Roles Person In Charge (PIC) Person In Charge (PIC) Collaborates with the Planner to produce a SWP (NOTE: for cyclical SWPs this need only be the original PIC, for some locations a Super-PIC can do this for Blocking duties on behalf of others, depending on TSMs following the agreed Wessex process.) Co-ordinates and delivers the briefings on site Accountable for the site, task and operational risks Manages and co-ordinate activities on site Responsible for escalating issues (over runs, accidents, incidents) The COSS still ensures the operational risks controlled, and the line is clear and safe for the passage of trains

Key Roles Planner Planner Creates & facilitates the production of the Safe Work Pack, in collaboration with all PICs, as directed by the Responsible Manager

Key Roles Responsible Manager Responsible Manager Delegates the work activity to the appropriate Planner(s) and PIC(s) Authorises the Safe Work Pack is fit for purpose Accountable for the safe planning and delivery of the works

Variations from planned work If the PIC determines that the SWP is inadequate or cannot be implemented as planned (due to weather conditions, failure of equipment, resourcing issues etc) the PIC may vary the task. To do this, they must consider: The planned protection or warning arrangements New task and site risk controls Be competent in the task or seek advice / guidance from competent persons e.g. COSS or task specific competence. Have staff with the correct task competencies, equipment and PPE The PIC can do this without an authority number if they use the existing or a higher planned level of operational hierarchy and mileages identified in the SWP and the task risk has not increased. The PIC must be able to brief the work team on the new task and controls. .

One site of work, one SWP, one PIC. Long Worksites The direction: For any work that takes place at two or more locations (either common goal working or where there are discrete pockets of work e.g. installation of an earth strap, placing of protection)) there needs to be a PIC at each location Each physically separated site of work within a long worksite must have a PIC One site of work, one SWP, one PIC. All PICs must be involved in the production of the SWP and the consideration of all task, site and operational risk A COSS cannot carry out work without acting as a PIC PIC PIC SITE OF WORK

Practicalities of the process Option 1 – multiple packs created through SSoWP To comply to the standard completely, each individual site of work within the Engineering Supervisors Worksite, requires a pack to be created involving the PIC in the planning. For Long worksites this would require all PICs involved in the work having individual packs and to have been involved in the planning of it.

Practicalities of the process Option 2 – single pack created through SSoWP Alternatively; Planners may create a single SWP for a common goal, covering all tasks at the sites of work and including all site and task risks associated with the activities to be undertaken.

Practicalities of the process Option 3 – multiple copies distributed through eSWPs The eSWP solution simplifies this process. Provided all PICs have been involved with the planning of the activities it’s a simple matter of including them when sending out the emailed packs Verification and authorisation processes still apply.

…what have the 019 changes meant for you? A year+ on… …what have the 019 changes meant for you? A year on, what do we still need to do? Remind our people of the key changes and the purpose of the core roles: RM, Planner and PIC Continue to drive 019 compliance Help our people to understand “what’s in it for them” and the overall safety benefit from the Programme Review of end to end planning process which was put in place for 019 implementation Challenge the method of working during planning to drive Protection rather than Warning as the preferred method