Plan for completion of Task 2

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
Resource 2 Manufacturing Techniques Machining Operations & Techniques.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Old Main. Finalized Process Plans  Front Face Process Plan.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
IPod analyses Paul, Ethan, Niels. Casing: Plastic cover Dual injection molding ▫White cover ▫Transparant layer on top of this Advantages ▫Lower part cost.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
A 128 fiber Slit-Plate assembly, Kinematic mount
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
LARP Collaboration Meeting Racetrack Coil Fabrication
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Kitakami Side AHCAL Assembly or anywhere in any detector.
First Wall Panel - Overview
Guide Right™ Edentulous Maxillary Arch
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
Update on PANDA solenoid design
Procurement Status Miao Yu 11/19/2013.
Installation Global System
P. S. Friedman Integrated Sensors, LLC
Coil Design and Fabrication
Service channels between Tracker and PP1
Service channels between Tracker and PP1
LARP Phase II Secondary Collimator RC1
From Design to Installation courtesy R. Folch S. Atieh TS / MME
the MDP High Field Dipole Demonstrator
Perforator process.
MQXF updates P. Ferracin October 9th, 2014.
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
CABLE READY SAMPLE KIT *PLYMOUTH*
Undulator System Components Status Dean Walters
as a prototype for Super c-tau factory
SNS PPU Cryomodule Thermal Shield
Status of SF Model Dipole Contract with TAMU
SC1R Cold Box PDR Assembly Sequence
Model Dipole Fabrication & Testing 2016 Plan, Schedule, Budget
Presentation transcript:

Plan for completion of Task 2  

Major activities to date Structural elements for winding Develop detailed fabrication print sets for all G-11 components. ✓ Contract fabrication of one body segment, QC fabricated part to qualify vendor. ✓ Contract for fabrication of all G-11 components, in 3 priority groups: Structural elements to be impregnated with beam tube and wind layer 1 ✓ Structural elements needed to complete layer 2  Structural elements needed to complete layer 3  Fabricate SS beam tube and flanking SS structural bars. ✓ Assemble priority 1 parts on beam tube and vacuum impregnate structural beam. ✓ Motorized bending tools Develop piece-part prints for bending tools: Main bender for 180° U-bends ✓ Compound bender for 90° flare bends with steps for transitions ✓ Special benders for dog-bone ends and for close bends  Fabricate main bender and compound bender, integrate with motor/gearbox assys✓ Develop control programs for the required bends.  CuNi tube for dummy cable, draw to final cable diameter ✓ Form sample cables, form 180° U-bends, extract strands, test Ic. ✓ Develop 3D FEA model of the dipole, evaluate support for ends. 

Remaining tasks We plan to complete Task 2 effort by 12/31/2015. Program Motorized Benders for all winding steps Complete special Motorized Benders for dog-bone ends, close ends. Attach end structures for layer 1. Wind layer 1. QC body and end locations of all turns. Drill holes for layer clips for layers 2,3. Attach end structures and body caps for layer 2. Wind layer 2. Attach end structures, body caps, clips for layer 3. Wind layer 3. Install cover caps and clips. Mockup winding is now complete. Compress winding package and clamp between plates. Final QC of turns. Complete FEA model including stress/strain in end region. Prepare report of Task 2 effort. We plan to complete Task 2 effort by 12/31/2015. We will have exhausted all contract $ by that date.

Impregnated assembly ready for layer 1

Layer 1 complete

Caps/forms in place – ready to wind layer 2

Layer 2 complete

Caps/forms in place – ready to wind layer 3

Layer 3 complete

Final caps in place – preload and QC Apply flat plates to top/bottom surfaces, clamp sides and top/bottom, dilatometry of x/y cable positions through open slots in G-11 structure.