ELCITA UPDATE July 2019.

Slides:



Advertisements
Similar presentations
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Advertisements

Introduction Transition of Management Initial Challenges Revival and Restoration Production for 2013 Year 2014 Major Works Production Mobile plant Projections.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Expect More !. Woodland Heights Rajapura (Jigani - Bommasandara Road), Bangalore.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
21 st Sep Election Process July & August
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
October E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets. Under Ground Drainage System Completed & Tender Published.
February Skywalk Contract Awarded to M/s mayaPRAXIS to provide Architectural & Structural feasibility report of Skywalk system for Electronics.
November E – Toilets 8 e-toilets operational and 4 more e- toilets work in progress. Under Ground Drainage System Completed & Tender Published.
Building Permit Contractor Round Table 8731 Citizens Drive New Port Richey, Florida Wednesday – July 10, :00 pm to 4:00 pm.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
SINGLE WINDOW LOGISTICS SOLUTION Presentation From : NRV LOGISTICS PVT. LTD. ` SINGLE WINDOW SOLUTION.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
June Skywalk M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Moloto Road (R573) Safety Investigations
Implementation of Smart Cities mission DAVANAGERE SMART CITY LIMITED
Butibori CETP Pvt. Ltd. Environmental Activities & Technological Initiatives Plot No. P-13 Near Indorama Gate No-1, MIDC Industrial Area, Butibori, Nagpur.
SHRM Poll: Green Jobs—Are They Here Yet?
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE April 2017.
ELCITA UPDATE February 2017.
ELCITA UPDATE March 2017.
Review of Implementation of Smart Cities Mission
ELCITA UPDATE JULY 2017.
ELCITA Update December 2015.
City of Whitehorse 2017 Capital Projects & Service Requirements Peter O’Blenes, P. Eng February 21,2017.
Town of Brighton, Department of Public Works
ELCITA UPDATE January 2017.
Urban Administration for Revenue Officers
ELCITA UPDATE AUGUST 2017.
ELCITA UPDATE November 2016.
ELCITA Update May 2016.
ELCITA Update April 2016.
Highveld Industrial Park Workshop No. 1 Information Memorandum
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Highveld Industrial Park Workshop No. 5 Information Memorandum
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE SEPTEMBER 2017.
ELCITA UPDATE October 2016.
ELCITA UPDATE August 2016.
Maintenance of the On-Lot Sewage System
Udaipur Smart City SUMMARY OF PROGRESS
ELCITA UPDATE November 2017.
Electronics City Industrial Township Authority
Product of.
Electrical Gas Plumbing Heating & Cooling
Atal Mission for Rejuvenation and Urban Transformation (AMRUT)
Online interactive Risk Assessment July 2018 – Update
ELCITA Update March 2016.
SAVE WATER + SAVE TREES SAVE LIFE
ELCITA UPDATE March 2018.
ELCITA UPDATE April 2018.
ELCITA UPDATE July 2016.
ELCITA UPDATE December 2016.
ELCITA Update January 2016.
ELCITA UPDATE September 2016.
Online interactive Risk Assessment March 2019 – OiRA update
Harbour Island Force Main Replacement
Online interactive Risk Assessment May 2019 – OiRA update
Michigan Energy Summit | April 25, 2019
ELCITA UPDATE June 2019.
ELCITA UPDATE August 2019.
ELCITA UPDATE April
Presentation transcript:

ELCITA UPDATE July 2019

FOB – 3 ELEVATORS OPENED TO PUBLIC ON 04-07-19

RCC DRAIN & FOOTPATH West Avenue 10 (Towards Fire station) West Lane 1 (Titan Opp Side)

3M RELINQUISHED LAND FOR JUNCTION WIDENING COMPLETED WITH ASPHALTING

Implementation of 11 Traffic signals Shantipura junction Y junction Yokogawa junction Oterra junction Petrol pump junction Wipro junction Canara bank junction Velankani junction Print point junction Newtown junction

Implementation of Dynamic traffic control system - 6 Junctions Oterra Signal junction

4 Shuttle Bus – User’s data April - 5998 May - 9155 June - 16231

Sewage Treatment Plant Sl. NO. Month Total Raw Water Total Treated Water Efficiency 1 June 5264 5093 96.75% 2 May 5756 5617 97.5% 3 April 5859 5686 97.04% Sl. No. STP with Quantity Description of Work Status of work 1 2. 3. 4. CSTP -300 KLD E-SBR 7KLD SEPTAGE MANAGEMENT SBT 8 KLD Purchased Consumables and oil for maintenance Sewage submersible pump service Flow meter – Repair & service Filter Feed Pump service Project completed with Final report submission Panel revamping work Removed unwanted grass and declogging of pipeline throughout SBT Bed Work completed

Sl. No. STP with Quantity Description of Work Status of work 4. ABR SBT - 9 KLD DEWATS Reconstructed the Grease trap chamber 1 & 2 at 9 KLD ABR STP Removal of scum over all 4 ABR chamber Jet aerator and Pump re-connection and service Work completed Work completed 3 E-Toilets Joint inspection has done with Eram scientific & Mom prepared regarding the inspection Requesting for strickering quotation for 7 Units Re-welded floor of E-toilet at ELCIA complex Work under progress Work Completed Kam –avida vehicles Replacement of Temporary gasket to the old kam-avida vehicle (KA51 6287) Replacement of Temporary gasket to the NEW kam-avida vehicle and Minor repair has been done by Prerana Motors (KA51 0225) 5 KSSIDC Mechanical Oil skimmer – Repair and service work

Scum Removal work at ABR STP -9 KLD Floor re-welded work at E-toilets Servicing work of Flow meter at 300 KLD CSTP

Replacement of gasket – KA51 6287 Repair & service – oil skimmer at KSSIDC Replacement of gasket – KA51 0225

PROPOSED LAND TO BE ACQUIRED FOR JN IMPROVEMENT (survey done by TTIC (2007)) YOKOGAWA JUNCTION IFIM – 120 SQM INFOSYS MLCP – 100 SQM VELANKANI JUNCTION VELANKANI – 64 SQM KPTCL – 45 SQM BHEL JUNCTION BHEL (Erkadi Side) – 238 SQM BHEL (Equinox Side) – 236 SQM 3M (Erkadi Side) – 252 SQM OPTO CIRCUIT– 12 SQM ERKADI JUNCTION ERKADI SYSTEMS– 20 SQM SIEMENS JUNCTION EDGE VERVE – 90 SQM PETROL BUNK JUNCTION PETROL BUNK – 37 SQM C DOT – 25 SQM RS JUNCTION RS ELECTRONICS – 71 SQM CELSTREAM – 68 SQM ITI – 90 SQM INTERPLEX – 74 SQM OTTERA JUNCTION TIMKEN – 78 SQM ELCITA FOOTPATH – 91 SQM

TENDERS ANVIL INFRASTRUCTURE WORKS RCC Drain & Footpath (West Avenue 2) Velankani Drive – 175 Lakhs RCC Drain & Footpath (West Avenue 4) IFIM Side – 39 Lakhs RCC Drain & Footpath West Avenue 3 (KPTCL Junction to Yokogawa Junction both sides) – 168 Lakhs RCC Drain & Footpath (West Avenue 9) INTERPLEX SIDE – 75 Lakhs Asphalting - West Avenue -10 (Coffee day Jn to Fire Station Jn) – 27.5 Lakhs Concrete Road - Fire Station Inside roads – 15 Lakhs MS Railing (West Avenue 9) Both Side – 72 lakhs MS Railing (West Avenue 6) Both Side – 62 Lakhs Providing and laying asphalt along East Avenue 3 – 43 Lakhs Construction of Median along East Avenue 3 – 35 Lakhs

TENDERS ANVIL ELECTRICAL WORKS The 7 –Way RMU shifting in West Avenue-3 ( Near Timken) – 20Lakhs Over Head line converting to UG cable in West Avenue-10 ( Canara Bank to Fire station) – 70 Lakhs New Compact RMU to be installed in West Lane-10 ( Near Bank of India) - 31 Lakhs

TENDERS ANVIL SUTAINABILITY WORKS DG set for SWM facility– 6 Lakhs Baling machine for SWM facility – 5 Lakhs SWM vehicle for collecting food waste (TATA 407) - 10Lakhs Blower repair and Diffusers - 2 Lakhs DO Sensor – 50 Lakhs Online monitoring system – 50 Lakhs

Commencement Certificate Occupancy Certificate TOWN PLANNING KHATHA CERTIFICATES, BUILDING LICENSE , COMMENCEMENT CERTIFICATES AND OCCUPANCY CERTIFICATES ISSUED SINCE 2013 - 2014 ONWARDS Details FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18  FY 2018-19 (As on 30.03.2019 FY 2019-20 (As on 05.07.2019 ) Khatha  6 18 12 11  28 5  Building License 2 13 25 35 32 40 14 Commencement Certificate 1 4 7 17 9 3 Occupancy Certificate Nil 24

Inspection on Waste and Water Management at Industries for Issue of Trade License. Velankani Information Systems Ltd – Oterra Hotel Velankani Information Systems Ltd – 46 Ounce Juice Maker Daily Dose - M.R.Shanthakumar Building Kumaon Entertainment & Hospitalities Pvt Ltd., Yum Restaurant - KFC Celsa Hotels Pvt Ltd - Lemon Tree Zone by the Park - Shreetronics building

ELCITA SWM presentation at NGT meeting Visit of 20 health inspectors from State Institute of Urban Development (SIUD), ATI Campus Visit from DMA office.

Clean Air for ELCITA. – Received the report

Broken Syntex drums used for reject waste at SWM plant Cigarette bin installed in front of Gill instruments

Statistics : Description No of companies Qty of waste No of people ELCITA SWM 110 9.4 Tons 36 Nursery No of saplings distributed Saplings acquired last month Saplings at the nursery ELCITA Nursery 3828 1350 3360

WATER MANAGEMENT Proposal of increase the rate of BWSSB water Change of water billing cycle of ELCITA Current billing cycle Recommended billing cycle 1st to last date of the month From 5th of every month to 4th of next month Note: This change is to align to the BWSSB billing cycle

Security and Traffic Related Joint mock drill by CISF Ecity, CISF Infosys and Garuda Force conducted on 29 June 2019 in Infosys M&P Campus Installation of 16 Signals completed, 6 Signals operating on Dynamic Mode using Google Maps. 3 Nos passenger lifts functional at Skywalk across Hosur Road since 04 July 2019 FAE public shared Elecric two wheelers inducted in ECity. 2 Nos Hero Splendor for Traffic Patrol have been delivered

Security and Traffic Related Yulu Statistics June 2019 Yulu Miracle Usage No of Trips Total Users Distance Covered Carbon Reduced (gms) 18066 6952 198643.46 19864342

THANK YOU