Università di Catania and INFN – Sezione di Catania

Slides:



Advertisements
Similar presentations
CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
Advertisements

03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Strasbourg status Ring 7 pilot run François Didierjean.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
About PMTs first series cold and warm tests G. Raselli (INFN and Universita di Pavia) F. Tortorici (INFN and Universita di Catania) M. Rossella (INFN and.
Catania Production Center S.Albergo Universita’ & INFN Catania.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
M. Manghisoni, L. Ratti Università degli Studi di Pavia INFN Pavia
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
APV Lectures APV FE Basic Building Blocks How Our Testing Works
On behalf of the US TOB testing group
Hybrid & Module Testing Status
Update of US Testing Status
UCSB Testing Status Anthony Affolder
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Results from module testing
Unexpected Failures of Modules on Rods
2012 סיכום מפגש 2 שלב המשכי תהליך חזוני-אסטרטגי של המועצה העליונה של הפיזיותרפיה בישראל.
Recent TOB Developments
Module Failures on RODs
FNAL Module Testing Status
Module Production Status in Florence
On behalf of the US TOB testing group
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
The measurement set-up
Bari production centre resp. M. de Palma
Damage under UCSB bias bonds
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Passitivation Location
L.Fiore Gantry Meeting during the CMS TK week
Metal overhang: an important ingredient against “micro-discharge”
Module Testing in Florence Carlo Civinini INFN-Florence
Production Status 39 modules produced
Is Increased Bias Current and CMN Correlated?
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

Università di Catania and INFN – Sezione di Catania Bonding in CATANIA Salvatore Costa Università di Catania and INFN – Sezione di Catania

Catania: bond accounting Module Type IB34 IB12phi Total Received from Gantry 74 40 114 Bonded 38 112 ARC tested OK 68 36 104 bad 6 2 8

Catania: (bond) faults 2 Modules (30200020035289, …303) fail ARC Fast Tests Low Voltage test: I(V2.50)=804 mA (max 750 mA) Still not understood, but others have appeared elsewhere and also slightly higher currents found also on 4-APV modules In one recent group of 18 modules: 6 anomalous IV curves (detected after bias bond – before readout bonding). Also seen elsewhere.