API RP 59 Well Control Operations Chair – Tom Proehl

Slides:



Advertisements
Similar presentations
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Advertisements

API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
API 16 AR Specification for Drill-through Equipment Remanufacturing
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
11 Ed Baniak Senior Standards Associate Washington, DC January 28, 2010 API Report API-AGA Joint Committee 2010 API ECS Winter Conference New Orleans,
1 API 16 AR Specification for Drill- through Equipment Remanufacturing Summer Standards Meeting Communication Jan van Wijk / Chris Johnson API-16AR chairman.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
1220 L Street, NW Washington, DC API Standards Development and Pipeline Safety Regulations Restoring Trust in Pipeline Safety Conference.
Federal Aviation Administration Federal Aviation Administration COMSTAC RLV Working Group May 20, 2009.
Yong-Yi Wang, Chair API 1104 Committee Meeting Washington, DC June 30, 2010 Report of Fracture Mechanics Subcommittee.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
2013 Voting Statistics 2014 Election Information Red Knights International Firefighter Motorcycle Club Thomas L Caisse Chair – Nominations Committee 24.
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Relevant Rules on Recirculation
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
API 17X Subsea Boosting January 13, 2015
TG Chair: Mark Brinsden Shell
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Moving Companies in VA Moving Companies in Washington DC.
API FALL MEETING November , 2014 Denver, Colorado
SAB Secretary Report Standards Activities Board Debbie Brown
API 16C Choke and Kill Equipment
API 16F June 2017 Specification for Marine Drilling Riser Equipment
Status Update on API 16Q / 16R / 16F
API 16A June 2017 Specification for Drill-through Equipment
Optimization of O3 NAAQS Compliance Networks
2016 Exploration & Production Standards Conference Subcommittee 10
Operating Rules Update
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
Specification on float equipment
First 8 slides are what was presented in San Fransisco…
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman –
API Summer Standardization Conference
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
API 16AR Specification for Drill-through Equipment Remanufacturing
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API RP 59 June 2017 Recommended Practice for Well Control Operations
API Standard 53 Update June 2017
API 16 AR Specification for Drill-through Equipment Remanufacturing
API 16 AR Specification for Drill-through Equipment Remanufacturing
IEEE TGaf DRAFT Meeting Plan and Agenda
Solutions Summit Series
Number of Representatives
Task Group Status January 2013
API RP 16AS January 2019 Standard for BOP Systems
API 16C Choke and Kill Equipment
API 16A January 24, 2019 Winter Conference – San Antonio
API STANDARD 64 THIRD EDITION, AUGUST 2017 ADDENDUM 1, DECEMBER 2018 ERRATA 1, MARCH 2018 Diverter Equipment Systems.
API 16RCD January 2019 Specification for Rotating Control Devices
API Specification 16D Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API RP 59 Well Control Operations Chair – Tom Proehl Vice chair – Earl Dietrich Secretary – N/A Contact Information – Tom Proehl (713) 231-8547

Current Version RP 59 Second Edition, May, 2006 RP 59 Reaffirmed, January, 2012 Balloted in 2018 for Reaffirmation 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

RP 59 Ballot Results Ballot ID 4671 closed on December 20, 2018 Ballot passed 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

Path Forward Seeking new chairman for RP59 Task group Plan to revise relevant sections in the next few years, prior to next revision period (5 years) 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org