IEEE 802 IMT-Advanced Technology Proposal Process

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project.
Advertisements

Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
Doc.: _SEC_Motions_Mar08 Submission March 2008 Michael Lynch, Nortel Networksh Motion to SEC Motion by: LynchSeconded by: Heile.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates IEEE IMT Advanced Update IEEE 802 has continued active.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Submission doc.: IEEE 11-10/1021r3 September 2010 George Bumiller, Research In MotionSlide 1 Notes for Liaison to IEEE Emergency Services Date:
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1181 Date Submitted: Source:
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
[RR-TAG Liaison Report to ]
RR-TAG (802.18) to Liaison Report
ITU-R Ad-Hoc Contact person
RR-TAG (802.18) Liaison Report
IMT-2020 Contribution Content
doc.: IEEE <doc#>
[RR-TAG Liaison Report to ]
IEEE Liaison Report to IEEE
IMT-Advanced Opening Report
doc.: IEEE <doc#>
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6
ITU-R Liaison Group Report - Session #62 Opening Plenary
RR-TAG (802.18) to Liaison Report
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Liaison Report Date: Author: Jan 2008 Month Year
IEEE 802 IMT-Advanced Technology Proposal Process
TGz Beijing May 2010 Closing Report
IMT-Advanced Closing Report
IEEE Motions in July Plenary DCN:
Liaison Report from Date: September 20, 2012 September 2012
RR-TAG Liaison Report July 2008 IEEE
Possible liaison motion for IEEE as an IMT-2020 technology
IEEE ah Timeline Projection
IEEE (RR-TAG) Liaison Report
IEEE IMT-Advanced Review Process
IEEE 802 Process for Interactions with ISO/IEC JTC 1/SC 6 & 7
doc.: IEEE <doc#>
Month Year IEEE Motions in July Plenary DCN:
RTA TIG Closing Report Date: Authors: March 2019
802.11bd Timeline Date: Authors: January 2019
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
RR-TAG Liaison Report November 2008 IEEE
Comments on IMT-Advanced Review Process
IEEE 802 IMT-Advanced Technology Proposal Process
60 GHz Spectrum Allocations
IEEE IMT-Advanced Review Process
AANI SC Agenda 8 January 2018 Teleconference
IMT-Advanced Opening Report
RR-TAG Closing Report Report of September 2008 plenary meeting
Submission Title: [Proposed project timeline]
Month Year doc.: IEEE yy/xxxxr0 May 2019
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
18 March Agenda Opening comments and attendance
Activities of ARIB on IMT Standards
Submission Title: [Proposed project timeline]
AANI SC Agenda 8 January 2018 Teleconference
TGp Motions for Tuesday
AANI SC Agenda 27 November 2017 Teleconference
TTA activities on IMT-Advanced Standardization
RR-TAG Liaison Report July 2008 IEEE
Month Year doc.: IEEE yy/xxxxr0 May 2019
Presentation transcript:

IEEE 802 IMT-Advanced Technology Proposal Process Month Year doc.: IEEE 802.11-yy/xxxxr0 March 2008 IEEE 802 IMT-Advanced Technology Proposal Process Date: 2008-03-19 Authors: John Notor, Cadence Design Systems, Inc. John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 March 2008 Approval Process A Working Group (WG), or WG combinations, submits a draft Radio Interface Technology (RIT) proposal, or a draft proposal for a Set of RITs (SRIT) to 802.18 for review: Proposal requirements: draft must be complete, including self- evaluations, per ITU-R WP5D submission requirements. The WG must approve the draft prior to submission to 802.18. 802.18 reviews proposals for completeness and accuracy relative to WP5D requirements for submission: If 802.18 finds the proposal is not in compliance with WP5D requirements, 802.18 returns the proposal to the WG with a list of discrepancies and, where possible, suggestions for corrections. If 802.18 finds the proposal in compliance with WP5D requirements, 802.18 approves the proposal, forwarding the proposal to the EC for review/approval. After EC approval, the IEEE SA ITU-R liaison will submit the proposal to WP5D, with appropriate cover letter. John Notor, Cadence Design Systems, Inc. John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 March 2008 Critical Milestones Last date for WG’s to submit technology proposals (final WG approved drafts) to 802.18 for review: June 12, 2009. Last date for 802.18 approval of proposals for submission to the EC: July 16, 2009. Last date for EC approval of technology proposals: July 17, 2009. Last date WP5D will accept technology proposals: October 2009 (exact date is TBD). Slide 3 John Notor, Cadence Design Systems, Inc. Page 3 John Doe, Some Company