ELCITA UPDATE April -2019
Foot Over Bridge
RCC Drain & Footpath – Work in progress West Avenue 10 (Genpact Side) West Lane 1 (Titan Opp Side)
RCC DRAIN & FOOTPATH - COMPLETED West Avenue 9 (ITI Side) West Avenue 7 (Wipro G5 to 16)
3M RELINQUISHED LAND FOR JUNCTION WIDENING
11- TRAFFIC SIGNALS – Operational Canara Bank Jn Print Point Jn Ottera Jn Yokogawa Jn Y-Jn 3M Jn Wipro Jn Velankani Jn Y Jn
KERBSTONE PAINTING
NEW DOUBLE ARM STREET LIGHT POLES INSTALLED ON WEST AVENUE-3 and 5.
NEW 5WAY RMU INSTALLATION WORK COMPLETED ON WJ10 (YOKOGOWA JUNCTION)
ELCITA Waste Management Companies added - March Companies in pipeline - April Hexion Symbiosis Radha Reagent Tech Mahindra Syscon Siemens Juice maker Elixiar V.com NTTF ELCITA Nursery Flooring work in progress Shade net setup
Clean Air for ELCITA – Demo installation of Pure Skies device at ELCITA office. ELCITA support for eco friendly Marathons IFIM - Kanyathon run IIIT-B - RunBhoomi -Run for Lake
Sewage Treatment Plant Sl. NO. Month Total Raw Water Total Treated Water Efficiency 1 January 5099 4717 92.5% 2 February 4552 4287 94.2% 3 March 4804 4620 96.2% Sl. No. STP with Quantity Description of Work Status of work 1 CSTP -300 KLD Filter Feed Pump Repair & Service work Work completed Evaluation of Air pollution parameters in & around CSTP Work Under progress 2 E-SBR 7KLD Treated Water parameter analysis and Evaluated the Lab Report 3 SEEPAGE MANAGEMENT Development and solution of Seepage management within E-city Final Report Submission Work Under Progress 4 Canara Bank Road Drainage construction Cleaned all the existing chambers and Screen has installed at all the point source discharge at East Avenue 10
Redesign and Drawing proposal has submitted by M/s. CDD Work completed Sl. No. STP with Quantity Description of Work Status of work 4. ABR SBT - 9 KLD DEWATS Redesign and Drawing proposal has submitted by M/s. CDD Work completed KSSIDC Re-jointing work has done for existing Sewer line situated from KSSIDC Block to 300 KLD CSTP 3 E-Toilets Desludging & Electrical Panel board Revamping settings for E-toilets at Police station, Velankanni Road Joint inspection has done with Eram scientific & Mom prepared for the inspection Work Completed SBT STP- 8KLD Treated water collected and Water quality parameter testing analysis Cleaning and trimming out the unwanted giant plant at Soil Bio filter bed 5 KIADB Working on Design and Drawing for 500 KLD STP MEP AND RSQ Analysis
Repair & Service of Filter Feed Pump Air fume monitor sensor at Equalization Tank Re-jointing has done at Near Fortune Scion Screening adopted at Drain chambers
Security and Traffic Related Road repair work on Neeladri Road commenced from 05 Feb 2019 still in progress. Asphalt commenced on 19 Mar 2019 CISF carried out mock hostage crisis drill in Cyber Park on 07 Mar 2019. CSO attended the State Security meeting chaired by Chief secretary on 06 March 2019 Security Update meeting for all Security heads conducted on 11 Mar 2019. Two Nos Scorpio Getaway vehicles procured for QRT Duties. Two Nos Bharat Benz buses procured for enhancing shuttle services. CISF Soldier’s family accommodation shifted to new building CISF conducted Quarterly Range classification. Comsur CCTV Audit software evaluation in progress. Assistant Manager, Transport, Traffic and Security on-boarded. Work commenced for installation of 8 Nos Additional traffic signal lights in West phase and 3 Nos in East Phase.
Commencement Certificate Occupancy Certificate TOWN PLANNING KHATHA CERTIFICATES, BUILDING LICENCES , COMMENCEMENT CERTIFICATES AND OCCUPANCY CERTIFICATES ISSUED SINCE 2013 - 2014 ONWARDS Details FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19 (As on 31.03.2019 Khatha 6 18 12 11 17 Building License 2 13 25 35 32 40 Commencement Certificate 1 4 7 9 Occupancy Certificate Nil 14 24
TENDERS – UNDER EVALUATION Infrastructure works Road Lane marking and Studs Electrical works Smart Lighting
WATER MANAGEMENT Proposal of increase the rate of BWSSB water Change of water billing cycle of ELCITA”. Current billing cycle Recommended billing cycle 1st to last date of the month From 5th of every month to 4th of next month Note: This change is to align to the BWSSB billing cycle