Development of Reference Geometry DB of ATLAS Detector Reproduction of Inner Detector Kobakhidze Shota 25/04/2019.

Slides:



Advertisements
Similar presentations
FDR 10/01 Jason Tarrant CLRC1 SCT EC Thermal Enclosure (TE) l Thermal Enclosure Function: »Make End-cap thermally neutral »Condensation free exterior »Containment.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Disassemble, Assemble and Perform a Function Check on the M203
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
Numbers
Quadrupole magnets Magnet concept details have not been developed, however we plan to piggy back on the designs developed by Joel Schults ( IRE Magnet.
February Marta Garcia Carnero (CAD Support) 1.General 2.CATIA field 3. SmarTeam field February
ALCPG09 Albuquerque, The new geometry of the ILD muon system in MOKKA N. D’Ascenzo, V. Saveliev, Obninsk State University / DESY U. Schneekloth.
Development of Reference Geometry in CATIA Besik Kekelia Georgian Technical University SCSWT’2012 South Caucasus Software / Computing Workshop & Tutorial.
Adding New Volumes to G4 geometry Baseline Alexander Sharmazanashvili, GCCEC.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
HEP GROUP MEETING work on the ATLAS UPGRADE T.J.Fraser.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Barrel SCT Material Budget By Alessandro Tricoli RAL ATLAS Physics meeting, 18 th March 2008.
ATLAS Pixel Detector JULY 2001 Pixel Support Tube N. Hartman LBNL 1 Pixel Support Tube Concept and Design N. Hartman, E. Anderssen, G. Gilchriese, S. Dardin.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
ATLAS Tracker Upgrade - Services at Barrel Ends: Scenario where services are routed through existing services channels on cryostat shown on the next 3.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
A. Behrens BE-ABP-SU-EM 1 Forum on Tracking Detector Mechanics 04 July 2012 Survey and Large Scale Metrology of Tracking Detectors for LHC Experiments.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
6 th September 20061S. Eicher, M. Battistin Upgrade Thermal Management Workshop September 6 th 2006 Bdg 40 Sara Eicher, Michele Battistin CFD Calculations.
ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
MECAmaster For CATIA V5 Luca Gentini (EN/MME)
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
PANDA, GSI, Electrically Cooled Ge-Detectors development Status Report I. Kojouharov.
Straw man layout for ATLAS ID for SLHC
ATLAS Pixel Detector Pixel Support tube Supports October 17, 2001 E Anderssen, LBNL.
Tracking detectors/2 F.Riggi.
LBNF CAD models, Drawings and Component list
Development of Simplified Geometry Descriptions of ATLAS Detector for ATLAS Tracer Kobakhidze Shota.
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
End-cap Mechanics FDR Overview of the Project
Geometry Description for Cavern Background
PANDA Yoke of the Magnet
? ENDCAP: Mechanics IFIC-Valencia.
ATLAS MDT HV – LV Detector Control System (DCS)
EDMS, CDD, Catia, smarteam.
IR Detector - Test cryostat For IPNL - Shrinkage measurement at 120 K
Variation of components Variation of different trees
Injection direction This area is OK , because the pin into the tube have a supporting point in this area . The injection force push the pin to the other.
Yahoo Mail Customer Support Number
Fundamental Neutron Physics BL-13
ATL-IC-ES new version available - approval starts
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
L H C A T L A S International Collaboration on the LHC Project
SLHC Non-Inner Detector Upgrades
Dolphin 5 Introduction Provisional Patent Draft Drawings for “Article of Manufacture” Drawings A to D 3/4/2012 Provisional Patent Draft Drawings D5-A to.
PANDA The conceptual design of the control Dewar
Combine Test Beam 2004 SCT Modules in Space Draft
Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries,
CO2 progress and issues on the control systems
Practice Geometry Practice
For More Details:
FLEXIBLE CHAIN GEOMETRIC MODEL PROCESSING AND STUDY
Presentation transcript:

Development of Reference Geometry DB of ATLAS Detector Reproduction of Inner Detector Kobakhidze Shota 25/04/2019

Inner detector ST0247166_01 SmarTeam model 25/04/2019

Making assembly editable 25/04/2019

Changing structure of CATIA tree 3 assembly 25 part 1 part 25/04/2019

ST0247166_01 Inner Detector Ass. Side C- detailed Status ST0247166_01 Inner Detector Ass. Side C- detailed Part 40% ST models Sub components   ST0276337_01 a.00 Cryostat with services 84 100% 6 Barrel TRT+SCT-C side detailed 77% ST0271105_01 ST0271103_01 a.00 Barrel structure SCT 200 assembly 1 ST0271156_01 a.00 Barrel TRT 25 ST0298736_01 a.00 Thermal barrier SCT 36 ST0299575_01 Barrel fixation 2 ST0256279_02 Barrel services 4 0% ST0295246_01 a.00 Spreader plate C side 27% ST0247227_01 a.00 End Cap TRT + SCT 89 13 5 ST0256277_02 a.00 END-CAP SERVICES ST0026496_01 a AT252274MQ: PPF1 CONICAL PLATES ALL QUADRANT E ST0026496_02 a.00 Symmetry of ST0026496_01_ ST0252491_01 a.00 Pixel sideC with PST and services ST0225641_01 a.00 EP base side C Preliminary ST0225825_01 a.00 outer plates 25/04/2019

Thank you 25/04/2019