Forms & Activities used on

Slides:



Advertisements
Similar presentations
PHD Performance Management Program Matt Gilman Spencer Soderlind Brieshon D’Agostini September 28, 2011 PDCA Training Series 2 PLAN, Part 2.
Advertisements

Chapter 15 Application of Computer Simulation and Modeling.
Tumolo’s Toolbox 7 Step Improvement Process.
Problem Solving Tools INSY 3021 Auburn University Spring 2008.
Chapter 15 Work Flows Focus: This chapter describes the basic tools and techniques for analysis.
 Individually  Given your sample of M&Ms, build a Pareto diagram by color  Before you destroy the evidence, be sure you have an accurate count.
Root Cause Analysis: Why? Why? Why?
Program Management Satisfy requirements of all individual projects with minimal resources Human resource is the most expensive Leadership Methods of documenting.
IE Job Description Steve Snelling Industrial Engineer/Process Engineer
Barry Murash MBBit Nortel 2007
Operations Management Layout Strategy
Failure Mode & Effect Analysis (FMEA)
Paresh Naik December 3, 2004 STC India’s 6 th Annual Conference Using DFSS Tools for Better Technical Writing Processes and Deliverables
Tools To Make Waste Visible. 2 FOR INTERNAL USE ONLY Module Objectives By the end of this module, the participant should be able to:  Develop a Spaghetti.
Client Logo LEAN ENTERPRISE Implementation Workshop.
Overview of Total Quality Tools
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day.
Lean Six Sigma Tools and Techniques for Continuous Improvement Session Five This product was funded by a grant awarded under the President’s High Growth.
Industrial Engineering Roles In Industry
IENG 471 Facilities Planning
Failure Modes Effects Analysis (FMEA). 2 Definition of FMEA Failure Modes Effect Analysis (FMEA) is a structured approach to: Predict failures and prevent.
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
Flow Planner Presentation Selected Case Studies. Internet / Intranet based Process Engineering Flow Planner Features Analyze an unlimited number of flow.
RCM Tools Histogram Pareto Chart Cause and Effect Diagram FMEA.
1 LSSG Green Belt Training Improve: How do we get there?
Six Sigma Training Dr. Robert O. Neidigh Dr. Robert Setaputra.
GCSE ICT Systems Analysis. Systems analysis Systems analysis is the application of analytical processes to the planning, design and implementation of.
/0904 © Business & Legal Reports, Inc. BLR’s Training Presentations Creative Problem-Solving.
Root Cause Analysis Analyze Kaizen Facilitation. Objectives Learn and be able to apply a fishbone diagram Utilize “Why” analysis technique to uncover.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
Failure Modes and Effects Analysis (FMEA)
Quality Improvement Tools for Intervention Determination Presenters: Kris Hartmann, MS Healthcare Analyst, Performance Improvement Projects Don Grostic,
LAYOUT Prepared By : Res.Asst.Hanife Demiralp. BLOCKPLAN In this lab, we are going to generate facility layout by using Block plan and POM-QM soft wares.
1 Team Skill 3 Defining the System Part 1: Use Case Modeling Noureddine Abbadeni Al-Ain University of Science and Technology College of Engineering and.
March 16, 2016 CanadianClinicalDiagnostics.com ©Canadian Clinical Diagnostics.
PROBLEM SOLVING. Definition The act of defining a problem; determining the cause of the problem; identifying, prioritizing and selecting alternatives.
Facility Layout Chapter 10 pages , ,
Accident Investigations
Six Sigma Greenbelt Training
IMPLEMENTING LEAN SIX SIGMA IN THE PALESTINE POULTRY COMPANY
ROOT CAUSE ANALYSIS RCA
Problem Solving Sheet Guidelines
How to Implement an IG Manufacturing Quality Procedure System
Lesson Five: Shopping Smart
Cellular Layouts Cellular Production Group Technology
Work Charting Methods Topics: Pareto Chart – part 1
Failure Modes and Effects Analysis (FMEA)
Failure mode and effect analysis
Systems Design: Activity Based Costing
Practicum: Root Cause Analysis
Problem Solving Tools ILGIN ACAR
PDCA Problem Solving Guide
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
Learning From Customer Defections
Title: Owner: Ver: Date:
Director, Quality and Accreditation
CAUSE ANALYSIS CA
FACILITY LAYOUT Facility layout means:
Root Cause Analysis for Effective Incident Investigation
  Aptiv Global Supplier Quality Early Production Containment Training.
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Root Cause Analysis: Why? Why? Why?
Facilities Planning and Design Course code:
DMAIC STANDARD WORK TEMPLATE
Summer Training Industrial Engineering Department
DMAIC STANDARD WORK TEMPLATE
Possible Analysis Tools to Insert into your A3
Systems Design: Activity Based Costing
Presentation transcript:

Forms & Activities used on ISE - type Projects Steve Snelling

List of Main Forms/Activities Project Profile & Schedule Tours Observations Time Studies Informational Interviews Plus/Minus chart Process Flow chart Cause/Effect diagram Defect locator (Measles) chart Precedence chart & Critical Path Data Analysis Pareto (80/20) chart 5-Whys diagram Facility layout drawing From/To chart Activity Relationship chart Space Utilization chart 5S Score chart Spaghetti chart (foot path/distance) Value Stream map Ergo Risk analysis chart Benchmarking FMEA (Failure Mode & Effect Analysis) chart Comparison of Alternatives Gap-to-Goal chart Simulation 2

Sample Forms Project Profile Project Schedule 3

Sample Forms Time Study Process Flow Chart Cause & Effect (Fishbone) Diagram Best Kitting Number of Kits Required Volume of Inventory Required Size of Kitting Area Number of Kitters Working Frequency of Replenishment Number of Production Areas Supported Spaghetti (foot path/distance) Chart Effect Causes 4

Facility Layout Drawing Sample Forms Value Stream Map Facility Layout Drawing 5S Score Chart Comparison Chart Simplify Sweep Standardize Sort Self Actualize 5 4 3 2 1 3 2 3 2 5

Activity Relationship Chart Sample Forms Activity Relationship Chart Precedence Diagram (and Critical Path) Shows importance of each department to other departments Digital Picture Pareto (80/20) Chart 6

Space Utilization analysis Sample Forms Gap-to-Goal Chart Space Utilization analysis CURRENT STATE FUTURE STATE GAPS Decrease incidents by 50% Incidents have been occurring Improvement Project is to be started Process: Plan View of Factory Parts Storage Aisle Packing & Shipping Machining Center Heat Treating Shows activity needed to reach a Goal Data Analysis 75% utilization of available floor space (25% free space) Defect Locator ( “measles” ) Chart Defects 7

Sample Forms From/To Chart A B C D E F Ergonomic Data FEMA Departments To Departments A B C D E F 100 ft. 200 ft. 75 ft. 25 ft. 50 ft. 35 ft. FEMA (Failure Mode & Effect Analysis) Severity x Occurrence x Detection = Risk Priority Number (RPN) Highest RPN activity is worked first Severity Occurrence Detection Least Most 10 1 2 3 4 5 6 7 8 9 Shows Travel Distance between departments Ergonomic Data Sev x Occ x Det = RPN 3 x 5 x 5 = 75 8

Sample Forms 5-Whys Diagram Plus/Minus Chart Start a New IE Project? 9 Problem Statement Why? Major Potential Cause Detailed Potential Causes Root Causes Welding failed Weld temp. was low Thermostat not set properly Mechanic not trained Mechanic could not see the temp. setting Old thermostat/ Faulty reading No documenta- tion Training not a requirement Equipment not ordered/ order new equip. Write temp. requirement Make training a requirement Not enough light Provide adequate lighting Start a New IE Project? Driving (Positive) Forces Impeding (Negative) Forces Will save money for company Helps dept. goals Meets IE goals Helps production shop Reduces flow days Improves throughput No help from shop, they are busy Low priority given Difficult to get data No guidance No sponsors of project This example shows the reasons for & against, starting a new IE project. This example looks at Why a welding failed. 9

Informational Interviews Sample Activities Tours / Observations Benchmarking Organize the tour with the process owner Get a guided tour See the surrounding areas on the tour Try to see normal conditions Ask lots of questions during the tour Take notes and debrief following the tour Understand your own area and process first Plan when to do the benchmarking within the project Plan ahead what to Benchmark Get good comparison information & data Take notes and debrief following each benchmarking activity Informational Interviews Simulation Prepare ahead who to talk to and some initial questions to ask Make sure they are experienced with the task being investigated Understand the problem from their perspective Listen for items to follow-up on later Don’t rush their answer to a complex question Take good, organized notes Understand your existing conditions before trying to build the simulation Use standard software that your company uses Build the model as simply as will meet your needs Run all options being considered through the model Document results and list all assumptions used 10