RE3/1 & RE4/1 Parameter Space Services

Slides:



Advertisements
Similar presentations
FGT installation disks … viewed from the back (From West end looking in towards vertex). SSD cables go in the spaces above and below the rails on the left.
Advertisements

1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
M. Bianco On behalf of the ATLAS Collaboration
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
Organising 904 RPC lab Ian 23 April Already done, ISR I3-I4 tunnel is empty. Move out and chamber/gap sorting done in the ISR. Manpower available.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Resistive Plate Chambers for CMS and INO
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Mock-up and integration status
CMS GEM services: Cooling
Integration and Services RE3/1 and RE4/1
STRAW TRACKER SYSTEM CAD STATUS :
Integration and Services RE3/1 and RE4/1
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
YE2 – YE3 distance Manual measurements
Assembly procedure – Inner Region
A. Mikhailichenko, D. Rubin
C.Clerc ILD session, ALCPG /03/2010
Services Layout – Update
EMU Slice Test Run Plan a working document.
for the transition region on behalf of the RPC upgrade group
Chamber Design and Integration RE3/1 and RE4/1
First of all we will remind some numbers:
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
HPL DG d=1.4mm/e= mm.
SIT AND FTD DESIGN FOR ILD
Integration and IR Hall
CSC Electronics Installation and Commissioning CSCE I&C
Coordinate system for the GIF as defined for CMS RPCs
DET. Integration Inner detector envelope Radial clearances.
UXC55 ME Muon Endcap On Detector Layout
RPC SYSTEM LAYOUT and DIMENSIONS
Inner DET. Integration Inner detector envelope Radial clearances.
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

RE3/1 & RE4/1 Parameter Space Services Ian Crotty 12 Feb 2014

CMS Parameter drawing

RE4/1 & RE3/1 Extending to Extra High Eta = 2.4 or 2.5 As planned high Eta up to 2.1. Extending to Extra High Eta = 2.4 or 2.5

Boundries on Extra High Eta Alignment lines RE4/1 RE3/1 ETA=2.1 Neutron Shielding on Vertical faces of yoke Cylindrical Neutron Shielding

Dimensions as per our Parameter Book Geometrical Layout and Mechanical details of CMS End Cap RPCs (Version:November, 2002) B D Ri Ro Station Ri Ro A B C D Thickness Z Position rpc Z of cu-strips RE2/1 1960 3241 1301 1251 799 1281 36 7865-7902 7883 –7920* RE2/2 3299 4986 1693 979 684 1687 RE2/3 5001 6955 1961 1323 981 1954   RE3/1 2435 819 966 806 9775-9738 9757-9720* RE3/2 RE3/3 RE4/1 2655 595 1044 586 10676-10639 10654-10621* RE4/2 RE4/3

The easy solution A flat wall YE4 to mount to However there are no services, Gas, Rack space, Mini Cable Chains etc available on YE4. Taking services there from YE3 would require disconnects or new Mini cable chains. The former is not CMS policy.

Mounting RE4/1 Outer radius mounting posts are hidden behind RE4SM Alignment system has gone giving space ~60mm in Z Inner radius mounts M24 every 20deg Require a technically smart solution to fix the outer radius

Access to Periphery Lead cables and pipes over the top of the RPCs, OR Under them where the space was for the alignment system .

RE3/1

RE3/1 High Eta & Extra High Eta RE3/1 Eta = 2.4 RE3/1 Eta=2.1

Mounting RE3/1 M12 Mounting Holes for 20deg Chambers

Access to Periphery Over the top of the RPCs Under the RE3/2 & RE3/3

Services Gas rack(s) Cooling, capacity of YE3 Manifold Rack (LV , LBC Cables (HV, LV Signal dcs Access to Periphery (Green Structure) Space in Main & Mini Cable Chains

Gas rack space available on Near of YE3 suitable for both RE3/1 & 4/1 ?

Conclusion The mounting of RE4/1 is tricky The rack space for both RE4/1 & RE3/1 on the same yoke (YE3) will be difficult Exact volumes for High ets & Extra High eta to be established with Integration 904 Iteration of chamber design and boundary conditions in P5 This doc and others are visible at; http://project-cms-rpc-endcap.web.cern.ch/project-cms-rpc-endcap/rpc/UpscopeHighEta/Parameters/HighEtaParaSpaceRPCsIanFeb2014.pptx

Supplementary slides RE2/1

RE2/1 and its Cooling

X Section of CSC-RPC interface

Alignment path