Jonathan Young ColumbiaGrid

Slides:



Advertisements
Similar presentations
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
Advertisements

1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Transition Plan for Removing Wind Phase 1 Generic Models
Doug Tucker and Jon Jensen WECC Staff SRWG Workshop July 15-16, 2014 ColumbiaGrid.
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.
Joint Electric Scheduling Subcommittee Update August 20, 2013.
Bank Reconciliation Process
February 23-24, 2005Salt Lake City, Utah1 In-house QC Semi-Automated Duplicate Checking, Large Fire Refinement Complex Fire Identification Phase 2 Fire.
Brian Reich Load Serving Organization Training Leader Idaho Power Company WECC Operating Committee Operations Training Subcommittee October Salt.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
Joint Electric Scheduling Subcommittee Update February 18, 2014.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
Texas Nodal Electrical Buses and Outage Scheduling.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PowerWorld Case Validation
Bert Peters Chair, Path Operator Task Force
Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material
Nick Hatton Associate Staff Engineer
Barrilla Junction Area Transmission Improvements Project
Progress Report for the May 26th 17:31 Event
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Jonathan Young ColumbiaGrid
Multiplication table. x
Philip Augustin TSS Chair
Impact of Waste Recycling on the Composition of MSW
WIND TURBINE GENERATORS.
AUTOMATED SESSION PLANNING. In the present world, everything has become automated. By, a click everything is being processed. But the preparation of the.
Base Case Build Process
Jonathan young ColumbiaGrid
Jonathan Young, SDWG Chair
ADS and WPR Seed Case Background
Planning Coordinator Gap Update March 25, 2014
Andrew Christensen, SDWG Chair
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
System Review Work Group
Doug Tucker and Jon Jensen WECC Staff
Jonathan Young SDWG Chair
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Base Case Build Process
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Andrew Christensen, SRWG Chair
City Council approved $750,000 “transform” design option
SRWG Chair Report March 2015 WECC HQ
Donald Davies Chief Senior Engineer
ADS and WPR Seed Case Background
Tracy Rolstad TSS Chair
Palo Verde-COI RAS Retirement
Jon Jensen Associate Staff Engineer
SRWG Meeting 15-2 Power Plant Validation Tools
Jonathan Young, SDWG Chair
Jonathan Young SDWG Chair
Andrew Christensen, SRWG Chair
Palo Verde-COI RAS Retirement
System Review Work Group Update to TSS
System Review Work Group Update to TSS
Jonathan Young ColumbiaGrid
Generator Operator Work Group (GOWG)
Student Demographics Student State Required Fields.
Bert Peters Chair, Path Operator Task Force
2015 State Convention Focus Tables.
Power World User’s Work Group (PWUWG)
Presentation transcript:

Jonathan Young ColumbiaGrid SRWG’s Compliance Subgroup July 30, 2015 Salt Lake City, UT

Discussion Topics Data Preparation Manual (Approval Item) Data Preparation Manual Emerging Topics Collection of GIC Data Replog Dynamic and PowerFlow Case Check

DPM: Update Removal of all references to standards and NERC defined roles No apostrophes in data strings Pmax value used in Q table Phase shifting transformers modeled as phase shifting transformers RAS CEII and FISMA addition Miscellaneous minor edits

DPM: Possible Future Additions Base Load Flag inconsistancies Multiple shunts on a bus Duplicate bus numbers Other option for turbine type Generators on BES buses Change “Emergency Ratings” to “Contingency Ratings” RAS naming convention

Spread Sheet Reviews Collection of GIC Data Current Replog: 16LW1-OP Dynamic and PowerFlow Case Check

Questions/Comments?