DA Metrics AMEDD Command Management System

Slides:



Advertisements
Similar presentations
Open Range Software Welcome to a presentation of the Open Range Industrial Hygiene Program.
Advertisements

Module 2.4 Workforce Transition Planning and Tool March
Indian Health Service Office of Information Technology RPMS Suicide Reporting Form.
Post Retention receives Soldier’s P3/P4 Profile from PAD office. Checks to ensure profile is valid. If profile is not valid to be processed through MAR2,
Visual Information Services and VIOS Requests Overview.
Randstad –HRS Onboarding February, To edit date & footer title choose View>Header/Footer Change fixed date to presentation date Change footer.
DoD Exposure Assessment Model
Elizabeth L. Pullen, CIH APOSHO 26 & Australasian
Copyright © 2003 Americas’ SAP Users’ Group Industrial Hygiene Measurement Management Project at BASF AG Prof. Herbert Bender, PhD May
Medical Surveillance Exam Completion Report Instructions With Visual Examples October 2014.
DA Metrics AMEDD Command Management System
Procurement Analyst Position Update Procurement Training Forum August 24, 2010.
1 EHS.Artist‘s Initials.8/17/ POLAROID CORPORATION WORKER EXPOSURE MONITORING ASSESSMENT M. Kesselring; Arthur D. Little, Inc. M. Anderson;
Energy Facility Contractors Group Safety Working Group Industrial Hygiene / Industrial Safety Technical Team Dina Siegel, Los Alamos National Laboratory.
Prepare Your Academy for 2013
RECORDKEEPING and HC PROGRAM EVALUATION
Using a Comprehensive Occupational Exposure Database to Integrate Members of the Occupational Health Team and Improve Your Occupational Health Program.
Post Retention receives Soldier’s P3/P4 Profile from PAD office. Checks to ensure profile is valid. If profile is not valid to be processed through MAR2,
0 Create Ergonomic SEG and Assessment. 11 Objectives:  Create shop  Create process  Created SEG and add a process  Complete Ergo evaluation in Master.
November 17, 2008Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
2 MINUTE PEARLS Immunization Module: New and Historical Vaccines
Carnegie Corporation of New York Submitting a Proposal 1 This document will guide you through submitting a proposal to Carnegie Corporation of New York.
1 Inquirer Roles Common Transactions Used In HRMS PA10Display Personnel File PA20Display HR Master Data PA30Maintain HR Master Data PA40Personnel Actions.
The Work Unit Numbering System Office of Research Administration Naval Medical Research Center Forest Glen, MD.
System Analysis and Design Copyright © Genetic Computer School 2007 SAD14-1 CHAPTER OVERVIEW  Overview Of System Maintenance  Tasks Performed During.
Introducing the INS Master Schedule Wayne Baggett.
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Chemical Risk Assessment & Exposure Monitoring Quantitative Risk Assessment Revision December Information provided subject to the 'Conditions for.
Noise Survey and Database Training Cathy Pate Megan Karie (248) Cathy Pate
The following statements are true about Role- based User Menu...
Overview of GM Sound Survey Process Eltaneice Bolden – GM Global IH Manager Dave Dickhaut – UAW Industrial Hygienist, Lansing Delta Township.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Networks Physical Infrastructure Rick Finnegan April 22, 2008.
Submitting a Proposal This document will guide you through submitting a proposal to Carnegie Corporation of New York. Access the form Access Carnegie Corporation.
Example Afloat Medical Surveillance Program Management
[Site Name Here] PSRB Meeting - [Date Here]
Create a Public Holiday Calendar
SUBMITTING A PAYMENT REQUEST FORM
Performance Management Workday Module
GUIDANCE DOCUMENT FOR USING ACTEDS FUNDING IN GOARMYED
Position Control Fiscal Year End
Welcome to the Transportation Time Entry Course
Navy and Marine Corps Public Health Center
Select Requisition.
Portable License Utility
Navy Transactional Reporting (DOEHRS-IH)
HQ IMCOM G9 Program Metrics
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
DA Metrics AMEDD Command Management System
Abby Webster Mentored by Dr. Timothy A. Kluchinsky Jr. Introduction
Not all OHMSE programs are required. Most commands
RECORDS AND INFORMATION
MAX Warranty Tracking Vince Stefanetti, Exact MAX Americas Trainer.
IComplaints Internet Complaints Tracking Army User Training.
Receipt Bank User Input Guide for FESC MSA Administrators
Four Function of the new system
Example Afloat Medical Surveillance Program Management
Soldiers personal and unit information
Conventional & Experimental Facilities Dept.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Sampling results 5 (10%) 74% 10 (20%) 25 (50%) 45 (90%) Sample Size
Company Name Date By Whomever
Navy Transactional Reporting (DOEHRS-IH)
Role and Responsibilities of Safety Officers
Employee notification of industrial hygiene sampling results
Workshop: Equipment June 29, 2006.
Welcome to the Transportation Time Entry Course
Position Control Fiscal Year End
Company Name Date By Whomever
Attendance Data
Presentation transcript:

DA Metrics AMEDD Command Management System Provides feedback on performance of Medical Command operations Analysis helps MEDCOM leadership address non – “green” operational issues https://cms.mods.army.mil/cms/secured/index.aspx Army Installation Status Report AR 210-14 Same end purpose as AMEDD CMS, but includes all operations within an Installation https://isrtrain.hqda.pentagon.mil/isr/isrmainAKO/frameset.htm

FY 2009 Metrics CMS # ISR # Description 900 953-04 907 953-08 901 % BZ ≥ OEL, no controls documented in DOEHRS-IH 907 953-08 % BZ ≥ OEL, no controls identified, but w/ control are recommendations 901 953-05 % dosimetry samples w/ noise TWA ≥ 85 dBA, no controls documented in DOEHRS-IH 908 953-09 % dosimetry samples w/ noise TWA ≥ 85 dBA, no controls identified, but w/ control are recommendations 902 953-06 % sound level samples w/ impulse exposures ≥140 dBP, no controls reported in DOEHRS-IH. 909 953-10 % sound level samples w/ impulse exposures ≥140 dBP, no controls identified, but w/ control are recommendations 903 953-11 % of installation personnel assigned a Shop Priority Code in DOEHRS-IH. 904 953-07 % of DOEHRS-IH Priority 1 shops, One Master Schedule task has been completed in the past 12 months.

CMS 900 / ISR 953-04: BZ Samples ≥ OEL % BZ ≥ OEL, includes: TWA, STEL, or Ceiling Limit; AND no associated controls reported in DOEHRS-IH. 1. Establish Program Office 2. Add Supported Organizations 3. Capture Shops 4. Capture Processes 5. Capture Shop Personnel & assign to relevant processes 6. Capture Hazards 7. Capture Controls related to hazards 8. Establish SEG 9. Enter Air Breathing Zone Samples at SEG level 10. Calculate TWAs

CMS 900 / ISR 953-04: Samples ≥ OEL Steps 1-5: Capture Customers, Shops, Processes within the Shops, Capture Shop Personnel

CMS 900 / ISR 953-04: BZ Samples ≥ OEL Step 5: Relate Shop Personnel to Processes they Perform

CMS 900 / ISR 953-04: Samples BZ ≥ OEL Step 6-7: Capture Controls & Hazards they Control

CMS 900 / ISR 953-04: BZ Samples ≥ OEL Step 8: Establish Similar Exposure Group

CMS 900 / ISR 953-04: BZ Samples ≥ OEL Step 9:-10: TWA’s are Calculated from Sample Results

CMS 907 / ISR 953-08 This metric builds on CMS 900 / ISR 953-04 % BZ ≥ OEL, includes: TWA, STEL, or Ceiling Limit; AND have no associated controls reported in DOEHRS-IH Complete steps 1-10 as CMS 900/ ISR 953-04 11. Enter Control Recommendations at the SEG level Ensure status of recommendation is identified % BZ ≥ OEL, no controls identified, but w/ control are recommendations. This means that the IH has not associated a control with the hazard, but has made a recommendation at the SEG level for a control for the hazard.

CMS 907 / ISR 953-08 Step 11: Control Recommendations at the SEG Level

CMS 901 / ISR 953-05: Noise Dosimetry % noise dosimetry samples TWA ≥ 85 dBA, AND have no associated controls. 1. Establish Program Office 2. Add Supported Organizations 3. Capture Shops 4. Capture Processes 5. Capture Shop Personnel and assign to relevant processes 6. Capture Noise Hazard 7. Capture Controls related to Noise hazard 8. Establish SEG 9. Enter Personal Noise Dosimetry at SEG level 10. Calculate TWAs

CMS 901 / ISR 953-05: Noise Dosimetry Steps 1-9: Noise Dosimetry Captured

CMS 901 / ISR 953-05: Noise Dosimetry Step 10: Noise Dosimetry TWAs

CMS 908 / ISR 953-09: Noise Dosimetry with Recommended Controls This metric builds on CMS 901/ ISR 953-05 % Noise Dosimetry TWA ≥ 85 dbA AND have no associated controls reported in DOEHRS-IH Complete steps 1-10 as CMS 901/ ISR 953-05 11. Enter Control Recommendations at the SEG level Ensure status of recommendation is identified

CMS 908/ISR 953-09: Dosimetry w/ Recommended Controls Step 11: Control Recommendations for Noise at SEG level

CMS 902 / ISR 953-06: Impulse Noise % sound level samples w/ impulse exposures ≥140 dBP, and no controls reported in DOEHRS-IH. 1. Establish Program Office 2. Add Supported Organizations 3. Capture Shops 4. Capture Processes 5. Capture Noise as a hazard 6. Capture Controls related to Noise hazard 7. Establish SEG 8. Enter Noise Sound Level Samples at SEG level

CMS 902 / ISR 953-06: Impulse Noise Steps 1-6: Capture Impulse Noise Samples

CMS 902 / ISR 953-06: Impulse Noise Steps 7-8: Noise Sound Level Samples at SEG level

CMS 909 / ISR 953-10: Impulse Noise with Recommended Controls This metric builds on CMS 902/ ISR 953-06 % Impulse Noise ≥ 140 dBP AND have no associated controls reported in DOEHRS-IH Complete steps 1-8 as CMS 902/ ISR 953-06 9. Enter Control Recommendations at the SEG level Ensure status of recommendation is identified Only recommendations identified under the SEG menu will be used for this metric

CMS 909/ISR 953-10: Impulse Noise w/ Recommended Controls Step 9: Control Recommendations for Impulse Noise at SEG Level

CMS 903 / ISR 953-11: Shop Priority Code % of installation personnel assigned a Shop Priority Code in DOEHRS-IH. 1. Establish Program Office 2. Add Supported Organizations identified 3. Capture Shops (Shop Priority Code is a required field) 4. Enter Shop personnel

CMS 903 / ISR 953-11: Shop Priority Code Step 1-4: Personnel assigned to Shop

CMS 904 / ISR 953-07: Master Schedule Task % of DOEHRS-IH Priority 1 shops that have had one Master Schedule task completed in the past 12 months 1. Establish Program Office 2. Capture Shops (Priority Code is required field) 3. Enter all Program Office tasks via the Master Schedule 4. Populate the correct ‘Close Date’ when tasks are completed

CMS 904/ ISR 953-07: Master Schedule Task Step 1-4: Master Schedule Task completed in past 12 months

CMS 904 / ISR 953-07: Master Schedule Task Step 4: Closed Date Must be Captured