SOUTHERN FRINGE DEVELOPMENTS –CONSTRUCTION MANAGEMENT STRATEGY JUNE 2011 Outline /Full Planning Permissions –provisions 1. Strategic Construction Environmental.
Windsor Park & Ride (Overview & Scrutiny Panel – 29 th October 2007)
Welcome Car Parking Standards. It is important to remember that this is only a Partial Review of selected elements of the RSS – not a Full Review. It.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
T-FLEX Workshop Roger Snoble, L.A. Metro Chief Executive Officer October 29, 2007 Los Angeles County Metropolitan Transportation Authority.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
Seminar 23rd November 2001 Other Policies: Demand Management & Highway Investment Professor Marcial Echenique.
Presentation to the Executive of the Carlisle Partnership 13 July 2009.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Public Consultation A RE YENG REVIEW LINE 2B 13 August 2015.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Integrated Transport Policy / Regional Transport Plan Environment & Regeneration Scrutiny Committee 13 December 2006.
Salford Core Strategy Eccles Political Executive Briefing 14 November 2008.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
Mobility Strategy Update Work Session November 17, 2009 Mobility Strategy Update Work Session November 17, 2009.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure  Dealing with Traffic Growth &  Considering the needs of all Road Users.
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
Transportation Master Plan Randy Scherzer Mike Kelly.
Scenic Highway – Public Meeting
West of England Joint Transport Study
Options consultation launch March 2017
Strategic Transport Forum Friday 15th September 2017
Cambourne to Cambridge Better Bus Journeys
NGTA Halton Planning and Public Works Committee
Milton Road – Bus Stop and Crossings Workshop WSP
A47 / A12 Corridor Improvement schemes
Western Orbital Local Liaison Forum 11TH September 2017.
Cambourne to Cambridge
Saskatoon South Perimeter Freeway Information Session
Technical and Public Advisory Committee Meeting #3
Cambourne to Cambridge Better Bus Journeys – End of Stage Report
Future Investment in the Strategic Road Network
The Regeneration of Swanley
Citrus Park Drive Extension
Manchester Airport -sustainable development plan – Surface access
Fishermans Bend Draft Framework Transport Recommendations
Cambourne to Cambridge Better Bus Journeys East of M11 Workshop Summary 13 November 2018.
KEYNOTE STAGE SPONSOR.
Delivering East West Rail
ORR’s monitoring of Highways England Performance in RIS1 Lessons for RIS2 8 November 2017 Richard Coates.
Current and future investment priorities for the south east
New Public Transport Infrastructure
Presentation to LEP Performance and Investment Committee 16 May 2018
Delivering a world class Heartland
NEIGHBOURHOOD TRAFFIC SCHEMES PRIORITIZATION METHOD
Ad Hoc District Land and Property Use Committee
East Scotland Start your day with a pick me up
Proposed Driscoll Expansion Brookline, Massachusetts
A120 EconomicForum Consultation 27 September 2016.
KEYNOTE STAGE SPONSOR.
HE Designated Funds Cycling Safety and integration (CSI)
Cambourne to Cambridge Better Bus Journeys: On Road Option
Delivering the North East Chelmsford Growth Ambition
East Windsor – Forest Glade Area
Western Orbital: M11 J11 Park and Ride Provision
Engagement Group 13 February 2018.
North East Transport Consultative Forum Thursday 30th May Woodhill House Aberdeen
Suffolk Chamber of Commerce Transport & Infrastructure Group
Future Visions: overview of GCP plans and proposals
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Histon Road LLF Resolutions and Programme
Main needs of electricity system of the Czech Republic
Presentation transcript:

Western Orbital

Officer Recommendations: November 2017 Western Orbital on hold pending Highways England decision on Road Investment Strategy Officers will be recommending that the bus priority at J13 be removed from the Western Orbital project and that it be included as part of the business case development for the Cambourne to Cambridge scheme Officers will not be recommending further assessment of a Park & Cycle at J12 Officers will be seeking authority from the GCP Executive Board to develop a full business case for a new P&R site immediately to the north west of J11 of the M11 including new access arrangements for general traffic and priority for buses using the facility. www.gccitydeal.co.uk

Orbital Catchment Area www.gccitydeal.co.uk

Park & Cycle Sites www.gccitydeal.co.uk

Park & Ride Sites www.gccitydeal.co.uk

Park & Ride Direction of Approach www.gccitydeal.co.uk

Potential Park & Ride Footprint www.gccitydeal.co.uk

Park & Ride Summary Existing Site New Site Expansion   Existing Site New Site Expansion Decking or Underground. Ground Level. Cost £50-97M. £8M. Access Utilising existing Park and Ride access. Access to new site provided directly off A10. Operation Expansion of an existing site would largely operate as existing. Dedicated bus infrastructure would be required to connect the new site to connections east of the M11. Network The network is likely to be severely congested in 2031; dedicated Park and Ride access options would facilitate usage of the Park and Ride site in the AM peak. Egress from the site in the PM peak is a potential constraint. The network is likely to be severely congested in 2031; dedicated Park and Ride access to existing site required for users of Trumpington Park and Ride; access options required to optimise network operation. Planning Partially within greenbelt. Wholly within greenbelt. Environmental Screening for full Environmental Assessment required. www.gccitydeal.co.uk

Next Steps Activity Target completion date* Develop series of distinct options (including P&R and bus priority/access arrangements) January 2018 Present options for consultation to GCP EB March 2018 Public Consultation on Options June/July 2018 Final Option recommendation to GCP EB December 2018 Seek relevant powers to construct January 2020 Start construction Summer 2020 Scheme completion December 2021 *Subject to statutory permissions www.gccitydeal.co.uk