Tribal Data WG Fire and Smoke WG Oil and Gas WG

Slides:



Advertisements
Similar presentations
Uinta Basin Air Quality Study Kathleen Sgamma. Topics Covered  Background  Purpose  Timelines  Project Details  WRAP Phase III Oil & Gas Emissions.
Advertisements

An Update on the Activities of the Western Regional Air Partnership ‘WRAP v2.0’ Robert Kotchenruther, Ph.D. NW-AIRQUEST June, 2011.
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Three-State Air Quality Study (3SAQS) Three-State Data Warehouse (3SDW) 3SAQS Technical Scope of Work: Tom Moore, WESTAR/WRAP on behalf of University.
Technical Support System Review / / RPO Monitoring/Data Analysis Workgroup Conference.
Technical Support System Review Board Meeting March 8, 2007.
Developing a Workplan for Implementing the Strategic Plan for the WRAP Board October 1, 2008.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
2004 Workplan WRAP Regional Modeling Center Prepared by: Gail Tonnesen, University of California Riverside Ralph Morris, ENVIRON Corporation Zac Adelman,
November 7, 2013 WRAP Membership Meeting Denver, CO Tom Moore WRAP Air Quality Program Manager WESTAR Council.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
WRAP CAMx-PSAT Source Apportionment Modeling Results Implementation Workgroup Meeting August 29, 2006.
Western Air Quality Study (WAQS) Intermountain West Data Warehouse (IWDW) Revisions to WAQS Phase 2 SoW: September 2015 – March 2016 University of North.
WRAP Regional Modeling Center April 25-26, 2006 AoH Work Group Meeting Regional Modeling Center Status Report AoH Workgroup Meeting Seattle, WA April 25-26,
WRAP Update WESTAR Meeting San Francisco April 25, 2011.
Response to WRAP Air Managers Committee Memo “Request for Cost Estimates” April 6, 2009 WESTAR Council.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.
2005 WRAP Work Plan WRAP Board Meeting Salt Lake City, UT November 10, 2004.
Introduction Session (Day 1 – ) Phase III/IV Project Technical Workshop #2 November 1-2, 2005 – San Diego, CA.
Three-State Air Quality Study (3SAQS) Three-State Data Warehouse (3SDW) 3SAQS Phase II -- Task Source Apportionment Modeling Study Design University.
Three-State Air Quality Study (3SAQS) Three-State Data Warehouse (3SDW) Options for Completing the 3SAQS Pilot Study University of North Carolina (UNC-IE)
Three-State Air Quality Study (3SAQS) Three-State Data Warehouse (3SDW) 3SAQS/3SDW Progress Review to the 3SAQS Technical Committee University of North.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Portland August 2006 Suggested Changes to IWG Section 308 SIP Template.
The West is different August 14, 2013 OAQPS. Aerosols causing Worst Visibility Days – East vs. West 2.
May 23, 2013 Don Arkell WESTAR Staff WESTAR Council Meeting Tom Moore Air Quality Program Manager Western Governors’ Association.
2005 Progress on Emissions Inventories Attribution of Haze Workgroup Meeting January 24, 2006.
Technical Support System Review Board Meeting March 8, 2007.
Work Items for §309 SIPs WESTAR Fall Technical Conference September 19, 2002 Tom Moore & Brian Finneran.
Status Report to the Stationary Sources Joint Forum:
Visibility Coordinator Regional Haze
WRAP TSC/Co-Chairs Call Workplan Progress Update August 1, 2018
WRAP TSC/Co-Chairs Call Workplan Progress Update August 29, 2018
Monthly Update on WRAP Workplan
WRAP TSC/Co-Chairs Call Workplan Progress Update September 26, 2018
Western Air Quality Study (WAQS) Intermountain Data Warehouse (IWDW)
EPA Office of Air Quality Planning and Standards
Reliability Standards Development Plan
WRAP TSC/Co-Chairs Call Workplan Progress Update October 31st, 2018
Upcoming projects* to support Regional Haze SIP/TIP planning
Western Regional Air Partnership 2003 Technical Workplan Elements
Issues on Ozone Planning in the Western United States
WRAP TSC/Co-Chairs Call Workplan Progress Update December 19, 2018
Adjusting the Regional Haze Glide path using Monitoring and Modeling Data Trends Natural Conditions International Anthropogenic Contributions.
Overview of WRAP 2014 Platform develop and Shake-Out project update
NERC Reliability Standards Development Plan
Western Regional Haze Planning and
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Attribution of Haze Workgroup Organizational Meeting
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Amendment Invoice Task Force Progress Report
timeframe in to be determined
NERC Reliability Standards Development Plan
TIBC Budget Formulation Improvement Project
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Air Resource Specialists, Inc. July 23, 2004
Regional Technical Support Document
Tribal Data WG Fire and Smoke WG Oil and Gas WG
RMC Activity Update Emissions Forum July 1, 2003.
RHPWG – Control Measures Subcommittee Oil & Gas Source Coordination
Regional Haze SIP Status Report
Next Steps on the §309 Regional Technical Support Document April 2003
Fire Emissions and Smoke Management Plans
WRAP Regional Haze Planning Webinar June 20, 2019
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Stationary Sources Joint Forum: Next Steps
Status of Preliminary Reasonable Progress Analysis
Tribal Data WG Fire and Smoke WG Oil and Gas WG
EPA’s Roadmap for the Second Planning Period
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Phase III Progress Update
Presentation transcript:

Monthly Update on 2018-2019 WRAP Workplan September 25th, 2019 TSC and Work Group Co-Chairs Call Tribal Data WG Fire and Smoke WG Oil and Gas WG Regional Technical Operations WG Regional Haze Planning WG

Tribal Data Work Group

Workplan Progress by Tribal Data Work Group Workplan Progress over the Last Month EN3 finalized, distributed to TDWG final tribal contacts list with “active tribes” Emissions Inventories Evaluation- Tribal Oil & Gas final report (August) Workplan Tasks for the Next Two Months Finalize EI Evaluation (Tribal Oil & Gas) – distribution to subject tribes, OGWG WRAP webpage/maps, TSS v2, IWDW webinar with ITEP Send TDWG participation letter – via WRAP staff/WRAP web service

Workplan Coordination Activities by Tribal Data Work Group Workplan Coordination Occurring over the Last Month Communications Framework finalized Tribal contacts list finalized Workplan Coordination Needed over the Next Two Months Distribute EN3’s EI Evaluation to OGWG (2 week turnaround)

Fire and Smoke Work Group

Workplan Progress by Fire and Smoke Work Group Workplan Progress over the Last Month Distributed SMP survey to state and tribal contacts – still gathering info Small contract with OAQPS to help with 2017 Fire NEI – completed Distributed 2017 NEI fire activity survey to WRAP members Reaching out to additional members individually Delivered info to EPA OAQPS Workplan Tasks for the Next Two Months Deliver final representative baseline fire EI to modeling group Collect and collate data for SMP survey Add SMP survey data to WRAP map Work on Future Fire Scenarios EI for sensitivity runs

Workplan Coordination Activities by Fire and Smoke Work Group Workplan Coordination Occurring over the Last Month One RBFFS conference call since last TSC call One FSWG call since last TSC call Workplan Coordination Needed over the Next Two Months

Oil and Gas Work Group

Workplan Progress by Oil and Gas Work Group Workplan Progress Over the Last Month OGWG and Project Management Team (PMT) review and feedback Baseline Inventory – Complete Revised Final Report and Inventory Spreadsheet Completely replaces the previously posted July 2019 report and spreadsheet CO O&G emissions based on new inventories provided by CDPHE & Southern Ute Indian Tribe Williston Basin casinghead gas emissions correction of biased low based on EPA O&G Tool inputs SMOKE-inputs developed for WRAP Modeling and 2016 Emissions Platform Collaborative Forecast Scenarios – Underway Workplan Tasks for the Next Two Months Task 2: Forecast 2028 Inventory (OTB & OTW controls) – September / October “Continuation of Historical Trends” Scenario including controls analysis (September) “Reduced Legacy Well Activity” and “Increased Horizontal Well Activity” Scenarios (October) Task 3: Forecast 2028 Inventory (Additional Reasonable controls) – End of 2019 Single forecast scenario and integrate OGWG survey data Task 4: Agency Program Review Task – End of 2019

Workplan Coordination Activities by OGWG Workplan Coordination Occurring Over the Last Month September 3 & 17 – Project Management Team Calls Coordinate and PMT feedback with Ramboll Workplan Coordination Needed Over the Next Two Months Oct. 1 – OGWG Webinar Midterm Update October 8 – OGWG Bi-Monthly Call Oct. 15 & 30 – Project Management Team Calls OGWG and PMT review and feedback on draft work products Sept. 20 – Oct. 1 Forecast “Continuation of Historical Trends” Scenario Draft Report & Spreadsheet Coordination with RHPWG Control Measures Subcommittee Coordination (External to WRAP) Occurring / Needed EPA’s 2016 Modeling Platform Collaborative – availability of OGWG baseline & future inventory 2017 NEI – account for inventory improvements

Regional Technical Operations Work Group

Workplan Progress by RTOWG Workplan Progress over the Last Month Coordination with contractor on modeling progress for 2014v2 Calls on 9/4 and 9/15 Given delays in emission processing, eliminate some of the non-critical sensitivity runs MEGAN biogenic emissions Shortened (one month) fire plume rise evaluation CMAQ simulation (to compare with CAMx) deferred, but will be completed if time/$ allows Updates to emission inventory for 2014v2 shakeout simulation Reprocessing O&G emissions to fix error Re-mapping CMAQ dust and anthropogenic SOA precursor emissions to CAMx GEOS-Chem “natural conditions” run finished Representative Baseline EGU Emissions and Temporal Profiles Bi-weekly RTOWG co-chair coordination calls Reviewing EPA 2016 modeling TSD

Workplan Progress by RTOWG Workplan Tasks for the Next Two Months Finish updates to 2014v2 emissions and run CAMx Abbreviated fire plume rise sensitivity run GEOS-Chem “international contributions” run Feed the two GEOS-Chem runs (“natural conditions” and “international contributions”) to CAMx Broad-Based Anthro vs. Natural PM Source Apportionment Representative Baseline Emissions Modeling Representative Baseline PGM Modeling Dynamic Evaluation Scoping 2028 Mobile Source Emissions Projections 2028 PGM Modeling and Visibility Projections Analysis of EPA’s 2016 Beta-Prime Platform and 2028 Visibility Projections Aiming to have 2028 simulations done by end of 2019

Workplan Coordination Activities by RTOWG Workplan Coordination Occurring over the Last Month RTOWG monthly call on 9/10 EPA RH Guidance Webinar 9/10 Participation on Coordination & Glide Path Subcommittee (9/12) RTOWG modeling progress call (9/4 and 9/19) Workplan Coordination Needed over the Next Two Months RTOWG calls: 10/15, 11/12 ~weekly discussions with Ramboll to discuss modeling progress 2016 model performance call with EPA 9/25

Regional Haze Planning Work Group

Workplan Progress & Coordination by Regional Haze Planning Work Group Workplan Progress and Coordination over the Last Month New Co-chair: David Stroh from North Dakota Final review of and consensus on the WRAP Communication Framework (September) Review of example 4-factor analysis by North Dakota Outreach and coordination with FSWG to complete Smoke Management Plan Survey Workplan tasks and Coordination for the Next Two Months Next milestone webinar planned for October 3 Review of EPA’s Regional Haze Guidance Development of Regional Haze in the West Storyboard Coordinate ongoing discussions of controls and modeling – both require states to consult with sources

Workplan Progress by Control Measures Subcommittee Workplan Progress over the Last Month No call was held in August States continuing work on 4-factor analysis Workplan Tasks for the Next Two Months Plan to discuss the evaluation of mobile sources, other area sources and how to analyze EGU retirements on the next call scheduled for Sept 23rd

Workplan Coordination Activities by Control Measures Subcommittee Workplan Coordination Occurring over the Last Month Workplan Coordination Needed over the Next Two Months Continue to coordinate with O&G work group and Emission Inventory Subcommittee on emission forecasts.

Workplan Progress by Coordination and Glide Path Subcommittee Workplan Progress over the Last Month Discussion on status of Coordination Framework Review of TSS FAQ Document Initial discussion on TSS Glossary Workplan Tasks for the Next Two Months Finish review of FAQ’s and elevate it to RHPWG for further review Come to consensus on if current TSS Glossary meets needs Revisit TSS Priorities document

Workplan Coordination Activities by Coordination and Glide Path Subcommittee Workplan Coordination Occurring over the Last Month The subcommittee coordinated with the following entities: RHPWG – Elevated Coordination Framework for Consensus Workplan Coordination Needed over the Next Two Months RTOWG – Coordination on Natural Conditions Project findings and opportunities to model outcomes for future planning periods. RTOWG – TSS Priorities for Modeling/EI

Workplan Progress by EI&MP Subcommittee Workplan Progress over the Last Month Sent out memo describing Shakeout v2 updates Contractor finalizing Shakeout v2 simulations Sent out Procedural guidance for preparing OTB/OTW emissions updates Sent out EGU projection methodology and proposed mobile methods Workplan Tasks for the Next Two Months Deliver Rep. Baseline emissions from states/locals to contractor Contractor to start Rep. Baseline simulations

Workplan Coordination Activities by EI&MP Subcommittee Workplan Coordination Occurring over the Last Month O&G v2 emissions will come from contractor based on state comments Workplan Coordination Needed over the Next Two Months representative baseline, and OTB modeling scenarios require coordination as needed with O&G WG, contractor, and Fire & Smoke WG Coordinate with C&GP subcommittee to provide guidance to states on what is needed from them for the different modeling scenarios

End of Workplan Progress Update