AC-Dipole Limitations and Options for its Upgrade

Slides:



Advertisements
Similar presentations
Lorentz force detuning measurements on the CEA cavity
Advertisements

Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Oscilloscope Watch Teardown. Agenda History and General overview Hardware design: – Block diagram and general overview – Choice of the microcontroller.
Failure mode impact studies and LV system commissioning tests
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
8114A Overview. 8114A Overview 10-Feb-04 Page A Overview 1) Specifications and Applications 2) Operational Overview 3) Block Diagram.
Initial Performance Results of the APS P0 (Transverse Bunch-to-Bunch) Feedback System N. DiMonte#, C.-Y. Yao, Argonne National Laboratory, Argonne, IL.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Controls renovation workshop Standardized Hardware Modules Javier Serrano, AB-CO-HT MJD
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
A.Blas APC meeting 12/5/ Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
RF source, volume and caesiated extraction simulations (e-dump)
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
LIU-ABT systems: PSB BI.DIS controls prepared by R.A.Barlow (September 2014) 1 CERN TE-ABT-EC.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Rectifier-Capacitor Threshold Tracer for mu2e Straw Chamber Wu, Jinyuan Fermilab Jan
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Created by Tim Green, Art Kay Presented by Peggy Liska
Electronic Devices Ninth Edition Floyd Chapter 15.
RF acceleration and transverse damper systems
Outcome of BI.DIS Fast Interlocks Peer Review
Data providers Volume & Type of Analysis Kickers
R. Denz, A. Gomez Alonso, AT-MEL-PM
Working groups status report on Feedbacks
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
SLS Timing Master Timo Korhonen, PSI.
Injectors BLM system: PS Ring installation at EYETS
Excitation by ADT and active bunch-by-bunch tune measurements
LHC Beam Dumping System Reliability Run Summary
EC Activities Status for the LIU
MKD/MKB Review Meeting Scope and Definition
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Technical Session CERN ISOLDE – Workshop 2016
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC wire scanners status
the CERN Electrical network protection system
Proton Source and LEBT Luigi Celona & Lorenzo Neri
POWER AMPLIFIERS.
Klystron Power Supplies for ILC
Remote setting of LHC BLM thresholds?
Neurochip3.
Combiner functionalities
Amplifiers Classes Electronics-II
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
Amplifiers Classes Electronics-II
Control System Summary of Changes Since PDR
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
PID meeting Mechanical implementation Electronics architecture
LIU BWS Firmware status
HL-LHC power converter requirements Thermal settling drift
Red Pitaya with EPICS Andraz Pozar EPICS Collaboration Meeting
Presentation transcript:

AC-Dipole Limitations and Options for its Upgrade 147th HiLumi WP2 Meeting - 14.05.2019 N. Magnin for ABT team 5/14/2019 147th HiLumi WP2 Meeting

AC-Dipole Overview ACD FEC : ACDipole FESA class for settings/state control Timing event for trigger X3-Servo card to generate the waveforms Serial port to check power amplifiers configuration PLC : Mode control (CCR keys) Beam permit control (BIS) ROSS relay control (Closed in AC-Dipole mode only) Power distribution control HV Generator : 2x Power Amplifier / Power transformers Capa Bank Safety ROSS relay Resonant System: Capa bank / Magnet Block diagram of AC-Dipole system 5/14/2019 147th HiLumi WP2 Meeting

AC-Dipole Overview Some pictures… (before LS1) MKQAc systems at point 4 (UA43) Front of Generator: - 1 FEC (Moved outside generator during LS1) - 2 Power Amplifiers Some pictures… (before LS1) Each MKQAc generator is a combination of 3 generators in 1: Tune Aperture AC-Dipole Integration could be improved… PLC 5/14/2019 147th HiLumi WP2 Meeting Courtesy: R.A. Barlow

Present Main Parameters Value Limitation Element Max pulse repetition [s] 60 Power dissipation in transformers Max flat-top length [ms] 600 FPGA card gateware (1s waveform max) Max current [A] ~1700 Power dissipation in transformers / Amplifiers Bandwidth H [Hz] at max I (Software limits, at lower I) ~3000 – 3300 (2700 – 3600) Fixed Capa-Bank value: Resonant system centred at ~3150 Hz Output voltage limit on Amplifiers Bandwidth V [Hz] at max I ~3400 – 3750 (3000 – 4000) Fixed Capa-Bank value: Resonant system centred at ~3500 Hz 5/14/2019 147th HiLumi WP2 Meeting

Pulse Length Limitation FPGA Card X3-Servo: Max memory = 1Msamples, at 1MS/s Max pulse length = 1s Before LS1, the pulse length was limited in software to 200 ms. 600 ms flat-top is the max pulse length that we can provide now. AC-Dipole waveform after LS1: Fixed 200 ms ramp up/down Max 600 ms flat-top X3-Servo XMC card 5/14/2019 147th HiLumi WP2 Meeting

Power Limitation Main limiting elements: Power amplifiers: Simulation of impedance of resonant system: 2 Ohm at resonance, much lower apart ! Main limiting elements: Power amplifiers: 2x PowerSoft Digam K20: (Each 18 kW on 4 Ohm) Power transformers: 2x CME transformers: custom design (Each 18 kVA) Pulse peak current limited by amplifiers: Lower performance apart resonance, impedance < 2 Ohm Impedance not optimal for amplifier over all frequency band? Pulse rate limited by transformer: 1 pulse every 60s 2 Ohm 1 Ohm 2 kHz 3 kHz 4 kHz 5/14/2019 147th HiLumi WP2 Meeting

Band-Pass Limitation Resonant system: Fixed Capa Bank Values Fixed center frequencies for H / V Initial design was to have a variable capa bank, it was never implemented. Kicker Type Capa Bank [uF] Center Freq [Hz] Horizontal 722 3148 Vertical 582 3485 Max current: Voltage / Frequency limit => OP max voltage is limited in FESA software using a reference table Vmax(f). 5/14/2019 147th HiLumi WP2 Meeting

Many problems seen during operation Waveform distorted sometimes: Power amplifier thermal protection/compression? Many power amplifiers broken! “For large kicks, AC dipole reaches limit of strength before 100%” Is the system pushed at the limit since FT increase from 200 to 600ms ? We are blind, difficult to understand problems as we miss diagnosis PLC / FESA software problems: System not turning ON properly, have to send the ON request many times Large kick for 0V strength System pulsing with previous voltage for 1 kick sometimes (Aperture mode) Distorted kick See OMC meeting presentation: Felix Carlier – 28.08.2018 https://indico.cern.ch/event/750148/ 5/14/2019 147th HiLumi WP2 Meeting

Missing Diagnosis Tools More software diagnosis needed since long time (No hardware development/procurement needed): Provide diagnosis for amplifier configuration/faults Acquisition of all amplifier voltage/current waveforms for Internal Post Operation Check (IPOC) (check current sharing between amplifiers, etc… Now IPOC only acquires magnet current) Magnet current shown in IPOC-Explorer Power stage - Voltage and Current probes: Signal acquired by FPGA, but not used by software… 5/14/2019 147th HiLumi WP2 Meeting

New Requirements from BE/ABP Parameter Present Value Requested New Value Max pulse repetition [s] 60 10 (30) Max flat-top length [ms] 600 3600 (40’000 turns) (20’000) Max current [A] 1700 ~1900 (Increased kick for 7.5TeV operation ?) Bandwidth H [Hz] at max I (Software limits, at lower I) ~3000 – 3300 (2700 – 3600) Tune: 0.26 - 0.34 (0.5 for MD) => ~2900 – 5700 Bandwidth V [Hz] at max I ~3450 – 3750 (3000 – 4000) Tune: 0.28 - 0.34 (0.5 for MD) => ~3100 - 5700 ~40x more average power dissipated in closed generator without cooling ! => Completely new generator design needed ! (New concept?) After discussion with Rogelio, relaxed requirements proposed in red: Max length not needed at max power, limit the voltage depending on the length (max power limit) Frequency change can be done between MDs, not from pulse to pulse (= Access to change capa bank value ? Already possible today, needs procedures) 5/14/2019 147th HiLumi WP2 Meeting

Maintenance during LS2 Migration of all software to new BE/CO version (FESA3 v7/8, Silecs, etc…) Generation of a new Linux 64bit driver for X3-Servo FPGA card Adaptation of FESA software to new driver Correction of bugs seen in operation: State Control problems (ON / OFF / STANDBY commands) Setting Control (Pulse Amplitude/Frequency) Etc… Problems with compressed waveforms / Amplifiers broken: Revise Max Voltage vs Frequency limits Perform measurements on Test Bench and 4 LHC AC-Dipoles at various frequencies/amplitudes Redefine limit reference tables, more conservative to increase availability 5/14/2019 147th HiLumi WP2 Meeting

Upgrade: Suggested Work Package 1 Software upgrade: Software development for diagnosis improvement Provides diagnosis for amplifier configuration/faults Acquisition of all amplifier output voltage/current waveforms for IPOC (check current sharing between amplifiers, etc…) Validation on test bench Installation & Commissioning Manpower 0.5 FTE (missing) Budget - 5/14/2019 147th HiLumi WP2 Meeting

Upgrade: Suggested Work Package 2 Software & Gateware & Hardware upgrade: New FPGA gateware development: Pulse length / rate limits increased, power is the limit. Improve fault detection based on amplifier output voltage/current measure New FPGA hardware (X3-Servo probably obsolete) New Linux 64bit drivers, adaptation of FESA Software Validation on test bench Installation & Commissioning Manpower 0.5 FTE (missing) Budget 50 kCHF 5/14/2019 147th HiLumi WP2 Meeting

Upgrade: Suggested Work Package 3 New AC-Dipole power generator design: New power circuit, variable capa bank(?), cooling(?), etc… tbd Max pulse length + max pulse rate + max current Production of prototype and validation on test bench Production of 4 generators & spare Installation & Commissioning We would need a pre-study for more accurate estimate, based on final new functional specification Manpower 2 FTE (missing) Budget 350 kCHF (1 prototype + 5 production) 5/14/2019 147th HiLumi WP2 Meeting

Summary Problems seen in operation during LHC run 2 should be fixed after LS2 OP limits probably lowered after LS2 to increase availability AC-Dipole performances are limited, BE/ABP has new requests for HL-LHC We need a new AC-Dipole specification from ABP. This upgrade can be split into small work units and staged Missing resources (P+M) to work on this system 5/14/2019 147th HiLumi WP2 Meeting

Spare slides 5/14/2019 147th HiLumi WP2 Meeting

Variable Capa Bank 5/14/2019 147th HiLumi WP2 Meeting