Fiber Reinforced Polymer Systems

Slides:



Advertisements
Similar presentations
1 FAA/NASA/Industry Review of Key Characteristics for Composite Material Control Mark Chris, Principal Engineer Bell Helicopter Textron Composite M&P /
Advertisements

Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
Presented by: Derrick Castle, PCS Kentucky Transportation Cabinet Writing a Good Specification for Bridge Painting.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Neptune Research Inc. Introduction For more than 25 years, Neptune Research Inc. has focused its strategic research initiatives on the development, manufacturing.
Supervision and Administration
2/27/2013DSA - PROJECT CERTIFICATION1 STREAMLINING PROJECT CERTIFICATION CHANGING CULTURE AND CHANGING PROCESSES DSA: CHANGING CULTURE & CHANGING PROCESSES.
Contractor Safety Management
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Overview Lesson 10,11 - Software Quality Assurance
FAA Workshop on Key Characteristics for Advanced Material Control
CONTROL OF CORROSION ON UNDERWATER PILES
Quality Assurance/Quality Control Policy
ISO 9000 Certification ISO 9001 and ISO
Fiber-Reinforced Polymer (FRP)
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Module 7: Construction Phase
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Why DURA-CRETE? DRIVEWAYS BY: YOUR NAME HERE. Agenda/Topics  DURA-CRETE Program History  DURA-CRETE The “Mix”  Installer’s Certification Process 
S oftware Q uality A ssurance Part One Reviews and Inspections.
Visit us at E mail: Tele:
Regulatory Reform Program Proposed Design Approval Rules CASR Parts 21 and 146 Ian Kearsley Manager Engineering Support Section This presentation is.
Allen Hughes State Materials Office
NBIS – National Bridge Inspection Standards National standards for the proper safety inspection and evaluation of all hwy bridges NBI – National Bridge.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
PSPC/Coating Technical File (CTF)
1. 2 Background Bill C-3, International Bridges and Tunnels Act: –introduced in the House of Commons on April 24, 2006 –received Royal Assent on February.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Air Products Solutions for EN th of November 2014 Air Products Internal Use Only Name of speaker.
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
US Army Corps of Engineers BUILDING STRONG ® FIMS Annual Comprehensive Training Bridge File Content and Management May 2016.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Minimum Set of Requirements for Suppliers
CIVI 6061-Strengthening of bridges using FRP
Minimum Set of Requirements for Suppliers
AND AFTER INSTALLATION Technical Director, NASSCO
Administration of a FIDIC Contract - Project Control
Content of Tender Dossier - Instructions to Tenderers - Tenders
JACKETING Er. SHAIKH ARSHAD VJTI MTECH CM. INTRODUCTION It is a part of retrofitting i.e. repair, renovation, strengthening. Retrofitting is the modification.
Acceptance Process for Manufactured Products by Certification:
Tuscarawas County Health Department Operation Permit
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Traceability of Gas Pipeline Materials Research & Materials Manager
Quality Management Systems – Requirements
ABCD What’s New In Bridges
Construction Management
Engineering Processes
Quality Control Personnel Training
QC Personnel Responsibilities
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
What is the UL QFCP? FCIA Webinar Presenters:
2018 Revisions to NYCDOB Code
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Quality Assurance for Emulsified Asphalt Surface Treatments
Operationalizing Export Certification and Regionalization Programmes
OCPS CCNA SELECTION COMMITTEE TRAINING
Software Reviews.
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

Fiber Reinforced Polymer Systems

VDOT Requirements Fiber Reinforced Polymer Systems Fiber Reinforced Polymer Systems consist of installing carbon reinforced polymer (FRP) wrap for repairing and /or strengthening concrete superstructure or substructure members. Section 412.03 (s) of the VDOT Specifications – Fiber Reinforced Polymer System. Measured and paid for by the square foot. Fiber Reinforced Polymer Wraps shall meet the requirements of the specific conditions of the project as determined by the Engineer. Material requirements for acceptable systems will be included in the Contract. The plans will provide the flexural, shear, or axial strength requirements for the member to be repaired or strengthened.

Fiber Reinforced Polymer Systems The contractor shall submit working drawings. The contractor shall submit a Quality Assurance Plan . Qualifications of Contractor - Contractor/Sub-Contractor shall be approved by the Engineer for each FRP system scheduled for use on the project . Manufacturer’s Representative: The Contractor shall have present during the installation of the FRP system, a manufacturer’s representative, knowledgeable in the methods of installation of the FRP system. The manufacturer’s representative shall certify that the system was properly installed at the completion of the installation prior to final payment to the Contractor.

Fiber Reinforced Polymer Systems The FRP system shall be installed in accordance with the recommendations of the manufacturer of the FRP system. During installation of the FRP materials, the installer shall maintain a daily log. Statewide Average Unit Prices as ofJuly8, 2019 Superstructure FRP Wrap = $260/SF Substructure FRP Wrap - $66/SF

Fiber Reinforced Polymer Systems AASHTO Guide Specifications for Design of Bonded FRP Systems for Repair and Strengthening of Concrete Bridge Elements, 1st Edition

Fiber Reinforced Polymer Systems ACI 440.2R-17: Guide for the Design and Construction of Externally Bonded FRP Systems for Strengthening Concrete Structures

Fiber Reinforced Polymer Systems FHWA Report on Techniques for Bridge Strengthening https://www.fhwa.dot.gov/bridge/pubs/hif18041.pdf This report provides a summary of the findings of Task 6: Report on Techniques for Bridge Strengthening, one task performed under Project Award: DTFH61-11-H-00027: Advancing Steel and Concrete Bridge Technology to Improve Infrastructure Performance. It has been found that the vast majority of new strengthening methods involve applications of composite materials including (1) externally bonding FRP, (2) near-surface-mounting FRP, (3) post-tensioning of FRPs, (4) fiber reinforced cementitious matrix as a strengthening system, (5) spray FRP as a strengthening system, and (6) column retrofitting with FRPs.

Fiber Reinforced Polymer Systems Reference Slides

Fiber Reinforced Polymer Systems The Contractor shall submit the following documents to the Engineer for approval prior to beginning the work: Working Drawings shall be submitted to the Engineer for review in accordance with Section 105.10. The working drawings shall be certified by a Professional Engineer holding a valid license to practice engineering in the Commonwealth of Virginia. Working drawings shall include the type of FRP system, number of layers and orientation of all FRP materials, repair locations, relevant dimensions of the system and the work plan including the necessary preparations of the existing structure. The drawings must be accompanied by the design calculations, the MSDS and the manufacturer’s system data sheet identifying mechanical, physical and chemical properties of all components of the FRP system; application guide, including the installation and maintenance procedures; and time schedule for various steps in the repair process. The installation procedure must clearly identify any environmental and substrate conditions that may affect the application and curing of the FRP system. The design calculations shall be performed in accordance with the current AASHTO and ACI specifications and guidelines for FRP systems.

Fiber Reinforced Polymer Systems Quality Assurance Plan - The Contractor shall be responsible for developing and implementing a quality assurance plan for all FRP materials and processes scheduled for use on the project. The quality assurance plan must be submitted to and approved by the Engineer prior to beginning FRP operations on the project. The plan shall include specific procedures for personnel safety, tracking and inspection of all FRP components prior to installation, inspection of all prepared surfaces prior to FRP application, inspection of the work in progress to assure conformity with specifications, quality assurance samples, inspection of all completed work including necessary tests for approval, repair of any defective work, and disposal and clean-up. Any part of the work that fails to comply with the Contractor’s approved Quality Assurance Plan and the Contract requirements will be rejected by the Engineer, and shall be remedied, or removed and replaced by the Contractor at his own expense.

Fiber Reinforced Polymer Systems Qualifications of Contractor - Contractor/Sub-Contractor shall be approved by the Engineer for each FRP system scheduled for use on the project after providing the following necessary information: a. Minimum of 3 years of documented experience in installing the designated FRP system or 15 documented similar field applications within the last 5 years with acceptable reference letters from respective Owners; and b. Certificate of completed training from Manufacturer/Supplier for at least one field representative who will be present on site throughout the project

Fiber Reinforced Polymer Systems Manufacturer’s Representative: The Contractor shall have present during the installation of the FRP system, a manufacturer’s representative, knowledgeable in the methods of installation of the FRP system, for technical expertise and to certify that the Contractor’s personnel installing the system are knowledgeable and are installing the system’s components in accordance with the manufacturer’s instructions. The Contractor shall also arrange to have the manufacturer’s representative present during testing of the material by the Engineer. The manufacturer’s representative shall certify that the system was properly installed at the completion of the installation prior to final payment to the Contractor.

Fiber Reinforced Polymer Systems The FRP system shall be installed in accordance with the recommendations of the manufacturer of the FRP system During installation of the FRP materials, the installer shall maintain a daily log. This log shall provide material tracking and process records for each installation and shall include the following information: • Structural element identification with project name, contract number, and installation date. • Materials information including product name, description, date of manufacture, time of expiration, and lot or batch numbers. • Fabrication, inspection and verification data for the manufacturing and construction operations including square footage of fabric and volume of epoxy used each day, number of layers, thickness measurements, ambient temperature and humidity readings at the beginning, middle and end of each casing installation shift.