Digital AIM Training - Introduction Introduction – day 2 AIXM 5.1 Seminar Introduction – day 2 Copyright - EUROCONTROL 2011
Digital AIM Training - Introduction AIXM version 5.1 XSD UML Temporality Concept www.aixm.aero Copyright - EUROCONTROL 2011
Digital AIM Training - Introduction AIXM 5.1 - scope Copyright - EUROCONTROL 2011
Digital AIM Training - Introduction Obstacle Copyright - EUROCONTROL 2011
Digital AIM Training - Introduction AIXM temporality Copyright - EUROCONTROL 2011
AIXM 4.5 – 5.1 Mapping in EAD
AIXM 5.1 Implementation (1) Analysis, Specifications, Development, Testing AIXM 5.1 Obstacles Upload Digital NOTAM Increment 1 Min SDO Download 6 months Obstacles Upload / Download Min SDO Download Digital NOTAM Increment 1 AIXM 5.1 decoupling EAD Pre-Ops Min SDO Download EAD Production R6 R6E1 R7 MAR 2011 NOV 2011 APR 2012
AIXM Viewer
Aeronautical Data Quality (ADQ) COMMISSION REGULATION (EU) No 73/2010 “laying down requirements on the quality of aeronautical data and aeronautical information for the single European sky” Basically; Turning Annex 15 into European Law Compliance dates: 2013-2017 Means of Compliance Electronic AIP (eAIP) Published Aeronautical Information Exchange (AIX) Final Draft AIXM 5.1 is proposed as compliant model Data Quality Requirements (DQR) Under development Data Assurance Levels (DAL) Under development Data Origination (DO) Under development
AIXM for ADQ
Digital AIM Training - Introduction Day 2 Day 2 – 13 December (09:00 – 16:00) 09:00-09:20 Review Day 1 09:20-10:00 Metadata 10:00-10:45 AIXM packages Procedures Coffee break (30 min) 11:15-11:45 Business Rules 11:45-12:30 Geometry encoding aspects Lunch (60 min) 13:30-14:00 Digital NOTAM – overview 14:00-14:30 Digital NOTAM Event Specification 15:00-15:30 Digital NOTAM Event Specification (cont.) 15:30-16:00 Open discussions and closing Notes: Copyright - EUROCONTROL 2011