Electronic : PH0 (former IH0)

Slides:



Advertisements
Similar presentations
INAF-OATs WorkShop – Trieste - 21 June 2013 V.Baldini MA05 INAF-OATs Workshop ESPRESSO Control Electronics Status.
Advertisements

Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
IFPAC-NeSSI Report.ppt; 29 January 2008; Slide 1Siemens Energy & Automation, Inc. Criteria for Design and Specification NeSSI Issues Presentation to IFPAC.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
SKA Pre Construction Phase Infrastructure Tracy Cheetham Carel van der Merwe General Manager: Infra & Site OpsInfrastructure System Engineer
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Ch 181 Chapter 18 Electric Currents © 2002, B.J. Lieb.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Building a PC. Motherboard Selection Ensure the selected motherboard is appropriate for the processor model and frequency you are planning to use AMD.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
How to Build a MAN Last Update Copyright Kenenth M. Chipps PhD 1.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
CABLING SYSTEM PROTECTION. Screening/Shielding  1 In the Signamax Cabling System for the efficient screening of the telecommunications systems, the screen.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Installation of the T600 at Fermilab CSN2, September 22,
POIWG#38 ARTE - Thermal Exchange Presenter: Valerio Di Tana (Argotec)
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
Alice TOF Production Readiness Review Gas Control Systems.
S A Griffiths CM42 June 2015 Electrical & Control.
EC: 7 DISK concept Preliminary considerations
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
Chapter 8. Electrical Systems
Teleconf ACS – FREIA 28th March 2017
Electronics and Controls
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
STRAW TRACKER SYSTEM CAD STATUS :
TC activities.
IT-4189 Supply and installation of a cryogenic distribution system
Calorimeter Mu2e Development electronics Front-end Review
Update of MVD services and requests
End-cap Mechanics FDR Overview of the Project
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
CMS Area Working Group Meeting
Double Star Progress Meeting #3 Beijing 2 July, 2002.
Mechanics: (Tim).
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Peer Review Agenda (Suggested).
The Electric Circuit.
EET 323 – Electrical System Design Lecture 9: Grounding
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
SNS PPU Cryomodule Instrumentation
1-2 Grounding Principles and CF Infrastructure in Instruments Halls
Series 5300 Lithium Cell Formation System
as a prototype for Super c-tau factory
Command and Data Handling
Status of the ESS High Power RF Systems
SNS PPU Cryomodule Instrumentation
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Electronic : PH0 (former IH0)

IH0 to IS0 interface

boundaries Mass limitation: 3T EVERYTHING included (cabling, all electornic) Volume to be agreed (number of rack) Heat dissipation limit (still to be defined) Electrical power limit (see next slide) Number and frequency of motion

Time budget Time Budget in start up shut down online to/from standby and standby to/from offline time. Time Budget in integration Time budget in maintenance

Interface to Telescope MAO-IH0-3.10.1.1 E-ELt provide routing tray The E-ELT System shall provide in the form of a metallic tray for cabling and piping, permanently installed on the Telescope Main Structure, with a minimum cross-section of 400x200 mm. The pipe and cable trays provided by the E-ELT System will not extend into the Nasmyth Instruments design volume. MAO-IH0-3.10.1.2 E-ELT define cable paths The E-ELT System shall define the routing path for the above cable tray considering the need for maintenance access after first installation. MAO-IH0-3.10.2.1 Routing inside the volume "shall procure, deliver and install the cabling and piping including its thermal insulation, between the SCPs and itself (IH0). shall procure, deliver and install the cabling and piping routing (e.g. metallic trays) inside the instrument design volume up to itself (IH0)"

Interface to subsystems I-IH0/IP0-1.4.2 Electrical bonding "The electrical bonding between the IP0 and the rest of Maory will be defined for the MAORY FDR" I-IH0/IP0-1.4.3 Grounding and Isolation "A common grounding between the IP0 and the rest of Maory will be defined for the MAORY FDR" I-IH0/IP0-1.4.4 Shielding "The shielding strategy between the IP0 and the rest of Maory will be defined for the mAORY FDR" I-IH0/IP0-1.4.5 Electrical Power Allocation to IP0 "The power allocation from IH0 to IP0 (to drive the motors) is: Average (over 24hours) normal power: xx kW Peak normal power: xx kWAverage (over 24hours) safety power: xx kW"

Routing I-IH0/IP0-1.4.1 Cabling definition for Opto-mechanical mountings The Opto-mechanical mountings will be connected to ICH through the cable defined in XX I-IH0/IM0-1.2.5 Cable routing Optomechanics The cable routing from the Optomechanical mountings to IH0 is defined by IM0 in XX I-IH0/IM0-1.2.6 Pipe routing Optomechanics The pipe routing from the Optomechanicsequipment to IT0 (manifold) is defined by IM0 in XX

Interface to software

Review of subsystem specifications Electronics Review of subsystem specifications what are the requirements assumed so far for the design? are ALL the specifications and recommendation from ESO taken into account? (materials to be used, standards, connectors, best-practices, …) new requirements from baseline   Current status of design and analysis overview of the entire electronic system of MAORY distribution of cabinets, routing between cabinets, routing to devices, mechanical interface to the Nasmyth internal layout of the cabinets list of selected devices/controller distributed vs centralized controllers on the main bench prototyping: short term, medium term plan power/mass/cooling budget update operational scheme (what is always on, who switch on/off who) safety (overcurrent / overtemperature / glycol leaks / …) AIV Sub-system coordination  internal guidelines / standards to be followed by everyone working on electronics common services: power supply, cabinet thermal insulation and cooling, data distribution how do you share activities between electronics of MPO, CalUnit, LGSW, LOR interface with the telescope and MICADO interfaces with bench  schedule towards PDR cost estimate