eSPS Impedance Considerations Aaron Farricker Acknowledgements: T

Slides:



Advertisements
Similar presentations
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
A longitudinal damper for the PS (preliminary ideas) 24 April 20121M. Paoluzzi BE/RF.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
The RF system for FCC- ee A. Butterworth, CERN Thanks to: O. Brunner, R. Calaga, E. Jensen, E. Montesinos, F. Zimmermann (CERN), U. Wienands (SLAC)
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
1 Consequences of RF system failures during LHC beam commissioning T.Linnecar AB-RF.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
Operation Status of the RF Systems and Taiwan Photon Source
Harmonic system for LHC
Harmonic system for LHC
CEPC APDR Study Zhenchao LIU
Longitudinal impedance of the SPS
Higher Order Modes and Beam Dynamics at ESS
Results from single unit-cell simulations
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Status and prospects of VEPP-5 Injection Complex
Design Fabrication and Processing Group H. Padamsee
Longitudinal beam parameters and stability
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
HOM power in FCC-ee cavities
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Bunch Separation with RF Deflectors
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Implications of HOMs on Beam Dynamics at ESS
Overview of SRF system of Ring and Linac (1)
Electron Source Configuration
CEPC APDR SRF considerations(3)
The LHC25ns cycle in the PS Triple splitting after 2nd injection
I Alexander Nass for the JEDI collaboration
LHC (SSC) Byung Yunn CASA.
PSB magnetic cycle 160 MeV to 2 GeV
Beam dynamics requirements after LS2
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring
DQW HOM Update and Recent Developments
Cryomodules Challenges for PERLE
SPS-DQW HOM Measurements
Collective effects in the SPS and LHC (longitudinal plane)
CEPC APDR SRF considerations(4) -LEP Cavity Voltage &BBU
Kicker and RF systems for Damping Rings
CEPC SRF Parameters (100 km Main Ring)
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Parameters Changed in New MEIC Design
RF Parameters for New 2.2 km MEIC Design
Update on Crab Cavity Simulations for JLEIC
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
Presentation transcript:

eSPS Impedance Considerations Aaron Farricker Acknowledgements: T eSPS Impedance Considerations Aaron Farricker Acknowledgements: T. Bohl, R. Calaga, I. Karpov, J. Repond & E. Shaposhnikova eSPS, 17/06/19

Important Considerations Instability directly caused by additional impedance Loss of Landau damping due to broadband impedance sources Coping with strong beam loading for LHC and fixed target beams eSPS, 17/06/19

Choice of Cavities – LEP Era Requirement: 10 MV of accelerating field for 16 GeV electrons 10 normal conducting, 200 MHz cavities Powered independently by 60 kW power supplies HOM couplers damp the HOMs well A damping loop is used to de-Q the accelerating mode during proton operation Do the HOMs cause instability for the HL-LHC and FT beams? Can the cavities take the induced power? What effect does the loss of power have on the proton beams? eSPS, 17/06/19

Choice of Cavities – LEP Era Requirement: 10 MV of accelerating field for 16 GeV electrons Initial simulations indicate that the HOMs suggest little effect on the stability of the proton beams (Full study needed) The power induced in the HOMs is also not a major concern However the damping loop for the accelerating mode in the LEP era was designed for 3 kW With LIU beam it could be 15 kW average per cavity (LEP era it was 3 kW) inducing 400 kV in total – Can the damping system handle this? Also vacuum leaks were caused in the past by the bellows on the damping loop. Mechanical integrity for parallel operation is challenging The beam induced voltage is about 4% of the available voltage for protons Adds 40% to the impedance at 200 MHz (Instability source) No feedback possible at the cavity due to damping Without the damping loop Q is is approximately 50k implying MW’s of power eSPS, 17/06/19

Choice of Cavities – SRF Requirement: 10 MV of accelerating field for 16 GeV electrons (6.7 mA average) In-line system Approximately five single cell 800 MHz SRF cavities (LHC Landau Cavity?) beam loading is less challenging than at 200 MHz Heavily damped HOMs Seen by the SPS proton beam How can the impedance of the cavity be compensated through the SPS cycles using feedback? Do we need to be concerned about stability of proton beams? (This would be a significant study) eSPS, 17/06/19

Choice of Cavities – SRF Requirement: 10 MV of accelerating field for 16 GeV electrons (6.7 mA average) In-line system Three to four 200 MHz SRF cavities (Considered for HL-LHC) Will require heavily damped HOMs Seen by the SPS proton beam Designed to work for the SPS proton beam at Flat Top (130 kHz frequency swing difficult for high Q) which will work for the lower current electron beam as well High power RF system which will increase the voltage available for protons and work for the lower current electrons eSPS, 17/06/19

Choice of Cavities – Parasitic Operation Requirement: 10 MV of accelerating field for 16 GeV electrons (6.7 mA average) Crab cavity style bypass N x 100 MHz… cavities Multi-cell (synergy FCC studies) or single cell Moderate damping only for electron beams Not seen by the SPS proton beam This requires a dedicated cycle which limits its availability Experience form the crab cavity bypass in LSS6 is that moving in and out of the beamline is feasible within 10 min and compatible with LHC filling eSPS, 17/06/19

Injection & Extraction Injection scheme will require kickers (1 or 2?), these need to be low impedance as broadband impedance results in a loss of Landau damping (Instabilities) Impedance optimization of kickers and BI required Extraction via septa (electric or magnetic?) Impedance needs to be minimized Any BI equipment needs optimization for impedance Additional Considerations Additional sector valves around cavities, kickers and septa will require shielding (if they are installed) Bellows connecting the new equipment will require impedance optimization Any cross-sectional changes will require tapering to minimize the impedance contribution eSPS, 17/06/19