Life Cycle Costing.

Slides:



Advertisements
Similar presentations
Getting the North Up to Speed: On Liverpool, High Speed 2… and High Speed 1.5 Professor Ian Wray University of Liverpool 18 June 2013.
Advertisements

E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
HS2 in Sheffield The impacts David Redfern. HS2 in Sheffield: the impacts The HS2 station at Meadowhall The proposed site for the new HS2 station in Sheffield.
SACN PT Sustainability GAUTRAIN 1 SACN Seminar on sustainable PT SUSTAINABLE MEGA PUBLIC TRANSPORT PROJECTS Rapid rail project in Gauteng Romano Del Mistro.
Railway Safety Plan and Its Status in Korea
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Cross London Rail Links Ltd. Crossrail the Challenge Keith Berryman 20 December 2005.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
High Speed 2 The decision and next steps Jonathan Mitchell.
Making Tracks Schools Engineering Challenge briefing.
Lesson 3: Construction. How does infrastructure affect development plans? Infrastructure can have an effect on development plans due to not being upgraded,
 A high speed rail link from London to Yorkshire  Phase 1 is from London to Birmingham  Phase 2 is to Manchester and Leeds  The Institute of Economic.
Mark Nelson, Program Manager for Statewide Planning and Data Analysis TRB International Partnership Meeting January 14, 2015.
Transport Update Chris Carter Transport Strategy Manager.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
FACS-STIP Tool – Overview (Features, Attributes & Conditions Survey – Statewide Transportation Improvement Program) April 2010 Presentation for Roadway.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
Summary and Wrap-up Discussion 8 July 2015
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
High Speed Two Ltd responsible for developing and promoting the UK’s new high speed rail network
1 Address: UIC Safety Database (SDB) System and Results.
Request For Proposals. Request for Proposals Book 1 Contract Book 2 Project Requirements Book 3 Applicable Standards Reference Information Documents (RID)
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Planning and Realisation of Wind Farms
Today´s Challenges of the Rail Infrastructure Industry
High Speed Rail Some Development Principles
Minimum Set of Requirements for Suppliers
University of Birmingham My Future World Careers for Geography & Environmental Science Transport Planning Stephen Hill.
Permanent Way.
Public Conference December
Rating Grade Separations
Minimum Set of Requirements for Suppliers
Investigation of Road Project By S.N. Nanaware
Temporary Works – P8 Project Practice.
Civil Engineering Task – Explain that civil engineering projects are:
HS2 - What tests should be applied in evaluating the final business case ? Chris Nash.
Vice President: Lin Zhonghong Economic & Planning Research Institute
Chicago Transit Authority Energy Initiatives
Construction Activity
Investigation of Road Project
5th FCC Infrastructure & Operation meeting
Transportation and Traffic Engineering Ch 1 Introduction 10/10/2017
Costs and Economics of Construction
ELECTRIC TRACTION SYSTEM
Draft Transportation Element September 6, 2017
How can integrated above-ground and underground
Maintenance Strategies for Turnouts
A future benefit for the South Cheshire infrastructure
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Pre-Contract Cost Control
MARGINAL COST PRICING TUOMO SUVANTO
North Wales Main Line - linespeed increase
Construction Management & Inspection
Historical problems Tasks being done; just not coordinated and effective. No clear line of sight to client (Highways England) objectives. No defined asset.
Partnership Working Great Western Route Modification
RAILWAYS, BRIDGES & TUNNELS
A future benefit for the South Cheshire infrastructure
Delivering East West Rail
I-70 / Kipling Corridors Conditions Survey
Network Rail - Asset Management Story & Reliability Improvements
Competency: Create site plan drawings
Introduction to transportation system
Glossary of regularly used cycling terms
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Presentation transcript:

Life Cycle Costing

Learning outcomes To identify the Life Cycle Cost considerations of mega projects (High speed rail – HS2)

HS2 objectives To connect the city centres of: London, Birmingham, Leeds and Manchester To enhance the economic development

Project details The line is in a "Y" configuration to be built in two phases Construction starts – 2017 Expected completion – 2033 (Phase 1 – 2027) Developer – HS2 Ltd (established by the UK Govt) Capacity - conveying up to 26,000 per hour @ speeds of up to 400 km/hr (250 mph) Length – 540Km (Phase 1 – 190Km) Construction cost – £32.7b (2011) however Institute of Economic Affaires noted the cost will be increased up to £80b

Route map (HS2 / Y- network)

Life cycle cost components Capital construction cost – cost of land purchases, design, materials, construction and allowance for risk Rolling stock capital costs – the purchase costs of rolling stock (trains) Operating costs – the operation and maintenance of the railway infrastructure, its trains including train crew and station staff

Infrastructure capital cost Phase 1 (£16.2b) & Full Y network (£32.7b) – including contingencies Rates were based on Spon’s Civil Engineering and Highway Works Price Book Tunnelling / bridge costs were based on Infrastructure UK cost study work

1. Capital cost components 250 cost elements were identified Cost reflects on the route section Permanent way – rail, sleepers, ballast, walkway, track drainage and high security fencing; Changes and crossings – based on number of crossings and associated line-speed; Overhead Line Equipment – overhead line equipment, support structures and power supply; Train control systems – includes all signalling and communication requirements and control centre; Stations – civil engineering works, station buildings, station facilities, track, switches, Earthworks – site clearance, earthworks, soiling, seeding and small structures for the permanent way only Retaining walls – associated earthworks, concrete, formwork, reinforcement; Structures – associated earthworks, concrete, formwork, reinforcement, pre-cast units, structural steelwork and finishing works; Tunnels – excavation, tunnel lining, cross passages (for twin-bore tunnels), shafts, plant and associated control systems. Highways – include site clearance, fencing, vehicular barriers, drainage, earthworks, pavement, kerbs, footways, signs, lighting and small structures/accommodation bridges;

1.1 Capital cost Land cost (Phase 1) - includes property, disturbance and resale values – £966m Other associated cost – varies with the construction cost

1.2 Other capital costs Environmental mitigation (urban areas or areas of known environmental significance 5% of base construction cost, in other areas 3%) Surveys (ground and topography) - allowance of £150,000 per km Rail possession / isolation / safety management - 2% of base construction cost for route sections affecting existing railway

Cost estimate (Full network)

1.3 Rolling stock (train) capital costs Two types of trains will be used to operate HS2 services. Captive size sets (Euro size) Classic-compatible sets (British mainline)

2. Renewals Recognising that the HS2 business case is evaluated over a 60 year period

3. Operations & maintenance The calculations were based on HS1 costs. At 2011 prices, an annual figure of £191,000 per km (£103.14m). Captive set maintenance - £2.97 per kilometre travelled for a 200m captive train Classic compatible set maintenance - £3.71 per kilometre travelled for a 200m set. £4.82 per kilometre travelled for a 260m Traction power (electricity grid for the supply of electrified rail networks) cost;

Further information