Project Support Meeting January 9, 2019

Slides:



Advertisements
Similar presentations
Requirements Structure and Status for NCFE
Advertisements

The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations 5 November 2014 Dave McGinnis.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
Accelerator/program Mats Lindroos Head of accelerator April 21, 2015.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang February 2016.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
Installation plans for RFQ and Superconducting linac Dave McGinnis Chief Engineer Eugene Tanke Systems Engineer March 20,
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Accelerator Systems Integration Stephen Molloy Section Leader for Accelerator Integration April, 2016.
ESS Accelerator| Construction Phase| | MC | 1 ESS Accelerator management & governance for Product Integration - Construction phase 25 January 2013.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Status of Primavera (P6) Accelerator Plan & an Introduction to the Accelerator Installation Plan Luisella Lari Head planner for Accelerator & Senior Scientist.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Linac Design Update Project WP6 - Monthly Report –
ESS Program Plan and Schedule Update
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
ESS cavity procurement via in-kind contributions
Uppsala Commitment to ESS and FREIA Planning
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
ESS RF Development at Uppsala University
Tom Shea Front End Meeting Catania
Licensing update ESHAC #9, October 2018
Advanced Research Electron Accelerator Laboratory
ESS Project Status Roland Garoby – Technical Director August 2018.
Managing Parameters Karin Rathsman
RF systems introduction
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
ESS Bilbao RF Systems Overview Pedro J. González
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Krzysztof Czuba ESS LLRF Quarterly Meeting
Risk, Schedule, Deliveries
Licensing requirements for Cryomodules
Introduction CDR Normal Conducting Linac LLRF
Testing Coordination at ESS
Licensing update TAC 18 October 2018
European Spallation Source ERIC
Spectroscopy STAP Meeting ESS, 8th of April 2019
High Level Readiness Reviews
Imaging & Engineering Diffraction STAP Meeting ESS, 21th of March 2019
Lessons from the 1st Safety Readiness Review
Accelerator NCFE Liaison Officer
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Status of the ESS High Power RF Systems
Plan for early Operation
RF introduction Anders Sunesson RF group leader
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

Project Support Meeting January 9, 2019 J.G. Weisend II www.europeanspallationsource.se

Agenda News 2019 Goals Spares Funding Around the table

News Need input for Nov / Dec Monthly Report by January 14 Tech Board Next Week – January 17 Annual Review Results Weekly slide

Results of Annual Review Thanks to all who participated in the review, The presence of the IK partners in both the poster session and in giving talks played a major role in impressing the committee with the scope of work accomplished to date. Additionally, we received a number of compliments from the committee on the quality of the talks presented by both ESS staff and IK partners. Overall, the results of the review were very positive: “Impressive progress is being made towards delivering the world’s most capable neutron science facility, with the project now 52% complete.” “The overall scope of the in-kind contributions is unprecedented and the methods developed to manage them have been remarkably successful despite the anticipated difficulties.”

Results of Annual Review The single overriding recommendation of the committee for ESS as a whole was: “The Committee believes that resources laboratory-wide should now be focussed on achieving at least the minimum criteria for a “day 1 of science” milestone. This will necessitate postponing activities which are not needed for the new focus, and reallocating resources between the key project areas (CF, Accelerator, Target, NSS).” This is clearly a lesser goal than “Start of User Program” How ESS will interpret this recommendation and apply it is under discussion. Given the nature of the accelerator, this recommendation will likely have a minimum effect on ACCSYS. The committee does recognize the challenges that ESS is facing: “This narrowing of short-term focus is especially important given the observation by all subcommittees that schedule & cost contingency are very likely to be insufficient. “

Results of Annual Review Specific Recommendations for the Accelerator subproject were: Incorporate lessons from source/LEBT commissioning into the plan for future commissioning stages. Strengthen the operation group as early as possible, and involve system experts. Organize a mechanism for smooth transfer of knowledge between the IK partners and ESS staff.

W02-2019: Accelerator Week Progress: Preparations underway for upcoming “Work Camp” on operations and staffing Completion of TS2 bunker sufficient for installation of cryodistribution line. The installation work starts this week. The Vacuum team and Procurement finished the documents for the Turbomolecular pumps and Vacuum Catalog bid process. It is planned to the published end of second week of Jan. Issues: Delay in restart of Ion source to later in January due to need to procure a replacement power supply – This illustrates the spares issue In order to address CE Marking concerns, ACCSYS proposes that CE marking becomes the long term ambition for all ESS systems and that the Quality Division is charged with the task to assure that IK partners will do the minimum required for CE marking before the end of IK contracts. Discovered an interference issue between the DTL intertank apertures and the Faraday Cups - working with Legnaro to resolve it. Held a productive meeting with ICS to review and address issues with the IOxOS platform - a path forward to the BLM CDR is emerging. In-kind: CEA visiting ESS the 11 Jan to plan for RFQ installation. CDR for LLRF NC linac, from ESS Bilbao in Lund on January 15 ESS Bilbao experiences issues with the high power RF load for klystron reconditioning Upcoming Meetings: 28th Accelerator Technical Board Meeting January 17. Visit by J. Stovall to discuss warm linac installation and operation See also action list and weekly minutes at: https://confluence.esss.lu.se/display/ACCSYS and list of weekly slides at https://confluence.esss.lu.se/pages/viewpage.action?pageId=227680319

Primary Goal: Beam through at least the RFQ by the end of 2019 Major Goals for 2019 Installation of the RFQ, MEBT and first DTL tanks in tunnel Installation of infrastructure for tunnel and RF gallery Commissioning of cryoplants completed and installation of cryo-distribution system completed Test stand 2 in Lund in operation 2 medium beta cryomodules assembled and 8 spoke cryomodules assembled NC , spoke and Medium beta RF systems installation ongoing with system operational for NC linac commissioning HEBT installation completed with magnets and beam pipe Integration of P6 Installation Plan into the P6 Live plan and infrastructure project plan in P6. Primary Goal: Beam through at least the RFQ by the end of 2019

12/3/2019 Initial Operations Spares Funding 2019-2020 ( some strategic adjustments between WPs may still be made)   2019 2020 Cryo Spares cash need: back-up compressor and oil system for ACCP 900 RF Sources Cash needs: replacements for spoke RF power stations 110 330 Klystron 352 Mhz 250 400 Critical Spare parts LLRF 17 Critical Spare parts Spoke 26 Critical Spare parts RF LPS 14 Power converters Spares cash needed: one complete spare modulator for RFQ / DTL and MB 65 194 Spares cash needed: set of spare parts for 12 modulators of RDQ/DTL and MB 21 63 Critical Spare parts for modulators 50 Spare tetrode 55 Critical Spare Magnet power supplies 11 Normal Conducting Linac Early spare for ion source test stand (partly from diagnostics /other areas) 120 Critical Spare parts for Ion Source and LEBT 85 Critical Spare parts for RFQ 33 Critical Spare parts MEBT 46 Critical Spare parts DTL 20 Utilities Critical Spare connectors and spare water HW 10 Critical Spare parts Electrical Beam Diagnostics Critical Spare parts Diagnostics 56 Vacuum Critical Spare parts Vacuum