CryoModule Calibration & Measurements Configuration Management Tools (CMCMCMT) aka CM3T because no one came up with a better name Nuno Elias, Paolo.

Slides:



Advertisements
Similar presentations
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
Advertisements

Requirements Structure and Status for NCFE
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
SRF Cryomodules November 2013 Meeting
Heat load study of cryomodule in STF
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
ESS Programme Plan and Schedule Update C. Darve, Deputy WP05 and WP04 leader Acknowledgement: N. Elias, WP05 and WP04 P. Bosland, WP05 leader
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
Cryomodule Instrumentation Darryl Orris 13 May 2015 Production CM FDR.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ESS LLRF and Beam Interaction
ESS Program Plan and Schedule Update
Status of the M-ECCTD F. Peauger - P. Bosland
Medium Beta Elliptical Cryomodule CDR Closeout
Cryomodule test stand at ESS site
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
ESS cavity procurement via in-kind contributions
T5.2: Harmonization - Material and Component Reference
Overview and System Design for ESS LLRF Systems
WG-1 Session Cavity Performance Cryomodule Performance
Documentation process in WP 4 & 5 Goal: To collect all documentation needed in a structured way for the ESS Accelerator installation, commissioning, operation.
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
Test stand preparation and EMR "live" data summaries
ESS – RF checks up to cavity operation readiness in tunnel
Cryogenic C&C Scope of work
XFEL cavities and cryomodules measurements at AMTF
SRF Frequency data flow (focus on elliptical)
SPOKE Cavities frequency preparation plan and RF control procedures
Nuno Elias, Paolo Pierini, Emilio Asensi, Inigo Alonso
SNS PPU Cryomodule Instrumentation
Prototype cryomodule development
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Licensing requirements for Cryomodules
Overall time schedule of SRF activities
Double-Spoke Cavities
Identification and marking of ESSI deliverables
The spoke CM tests at FREIA
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Tasks, Responsibilities Expectations and Needs
European Spallation Source ERIC
How Do We Define Acceptance of a Cryomodule? - A Discussion
Biasing of SRF Couplers at ESS
Status & Schedule for ESS TS2
SNS PPU Cryomodule Instrumentation
ACCSYS Collaboration Board Triestre, 3rd october 2017
Facility for Research Instrumentation and Accelerator Development
Paolo Michelato LASA - Status of cavity documentation, fabrication, inspection and NCRs Laura Monaco INFN – LASA 10° ESS SRF Collaboration Meeting, 25.
High level ESS SRF test plan
Presentation transcript:

CryoModule Calibration & Measurements Configuration Management Tools (CMCMCMT) aka CM3T because no one came up with a better name Nuno Elias, Paolo Pierini, Emilio Asensi, Inigo Alonso, Cecilia Maiano www.europeanspallationsource.se 7th November 2017, 7th SRF Collaboration Meeting, CEA

summary Requirements (unpolished) Retrieve and Store related Calibration and Measurements Data (e.g. :Cavities, Instruments, RF Cable attenuation, …) Convert data received from partners into appropriate format Cryomodules Configuration Management: Store (retrieve, version control) cryomodules instrumentation configuration Populate various controls databases with correct configuration

ESS LINAC 13 spoke cryomodules (2 double-spoke cavities) 9 elliptical medium-β cryomodules (4 medium-β elliptical cavities) 21 elliptical high-β cryomodules (4 high-β elliptical cavities)

Food Chain

CM C&M Configuration Management Tools Cavities, Tuners, cable attenuation, temperature sensors Etc.. Spokes M-beta H-beta

CM3T

Calibration and Measurements

Example of typical cavity measurement file What When Ext. What When Where1 Where2 Who 1 How Measure 1 Measure 2

Cryomodule Configuration Management

ESS Controls Configuration UU- EMR- TS2- CRYO- 010CRM: TT-10 SPK- WTRC- …... PT-10 MBL- VAC- 210CRM: . . . HBL- RFS- . . .

P&ID

Controls Architecture

Some references CM3T page: Naming convention: https://confluence.esss.lu.se/display/CRYOM/CM3T Naming convention: https://naming.esss.lu.se https://confluence.esss.lu.se/display/CRYOM/Naming+of+Cryomodule+Devices Guide for Using CCDB for configuration https://confluence.esss.lu.se/pages/viewpage.action?pageId=246449345

Measurement and Calibration Data Cavities ESS_XX### (e.g.: ESS_SPK003, ESS_MB009, ESS_HB014) (ESS_XX###_YYYYMMDD_HHMM) (different measurements information in metadata and extension: Spectrum measurement, VT characterization (inc. Calibration data), TS characterization, Field flatness measurement, HOM measurements…) CM components Spokes Temperature Sensors calibration (Cernox) : from IPNO Cold Cables attenuation measurements: From UU, Stepper motor (tuning-parking measurements): From UU, Piezo stack data MediumB Temperature Sensors calibration (Cernox) : from CEA (ipno) Cold Cables attenuation measurements: From CEA, From TS2 Stepper motor (tuning-parking measurements): From CEA, from TS2 Outgoing/incoming report (Electrical continuity measurement, TT resistance measurement, piezo capacitance, Beam vacuum (static) HighB (same as MediumB)

Requests to IK at 7-SRF-collab Cavities LASA Story of the prototype cavities (Spectrum measurement, VT characterization, Field flatness, HOM measurements, other) CEA IPNO Cryomodule Components Temperature Sensors Calibration (M-ECCTD) Cryomodule Configuration file (M-ECCTD)