DS20k Integration Workshop

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
TRANSPORT of ICARUS from LNGS to CERN Alberto Scaramelli INFN-Milano Following the meeting at LNGS on 11-12/9 Last News 102/10/2014A. Scaramelli.
CERN LBNE Test Experiment. Plan view of Bat
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
Long-Baseline Neutrino Facility LBNF Summary of FSCF Final Design Parameters Meeting at SURF, 10 Aug 2015 Elaine McCluskey, LBNF Project Manager EFIG 19.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Outstanding Issues on Infrastructure and Development Fraser Duncan SNOLAB/Queen’s University 4 th SNOLAB Workshop 15 August 2005.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
The integration of 420 m detectors into the LHC
Installation of the T600 at Fermilab CSN2, September 22,
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
5/13/11 FCPA Mini-RetreatDarkSide - S.Pordes1 DarkSide 10 kg Prototype at Princeton Distillation Column for Depleted Argon at Fermilab DarkSide 50 at Gran.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
Installation of the T600 at Fermilab Fermilab, February 15,
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Installation of the T600 at Fermilab
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LBNF CAD models, Drawings and Component list
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Equipment simplified model SMR UR safety
FCC Cryo-magnet Logistics
INSTALLATION SEQUENCE
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
Hollow e- lens, Cryogenic aspects
Warm structure requirements :
Accelerator and Experiment Interface Session: LS2, LS3
NP04 CPA/FC/HV Interfaces
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
EHN1 Neutrino Installation Plans
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Test box for ProtoDUNE SP – Integration Test
Integration and IR Hall
Extract from today’s talk given to DCB
RDR Baseline Layouts for Interaction Region
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
IR Beam Transport Status
Presentation transcript:

DS20k Integration Workshop CERN – 06/05/2019

Workshop Goals Clarify and size all constraints related to the construction/installation of the DS20k experiment Advance on the detector design: TPC Veto Cryostat/Roof interface Agree upon TPC assembly and test: Location Test dewar use Lay out an installation procedure that takes into account all of the above.

Challenges Few constraints that need to be tackled, as they impact all subsystems and installation Seismics (Olga/Alberto ‘s slides) Cryostat location, in relation to cryogenic installation Cryogenics requirements TPC Radon – free environment Roof occupancy

Seismic The seismic parameters have been proposed and agreed with Gran Sasso autorities and Politec. Milano. The seismic spectra have been calculated: for personnel and equipment safety for the cryostat and the infrastructure for installation and for operation periods We are waiting a feedback from the Italian authorities. We are assessing the cryostat design (using these spectra) via different methods : - EN 1998 - Eurocode 8 (done) - Seismic Response Spectrum (on going) - Dynamic Response Analysis We will check the eigen-frequencies of the DarkSide cryostat using NP04 and NP02 cryostat by determining experimentally their modal response. From these analysis we will provide to the sub systems: the frequency range to respect for their design the expected seismic acceleration at their basis.

Cryogenics and Cryostat Marco Carlini started exercise of integrating cryogenics, cryostat and services building in Hall C. Follow up depends heavily on the presence of the test dewar in the hall, the UAr storage solution the final solution for cryogenics Cryogenics: ProtoDUNE cryo plant can still be adjusted to Hall C geometry and the DS20k requirements (Hanguo’s document). Interaction between Marco and CERN Cryo group will optimize this solution. Interfaces with TPC/VETO Insertion/extraction of UAr through Veto structure Insertion/extraction of AAr – good circulation through Veto structure

Radon-free environement The services building is going to be equipped with filtering for radon. The cryostat must be equipped in the same way, if we want to protect installation (of the veto especially). T0 for this requirement: as soon as cryostat can accept detector parts? We have 4 man-holes. We can use one for filtering. The other ones must be protected while allowing personnel access and easy extraction (especially after Top-Cap is in place – confined space) All penetrations must be protected as well, before they are closed. Overall roof protection is probably preferable. Opening for crane operations must be foreseen.

TPC TPC Assembly: WHERE? (LNGS or Canada) Test dewar: WHERE? (Outer Lab or Hall C) Outer lab PROs: Easier to equip a multi-purpose set-up. Can receive lab support if it is made available for other experiments after DS20k is done. More space available for Cryo/Electronics in Hall C. Avoid sequential activities in the Hall C. More schedule flexibility. Outer lab CONs: Must find a dedicated building to set up a clean room with radon filtering. Must set-up dedicated cryogenics. TPC must travel, assembled, to the underground lab. Assembled TPC transport to Hall C was discussed in January at LNGS. Delicate but feasible.

TPC/2 Uses of test dewar: Annealing Clevios/TPB coating TPC Assembly (with Photon detectors) TPC test (in LAr) Mechanical stability HV stability TPC operation (full drift) TPC Hanging structure: Should be the same for test and final operation. Must be integrated in the dewar design.

Roof

Roof/2 Veto penetrations are still missing in the drawing (read-out/support) Support for the veto must be defined (among the goals of this workshop), but it is preferred to have it on the roof. An added support structure for this has been discussed. Roof occupation is quite significant. From the point of view of Electronics racks placement, this must be taken into account. We suggest to minimize occupation on the roof. It was suggested to add a platform extending outside the roof: feasible over Sabre? seismic? Same as cryostat, since the structures are linked.

Cryostat To be defined: Final position, as a function of: Assembly procedure Cryo installation TPC insertion Use of moving crane? Time and space available for: Construction warm structure Construction cold structure (Insulation+membrane, Gabadi) Construction external access structure (to access the cryostat from above, after walls are in place) <--> Services building TPC insertion: Space and limitations With (or without) Top-Cap

Hall C occupation To be decided position of: Electronics racks Cryo installation Power network Slow control racks Interaction with other experiments should be clear from the beginning. Interaction with Sabre. Use of platform above it? Time limitations? Other cranes users? Borexino?

DS-Proto Proto design should mimic DS20k as much as possible. Goal: rescaling the design directly from 20k to Proto. What can be rescaled without modifications? What can/should be adjusted for Proto operation Cryo system: the same for Proto and DS20k, or two identical but separated versions? One is preferable (tested), provided it can be moved/transported.