LHC coordination meeting 12th December 2017 LHC-YETS 2017/18 Coordination meeting #15 12th December, 2017 AGENDA: Evolutions of IMPACT tool – Eloy Fuentes Reminder on Electrical Lockout –Jerome Panigoni YETS planning follow-up Marta Alcaide Leon, Maria Barberan, Marzia Bernardini, Sebastien Bustamante LHC coordination meeting 12th December 2017
YETS 2017-2018: general informations LHC-YETS: from Monday 4th December @ 6am, to Friday 9th March (activities completed, except S. 1-2) Powering tests ph.1 starts on Saturday 3rd March (outside normal working hours) LHC back to BE-OP on Friday 9th March IMPACT: intervention period YETS-LHC-2017-18 Phone ‘piquet’: 161669 – from Monday 4th December Out of working hours contact TI - 72201 OSS website (planning, constraints, …): https://espace.cern.ch/en-dep-mef-lpc/YETS2017-18/SitePages/Home.aspx INDICO: https://indico.cern.ch/category/9286/ Access during AUG test is according to a list people who wants to access IN SURFACE need to be declared, NO access underground except EN-EL and EN-CV Dead line for AUG P2 on Mon 18th of December Dead line for AUG P1 on Thu 21st of December LHC coordination meeting 12th December 2017
YETS 2017-2018: general informations From 4th March: machine patrolled and in restricted mode Exception: Sector 1-2 CLOSED from 12th December to 3rd January warm up 80/100-300K CLOSED from 22nd January to 13th February cool-down 300-80/100K During the 2 wks of Xmas closure: TI controls the machine Access surface in restricted mode (access with key and from the CCC) Locks out requests via IMPACT Unlock out W10 (5th March – 9th March) LHC coordination meeting 12th December 2017
LHC-YETS 2017-2018 - Version 4 Approved AUG TEST Point Day LHC1 + ATLAS 5th January (W1) BA1 22nd January (W4) LHC18 + SM18 11th January (W2) BA2 31th January (W5) LHC2 + ALICE 20th December (W51) BA3 2nd February (W5) LHC3 + PM32 17th January (W3) BA4 + CNGS 8th February (W6) LHC4 16th January (W3) BA5 12th February (W7) LHC5 + CMS 23rd January (W4) – 24th January (W4) BA6 15th January 5h00-10h00 LHC6 1st February (W5) BA7 14th February (W7) LHC7 5th February (W6) LHC8 18th January (W3) PS Complex 13th and 14th January (W2) Prevessin 17th February (W6) BA80 5th March (W10) Meyrin + Adm. 6th January (W1) BA81 6th March (W10) Meyrin W. + ISR 3rd February (W5) BA82 + 85 7th March (W10) To be confirmed TEST SECOURS (10min) AUTO TRANSFERT TEST All points on 9th January (6am – 6:10am) (W2) No access in LHC1, LHC18, BA6 & BA7, PS Complex on 27th and 28th January (Saturday & Sunday) (W4) LHC coordination meeting 12th December 2017
LHC-YETS 2017-2018 main activities – Version 3 CV Maintenance Point Weeks Start Finish LHC1 50-51–52-1-2 11th December 12th January LHC18 3 15th January 19th January LHC2 6-7-8* (cut of cryogenics cooling) 5th February 23th February LHC3 9 26th February 2nd March LHC4 2-3-4-5*(cut of cryogenics cooling) 8th January 26th January LHC5 49-50–51–52-1 LHC6 6-7-8 23rd February LHC7 LHC8 3-4-5 (cut of cryogenics cooling) 2nd February * maintenance reduced to the minimum Cryo Maintenance (+ Reconfiguration) Point Weeks Start Finish LHC18 2-3-4 2-3 8th January 19th January LHC2 7-8 12th February 23rd February LHC4 A & B 2-3-(4) 5-6-(7) 16th February LHC6 A & B LHC8 A & B LHC coordination meeting 12th December 2017
LHC-YETS: constraints (s.1-2 and s.2-3) LHC coordination meeting 12th December 2017
LHC-YETS: constraints (s.3-4 and s.4-5) LHC coordination meeting 12th December 2017
Activities in Point 4 PR 711 in UX45 refurbishment from 4th Dec to 31st January (Including during Xmas closure) UX 45 RF Powering Tests from 5th to 16th February RF Cryo filling from 17th to 19th February NO ACCESS in LSS4 RF DSO Test on 20th February NO ACCESS P4 RF Reconditioning from 21st February NO ACCESS in LSS4 Courtesy of Helder Miguel Velez Lourenco LHC coordination meeting 12th December 2017
LHC-YETS: constraints (s.5-6 and s.6-7) During the PLC Diesel replacement: access only during normal working hours 8h00 – 17h00 LHC coordination meeting 12th December 2017
LHC-YETS: constraints (s.7-8 and s.8-1) Due to the issue in sector 81 the Cable campaign Arc8-1 have to be extended until ….? Cable campaign (drum storage) - VIP LHC coordination meeting 12th December 2017
Point 8 - PM85 lift replacement: From 16th Decembre to 23rd February Access of people (only ) through PZ85 – LHCb Material transport with dedicated containers Urgent issues contact S. Pelletier (163380) LHC coordination meeting 12th December 2017
Safety aspects for activities Activity Group & Work site supervisor Location Status Activities in UD62 & 68 EN-STI Damien Grenier UD62 & UD68 Follow up Cabling & Fibre EN-EL-FC Gael Girardot Antonio Gonzales All Fiber activity - RA43 AFP VIC to be organised P4 – Wed 6th Dec P1 – Tue 5th Dec N2 pipe installation for the TDE 62 & 68 EN-EA – David Jaillet Point 6 VIC on 7th Dec PR 711 refurbishment activities EN-HE Helder Lourenco UX451 Additional VIC requested on Wed. 6th Dec. PM85 Lift replacement and exclusion zone underground EN-HE Damien Lafarge Point 8 MKI8D replacement TE-ABT Francesco Castronuovo LSS8R VIC on 11th Dec WCC works after inspections (TBC) EN-EL Alain Jacob Scaffolding installation in LSS1L EN-EA Gianluca Canale LSS1 VIC 5th Dec Cable pulling in Ti2 (PMi2) EN-EL Gael Girardot Ti2/PMi2 VIC on 29th Nov ? Visite de preparation des chantiers dans les zones services? EN-EL Yann Maurer US15, US85, US65, US25, UA47, UX45 VIC? LHC coordination meeting 12th December 2017
Lockout requests – Approved updated on Monday 11th December @15h00 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Lockout requests – Approved updated on Monday 11th December @15h00 Lockout requests – Under approval updated on Monday 11th December @17h30 LHC coordination meeting 12th December 2017
Work Frame Authorisation updated on Monday 11th December @15h00 Departement Group/Section Intervention Status BE BE-BI BGV Installation of BGV detector BE-BI-BL Activities BGI Cameras; BLM Installation and Maintenance; BWS Servicing BE-BI-PI Activities BCTDC Maintenance BE-BI-PM Activities BRAN Maintenance; BTV Electronics; BSRT Service BE-BI-QP Activities BPM Collimator Connection; BPM Test; Tune Test; WCT Installation BE-CO-FE WorldFIP Repair of connection faults in WorldFIP TAP boxes or repeaters BE-OP Patrol Patrol of the access control system (*includes IT areas) DGS DGS-RP RAMSES Servicing of radiation monitors EN EN-ACE-SU Access to QRL side for alignement and measurement Under Aproval EN-EL-FC Pose de cables dans Arc avec un touret New EN-EL-OP Piquet Service EN-HE-HH Lifting heavy loads to TD62, TD68 EN-MEF-MM Radiographie Industrielle TE TE-ABT-FPS Work on MKI TE-CRG-OA TE-MSC-SCD Cabling activities TE-VSC-IV Interventions on insulation vacuum LHC coordination meeting 12th December 2017
Exceptional : Work Frame Authorisation updated on Monday 11th December @15h00 Section EDMS Purpose Status LHCB 1871085 Maintenance of LHCb Forward Shower Counters Released EN-EA-CT 1871373 Installation echafaudage en UJ13 et 14 EN-ACE-SU 1875205 Access to IT areas HSE-RP-AC 1876294 HSE-RP-AS Survey in IT areas EN-EL-CF 1882198 Installation of optical fibres in Point 4 and Point 1 BE-ICS-AS 1879166 Maintenance des systèmes de sécurité en IT LHC coordination meeting 12th December 2017
YETS 2017-2018: Broken line (11th December @4pm) LHC coordination meeting 12th December 2017
Issues encountered during W49 Raw water pipe damaged during the drilling in Sector 8-1 Machine closed for some hours, on Wednesday 6th December Repair completed Civil engineering activities will be completed on Friday 15th December Many thanks for your collaboration and understanding!!! LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Point 1 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Sector 1-2 Under discussion: tomographies Tuesday 9th January from 6pm LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS1R LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Point 18 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Arc 1-2 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS2L LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Point 2 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS2R LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Arc 2-3, LSS3L & Point 3 LHC coordination meeting 12th December 2017
Sector 3-4, Point 3.2, LSS3R & Arc3-4 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS4L LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Point 4 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS4R & Arc4-5 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS5L LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Point 5 LHC coordination meeting 12th December 2017
LHC-YETS: TIM maintenance Point 5 W50 - 2017: TIM maintenance on TIM2 and TIM3 W50- 2017: Wagon exchange onTIM3 + tests (after 17h) TIM2 is actually in Point 2 and must be moved to Point 5 for maintenance TIM2 will be moved from P2 to P3, P3 to P4, P4 to P5 during evenings @ 18h (1 sector / evenings) It is requested to keep the monorails free from any objects/cables that could interfere with TIM displacement Courtesy: Maria Laura Baiguera Tambutti Courtesy: Maria Laura Baiguera Tambutti LHC coordination meeting 28th November 2017
LHC-YETS: TIM operations – RP Surveys LSS 3 and LSS 7 W2 -8th of January 2018: LSS3 and LSS7 RP survey with TIM TIM2 will be stored in P3 during X-Mas break TIM2 will be moved from P5 to P3 during W51 in the evenings TIM3 will be stored in P7 during X-Mas break TIM3 will be moved from P5 to P7 during W51 in the evenings Monrail in P3 and P7 must be electrically unlocked to allow TIM charging It is requested to keep the monorails free from any objects/cables that could interfere with TIM displacement Courtesy: Maria Laura Baiguera Tambutti LHC coordination meeting 28th November 2017
LHC coordination meeting 12th December 2017 LSS5R LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Arc 5-6 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS6L LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Point 6 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS6R LHC coordination meeting 12th December 2017
Arc6-7 - LSS7L – Point 7 – LSS7R – Arc 7-8 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS8L LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Point 8 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS8R LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Arc 8 -1 LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 LSS1L LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 YETS 2017-2018: open points Sector 12 X-Ray/tomographies 9th Tuesday from 6pm Following the gaz analysis during the warm up: definition of action plan Pt100 sensors & cables replacement on DFBX Sector 1-2 Replacement on DFBX in sector 1-2 during W2 Related ELQA tests during already scheduled campaign Sector 8-1: under discussion LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 YETS 2017-2018: open points Request from TE-EPC: upgrade of the SVC Control System in LHC PA6 Project background: Installation and commissioning of a new control crate for the Static Var Compensator in LHC PA6. The existing control system is from 1988, and has become obsolete. LHC PA6 is the prototype installation. Once the new control crate is validated there, we will apply it for all our SVCs. Description of our request: We need to ask EN-EL to switch off the main 66 kV transformer in LHC PA6 for 1 or 2 days This requires the transfer of the load in PA6 to the LHC 18 kV General Services Loop (switch-over and switch-back of the load) Transient disturbances possible during these two periods. Main impact on the following groups: EN-EL, EN-CV, TE-CRG, Others LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 YETS 2017-2018: open points Request from TE-EPC: upgrade of the SVC Control System in LHC PA6 Planning: At the latest, we need to commission the new system in the second half of January 2018. Possible dates for the switch-over on PA6 for TE-EPC: December 2017 Week 2/2018 or Week 3/2018 (latest date 20.1.2018) Maybe we can find a way to do the switch-over / switch-back manoeuvre during AUG tests which would disturb the LHC load anyway? Outlook: Pre-commissioning in Week 4/2018 Powering tests in Week 5 or 6/2018. During the powering tests, some smaller disturbances are possible in the 18 kV network in PA6 Coordination with the users in PA6 are also required to find the best slot for the powering tests. LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Agenda next meetings Week 51 – 19th December YETS planning & access constraints – OSS team LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Spare slides LHC coordination meeting 12th December 2017
LHC coordination meeting 12th December 2017 Major changes during YETS 2017-18 ECRs – status on 27th Nov.2017 Document Title Author Document type Status LHC-MW-EC-0002 Radiation Shielding Installation and Possible Optics Change for the MBW and MQW Magnets in IR 3 and 7 of the LHC. Second phase LS2 LS3 and HL-LHC P. Fessia P. A. Thonet E. Skordis ECR Released LHC-HHAAS-SYP-0003 Mitigation Measures during the PM85 Lift Replacement Damien Lafarge Safety Plans Procedure In work LHC-LJ-EC-0045 Installation of a Heavy Load Lifting Platform in USC55 Michal Czech LHC-HHAAS-EC-0007 LHC Lifts Replacement Damien LAFARGE LHC-TC-EC-0009 Installation of Two Wire Collimators in IP1 for Long Range Beam-Beam Compensation Adriana Rossi LHC-TC-EC-0010 Replacement of one Primary Crystal Collimator (TCPC) in IR7 Inigo Lamas, Stefano Redaelli Approved by LMC LHC-V-EC-0006 v.0.1 Modification of the Nitrogen Injection Line for LHC TDE in UD62 and UD68 Eric Page Cancelled LHC-LJ-EC-0046 Relocation of Cables, Optical Fibres and Services for Connection of HL-LHC UPRs to LHC Stefano Bertolasi LHC-MKI-EC-0003 Exchange of LHC Kicker Magnet MKI8D Michael Barnes LHC-V-EC-0007 v.0.1 Removal of solenoids and installation of aC coated RF insert at the extremities of Q5R2 LHC-XAFP-EC-0004 Maintenance of AFP Detector M.Rijssenbeek LHC-G-EC-0003 Longitudinal Monitoring System Cryostats on Low Beta Triplet 5L and 5R Andreas Herty LHC-G-EC-0004 Modification of Wire protection Support on DFBX LHC-G-EC-0006 Longitudianl Cryostat Monitoring System on Low Beta Triplets 1L, 1R, 2L, 2R, 8L and 8R LHC-G-EC-0007 Additional GGPSO Points for the HL-LHC Project Mathieu Duquenne LHC-G-EC-0008 Installation of Additional GIMSA on Q2 and Q3 Cryostat LHC-V-EC-0008 Modification of Beam Vacuum Instrumentation in the Arc 1-2 Giuseppe Bregliozzi LHC-TDE-EC-0003 Nitrogen Pipeline to the Beam-Dump Gallerie Mats Wilhelmsson Under approval LHC-BGC-EC-0001 Fluorescence Measurement Test Chamber Installation Gerhard Schneider LHC-XRP-EC-0013 Electronic Components for Timing Detectors in Roman Pots of TOTEM & CT-PPS Joachim Baechler Released (EYETS) LHC-XRP-EC-0014 CT-PPS Timing Detector installation in cylindrical Roman Pot LHC-BRAN-EC-0001 BRAN_C Prototype for IP1 of the LHC Sune Jakobsen *HL-LHC Received from Anne Laure: “RF bridge in 6R8”, from VSC LHC coordination meeting 12th December 2017