dzprc 负压隔离器 Negative pressure isolator suzhou dzprc tech Co., Ltd.

Slides:



Advertisements
Similar presentations
Supplementary Training modules on Good Manufacturing Practices
Advertisements

Supplementary Training Modules on Good Manufacturing Practice
© All rights reserved by Fette GmbH, also in case of pending patens. All uses, e.g. like copying or disclosure to third parties, strictly restricted to.
Radiopharmaceutical Production
Good Manufacturing Practices
© WHO – PSM Quality Control Laboratory Pharmaceutical Quality, Good manufacturing Practice & Bioequivalence Kiev, Ukraine October 2005 Maija Hietava.
WHO - PSM Water –part 3 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija Hietava M.Sci.Pharm Quality Assurance.
Key HVAC Design Concepts. Agenda Discuss relevance of thermal enclosure system to HVAC system. Present the three major steps to design an HVAC system.
World Health Organization
1 Utility Systems Process Systems – ‘Direct Impact Systems’ Contact the Product Contact Materials that will Ultimately Become Part of the Product Could.
Heating Ventilation and Air Conditioning (HVAC) – Part 3
EQUIPMENT VALIDATION.
Good Manufacturing Practices Guilin, PRC Dr AJ van Zyl for Quality Assurance and Safety: Medicines Medicines Policy and Standards Health Technology and.
Prepared by Farid Khalaf.  Protect the worker.  Protect the sample being analyzed.  Protect the environment.
A Seminar on 1.  Validation vs Qualification  Why to validate?  Who should do Equipment Validation?  Parts of Equipment Validation  Validation of.
Hydraulics.
Supplementary Training Modules on Good Manufacturing Practice
Quality Assurance/Quality Control Policy
Pharmaceutical Water Systems Alain Kupferman Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009.
Qualification of HVAC systems
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
A Seminar on 1.  Why to validate?  Parts of Equipment Validation  Who should do Equipment Validation?  Equipment qualification  Typical process flow.
1. Footer Date CPP OWS and Filters Chicago Pneumatic People. Passion. Performance.
World Health Organization
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Basic Principles of GMP
Part 3: Design, qualification
Settings & Adjustments. Settings & Adjustments.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
World Health Organization
Module 1, Part 3: Process validation Slide 1 of 22 © WHO – EDM – 12/2001 Validation Part 3: Process validation Supplementary Training Modules on Good Manufacturing.
Good Manufacturing Practices Dar Es Salaam, Tanzania August 2006 Dr AJ van Zyl for Quality Assurance and Safety: Medicines Medicines Policy and Standards.
Module 1,, Part 5: Review and summary Slide 1 of 13 © WHO – EDM Validation Part 5: Review and summary Supplementary Training Modules on Good Manufacturing.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
VALIDATIONS: TOWARDS RELAIBLE QUALITY OUTCOMES DR. SHIVPRAKASH MANAGING DIRECTOR SYNCHRON RESEARCH SERVICES PVT. LTD., INDIA.
Validation Validation: A systematic study which ensures that systems, facilities and processes are working adequetly and precisely. Validation is an integral.
Module 4Slide 1 of 23 WHO - EDM Validation Basic Principles of GMP.
Module 3Slide 1 of 26 WHO - EDM Sanitation and Hygiene Basic Principles of GMP.
AIQ Analytical Instrument Qualification. AIQ – Analytical Instrument Qualification Varian, Inc.’s Analytical Instrument Qualification documentation has.
Balances The balance is an instrument which measures the mass of a body or substance using the gravity force which acts on that body At present, there.
L/O/G/O Chuanyi Water Treatment Equipment. Content company honor company description product catalogue quality services
Easy FlowTM and Smart FlowTM
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
FLEXIBILITY = Tecniplast is ready and willing to satisfy all the customers needs and provide the right solution for a professional outcome STAND ALONE.
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
Sigma Rotary Screw Compressors
800 Series The IWT entry level Rackwasher Cristian Clerici – IWT Product Manager.
Founded in 1993 in Ankara, TEKNOMAR LTD undertakes design, R&D and production in eight different product groups boasting advanced technology. With its.
Desert Cooler.
Wet / Dry Vacuums.
World Health Organization
Liquid LVs propellant consumption control terminal system
Water for Pharmaceutical Use
QUALITY ASSURANCE AND QUALITY CONTROL IN GENERICS
Date of download: 10/22/2017 Copyright © ASME. All rights reserved.
Autotest – Calibrated Leak
Date of download: 12/22/2017 Copyright © ASME. All rights reserved.
High Efficient Pulse Jet Valve Manufactured by maniks
Application Operation principle Advantages Highlights Comparison
Emergency Electrical Power Supply for Buildings
Cashew Dryer User Manual
ולידציה מול כיול-השונה והדומה
יוסי שדמתי רק איכות מניהול סיכונים לאימות ותיקוף תהליכי הרכבה From Risk Management to Processes Validation יוסי.
Supplying the critical industry’s
Presentation transcript:

dzprc 负压隔离器 Negative pressure isolator suzhou dzprc tech Co., Ltd.

产品图 product map Weighing and loading Charging and loading Feeding cans Mobile isolation Stepping isolation Dryer isolation

产品标准 product standard

设备介绍1 product presentation1 HMI MANOMETER air exhaust FAN Air intake HEPA air exhaust HEPA materials and supplies pass box water pistol operation rim A drain Feeding rim

设备介绍 2 product presentation 2 air exhaust air intake lifter Electric valve IBC TANK Continuous bag charge point valve Shock feeding charge point valve IBC TANK

negative pressure airflow+HEPA 设备原理 principle Principle and application of equipment: 1、The equipment adopts a sealed operation mode, enclosed box, airtight door, negative pressure airflow and other ways to ensure the isolation effect of the internal and external equipment. isolation Closed box airtight door negative pressure airflow+HEPA

参数 parameter 箱体材料:316L 不锈钢 Box Material: 316L Stainless Steel Pressure holding differential: greater than - 80 pa 电压:380v 50-60Hz Voltage: 380V 50-60Hz 高效过滤器 H13 high efficiency particulate air (HEPA) filter H13 系统负压维持阶段工作噪声<65dB(A) Noise < 65dB(A) in the negative pressure maintenance stage of the system 舱体密闭性:符合ISO10648-2标准要求 Compliance with ISO 10648-2

配件说明 Accessories description 1、箱体 Box body 舱体材料:SUS316L不锈钢 Cabin Material: SUS316L Stainless Steel 3、门采用气囊密封Airbag seal 2:门采用钢化玻璃 Door: toughened glass

4、高效过滤器 HEPA 4.1采用康斐尔品牌 法国进口 Import from France with Comfil Brand, 4.2 过滤效率H13 Filtration efficiency H13 4.3保障工作区洁净度和排气洁净度 Ensure internal cleanliness and exhaust cleanliness 4.4作为耗材部分,采用更换简单的结构安装和拆卸 As consumables, install and disassemble with simple replacement structure 5、采用超细玻璃纤维纸作滤料 Using Ultrafine Glass Fiber Paper as Filter Material

5、手套 glove 采用美国皮尔康品牌 Pilcon, USA

6.清洗工具 6.Cleaning tool

7、物料传递方式 Material transfer mode 1、连续袋子传递物料和器具 Continuous Bag Transfer Materials and Tools

7、物料传递方式 Material transfer mode 2 αβ阀转运物料 Alpha Beta Valve Transfer Material

控制系统Control system

用户管理 user management

系统画面 System picture

Equipment service DQ confirmation is to verify the performance, material, structure, accessories, control and instrumentation of the equipment according to the customer's requirements and production process, and to verify the rationality and reliability of the product in the design process. FAT validation is to prove the reliability of the product quality of the equipment before it is packed and delivered through a series of experimental tests in the manufacturing plant, and to prove that the equipment can meet the basic requirements of design validation, product factory standard and national GMP requirements. IQ confirmation is to provide a series of test data through site installation, debugging and verification activities to prove that the installation documents, installation conditions and installation results of the products meet the design requirements, and that the data and documents meet the GMP management requirements. OQ confirmation: First, check the inspection report of the product provided by the verifier, check and test the technical parameters of the equipment, confirm that the performance of the product meets the design requirements and meets the relevant requirements of GMP. Purpose of PQ confirmation: On the basis of installation confirmation and operation confirmation, according to the specific production process of the manufacturer, the corresponding test products are added to carry out the test, confirming that the operation performance of the equipment meets the design requirements and the relevant requirements of the new version of GMP,FDA.

Thanks!