HEP System Managers Meeting, UCL.

Slides:



Advertisements
Similar presentations
NNW Manchester St Pancras EastNet Cambridge EastNet Cambridge Warrington C-PoP 10G ULCC Amsterdam 10G Chicago 10G Leeds C-PoP Leeds C-PoP EastMAN Edinburgh.
Advertisements

ICFA SCIC Meeting CERN Dec 01 R. Hughes-Jones Manchester Network Connectivity and Projects – a Perspective from the UK Richard Hughes-Jones PPNCG SuperJANET4.
DOE User Facilities. What happens when something fails? User contacts someone they know Solved my last problem User contacts local support staff Part.
BGP route propagation between neighboring domains Renata Teixeira Laboratoire LIP6 – CNRS University Pierre et Marie Curie – Paris 6 with Steve Uhlig (Delft.
March 2001 SuperJANET4 & International Connectivity Rina Samani UKERNA.
Networking Issues David Salmon UKERNA/GNT
Trial of the Infinera PXM Guy Roberts, Mian Usman.
CAIDA Bandwidth Estimation Meeting San Diego June 2002 R. Hughes-Jones Manchester 1 EU DataGrid - Network Monitoring Richard Hughes-Jones, University of.
Astronomy Sysman Meeting 29/30 April 02 R. Hughes-Jones Manchester 1 Introduction to the PPNCG Networking for the PPARC Community  Introduction to the.
ICFA Networking Task Force Workshop at CERN March 1998 “Key updates since September 1997” in Hungary Piroska Giese KFKI-RMKI.
EDG WP7 Networking Demonstration uDemonstration sending HEP data CERN to SARA Multiple streams of TCP packets Tuned TCP parameters: ifconfig eth0 txqueuelen.
Routing Measurements Matt Zekauskas, ITF Meeting 2006-Apr-24.
27 th of SeptemberAgnes PouelePage 1 MPLS Next Generation Networking September 2000 TF-TANT MPLS TESTING.
Connect. Communicate. Collaborate Place your organisation logo in this area End-to-End Coordination Unit Toby Rodwell, Network Engineer, DANTE TNLC, 28.
R. Hughes-Jones Advanced Networks Workshop Montreal November 2000 Networking for the Particle Physics Community - a UK Perspective uIntroduction to the.
R. Hughes-Jones ESnet Meeting Kyoto July 2000 Networking for HEP in the UK uIntroduction to the PPNCG uNetwork Topologies uMonitoring Activities uPeering.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
CERN IT Department CH-1211 Genève 23 Switzerland t Service Management GLM 15 November 2010 Mats Moller IT-DI-SM.
UK-T1-RAL LHCONE Workshop Robin Tasker 10 February 2014.
Comparison of NREN Service Level Agreements Life Cycle and Portfolio Management Workshop Terena, 23/11/05 Ann Harding HEAnet Network Operations Manager.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
WebEx Cloud Connected Audio Enterprise
Use cases Navigation Problem notification Problem analysis.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
ICFA SCIC Meeting CERN 28 Sep 02 R. Hughes-Jones Manchester Networking from the UK Richard Hughes-Jones PPNCG.
GridPP Collaboration Meeting Nov 2001 R. Hughes-Jones Manchester Network Monitoring and GridPP Richard Hughes-Jones, University of Manchester 6 November.
US –Japan N+N 1 The Grid and the Network The UK Network Infrastructure A summary of E-Science supported Network projects in the UK Protocols Middleware.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
Connect. Communicate. Collaborate perfSONAR MDM Service for LHC OPN Loukik Kudarimoti DANTE.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2004 Network Layer: 19.1 Internetworks 19.2 Addressing Classful, Classless addressing, NAT 19.3 Routing.
Introduction & Vision. Introduction MANTICORE provides a software implementation and tools for providing and managing routers and IP networks as services.
GridPP 11 th Collaboration Meeting Networking: Current Status Robin Tasker 14 September 2004.
HEPiX IPv6 Group David Kelsey (STFC-RAL, UK) 8 Dec 2010 GDB, CERN david.kelsey at stfc.ac.uk.
Connect communicate collaborate Design and Set Up of the New GÉANT NOC Toby Rodwell, DANTE TNC09, 9 June 2009.
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
Partner Logo A Tier1 Centre at RAL and more John Gordon eScience Centre CLRC-RAL HEPiX/HEPNT - Catania 19th April 2002.
Networks ∙ Services ∙ People Mian Usman LHCOPN/ONE meeting – Amsterdam Status update LHCONE L3VPN 28 th – 29 th Oct 2015.
Internet Connectivity and Performance for the HEP Community. Presented at HEPNT-HEPiX, October 6, 1999 by Warren Matthews Funded by DOE/MICS Internet End-to-end.
Performance analysis extracts from GridPP OC metrics report For UKI operations meeting 15 th June 2005.
Spring 2004 Internet2 Member Meeting NLR Service Center Update Dave Jent Indiana University.
A UK Computing Facility John Gordon RAL October ‘99HEPiX Fall ‘99 Data Size Event Rate 10 9 events/year Storage Requirements (real & simulated data)
LHCOPN operational model - 4 use-cases Guillaume Cessieux (FR-CCIN2P3 / EGEE networking support) on behalf of the Ops WG LHCOPN meeting, , Berlin.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN operations Presentation and training.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN operations Presentation and training.
David Foster, CERN LHC T0-T1 Meeting, Seattle, November November Meeting David Foster SEATTLE.
1 IEPM / PingER project & PPDG Les Cottrell – SLAC Presented at the NGI workshop, Berkeley, 7/21/99 Partially funded by DOE/MICS Field Work Proposal on.
COR1000 Telecoms Project UK Link Committee Update May 2013.
LHC-OPN operations Roberto Sabatino LHC T0/T1 networking meeting Amsterdam, 31 January 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ENOC status LHC-OPN meeting – ,
Marcel Stanitzki Rutherford Appleton Laboratory
T0-T1 Networking Meeting 16th June Meeting
LHC[OPN/ONE]  IPv6  status
LHCOPN/LHCONE status report pre-GDB on Networking CERN, Switzerland 10th January 2017
Measurement team Hans Ludwing Reyes Chávez Network Operation Center
2nd Asia Tier Centre Forum Summary report 4th April 2017 edoardo
LHCOPN update Brookhaven, 4th of April 2017
1 VO User Team Alarm Total ALICE ATLAS CMS
LHCONE L3VPN Status update Mian Usman LHCOPN-LHCONE meeting
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
KISTI Daejeon, 23rd September 2015
K. Schauerhammer, K. Ullmann (DFN)
Alerting/Notifications (MadAlert)
LCG Operations Centres
Thanks to everyone for attending!!
DataTAG Project update
Wide Area Networking at SLAC, Feb ‘03
Porting Process : Austria
Advanced Networking Collaborations at SLAC
Notifying the Enterprise about Outages
Wide-Area Networking at SLAC
Presentation transcript:

HEP System Managers Meeting, UCL. Title Network Status Report John B. Macallister Oxford University and PPNCG Meeting of HEP System Managers UCL 26th November 2002 . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. JANET Backbone The JANET Backbone . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. JANET Backbone Map The JANET Backbone . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Regional Networks JANET Regional Networks . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. External Connections JANET External Network Connections . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. GEANT Map European GEANT Network . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

GEANT Global Connectivity . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. ESnet Backbone Esnet Backbone . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. ESnet Peering Esnet Peering . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Abilene Backbone Abilene Backbone . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. The Abilene Network Abilene Network . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. RAL-SLAC Rtt+PkLs Rtt and Packet Loss RAL to SLAC (21-NOV-2002) . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. DL-SLAC Rtt+PkLs Rtt and Packet Loss DL to SLAC (21-NOV-2002) . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. RAL-CERN Rtt+PkLs Rtt and Packet Loss RAL to CERN (21-NOV-2002) . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. RAL-IC Rtt+PkLs Rtt and Packet Loss RAL to IC (21-NOV-2002) . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. RAL-UK Rtt+PkLs Rtt and Packet Loss from RAL to UK Sites (21-NOV-2002) Glasgow Liverpool QMW Lancaster Bristol Birmingham . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. RAL-FNAL Rtt+PkLs Rtt and Packet Loss RAL to FNAL (26-NOV-2002) . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Ox-SLAC Route Route Monitoring Oxford to SLAC . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Ox-FNAL Route Route Monitoring Oxford to FNAL . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Ox-CERN Route Route Monitoring Oxford to CERN . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. CERN-Ox Route Route Monitoring CERN to Oxford . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Ox-Minnesota Route Monitoring Oxford to Minnesota . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Ox-SNO Route Monitoring Oxford to SNO . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Ox-US.COM Route Monitoring Oxford to US .COM Site . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Sample Incident Sample Incident Ticket Number: 20021125-2 Ticket Status: OPEN Ticket Type : Unscheduled Ticket Source: JANET OPS Ticket Scope : Link Site/Line : Geant Ticket Owner : JANET OPS Problem Fixer: - Ticket Opened: 20021125 09:44 UTC Problem Start: 20021125 01:18 UTC Ticket Update: Ticket Closed: Problem Ends : Ticket Summary: Janet connectivity to GEANT Problem Description: Janet connectivity to GEANT has been flapping on our monitoring tools since Monday 25th November 2002 01:18Hrs. Affected: Janet connectivity to GEANT Actions: cziakkb 20021125 10:02 UTC NOSC are investigating. Time to Fix: (Hours:Mins) Fix: History: Ticket Number: 20021125-2 Ticket Status: UPDATE Ticket Owner : JANET OPS Problem Fixer: GEANT NOC Ticket Update: 20021125 15:33 UTC cziabmm 20021125 15:36 UTC The upgrade has taken place and since then the peering to GEANT has remained stable. We will keep this ticket open 24 hours for monitoring purposes. cziakkb 20021125 13:18 UTC GEANT have confirmed a Bug in the UK router OS. An emergency upgrade will be done at 14:00 UTC. During this upgrade, BGP peering with GEANT will go down . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Route Detail Route Detail from Sample Incident . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. Summer’02 RAL to SLAC (14th August to 3rd September 2002) . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. UK-FR-DE-Abilene UK-FR-DE-Abilene . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. UK-ESnet UK-ESnet . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. UK-DE-FR-UK US-DE-FR-UK . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. UK-AT-CH-FR-UK US-AT-CH-FR-UK . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

HEP System Managers Meeting, UCL. US-UK US-UK . JBM . 26th November 2002 HEP System Managers Meeting, UCL.

Deployment of Network Monitoring Network monitoring will be deployed at all Particle Physics sites. Deployment will be undertaken by someone working for Robin Tasker. All sites are asked to nominate a contact for setting up of monitoring. GridPP reps may already be making arrangements. All sites are requested to contact Robin Tasker: r.tasker@dl.ac.uk . JBM . 26th November 2002 HEP System Managers Meeting, UCL.