Pacific International Maritime Conference 2019

Slides:



Advertisements
Similar presentations
1 Screen Shots. BOM Details Lot Sizing Constraints Alternate Items Produced Item Consumed Item Routing Used Consumption Ratio.
Advertisements

© 2010 Eventure Events. All rights reserved. Intelligent Resource Scheduling for Reduced Turnaround Durations Rob Richards, Ph.D. Stottler Henke Associates,
MS Project.
MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
Copyright © 2012 Certification Partners, LLC -- All Rights Reserved Lesson 10: IT Project and Program Management.
Enhancing Resource-Leveling via Intelligent Scheduling: Turnaround & Aerospace Applications Demonstrating 25%+ Flow-Time Reductions Rob Richards, Ph.D.
Resource Management Chapter 12.
Project Management Lecture Resource Analysis. Introduction Project planning Gantt chart and WBS Project planning Network analysis I Project planning Network.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Lesson 10: IT Project and Program Management. Lesson 10 Objectives  Identify resources for technical data  Identify project management fundamentals.
C ALL C ENTER O PTIMIZATION P ROJECT J.P. Cap + Vitality, Inc. | J.P. Cap |
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#10 DEPARTMENT OF ENGINEERING MANAGEMENT.
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.
MBA 8452 Systems and Operations Management MBA 8452 Systems and Operations Management Product Design & Process Selection —Service.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
Intelligent Planning & Scheduling Platform for Lean Manufacturing and Optimization of Changeovers Rob Richards, Ph.D. Stottler Henke Associates, Inc. IFPAC.
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
Full and Para Virtualization
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Chapter 7 Project Management and Event Implementation
Resource Optimization for Publisher/Subscriber-based Avionics Systems Institute for Software Integrated Systems Vanderbilt University Nashville, Tennessee.
VA Primavera P6: Resource Attributes and Assigning Resources Department of Veterans Affairs Office of Information and Technology IT Workforce Development.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
A Schedule Optimization Tool for Destructive and Non-Destructive Vehicle Tests Jeremy Ludwig, Annaka Kalton, and Robert Richards Stottler Henke Associates,
HNDIT23082 Lecture 10:Software Project Management
AXUG Partner Showcase – Introducing Preactor
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Management MGT 30725
Manufacturing Productivity Solutions
Technology that lets you Trust your batteries!
04 Master Data – Resources
Definition CASE tools are software systems that are intended to provide automated support for routine activities in the software process such as editing.
Inputs and Outputs to Aggregate Production Planning
CHAPTER 8 Operations Scheduling
Eleanor Roosevelt High School
ACTIVITY PLANNING AND RISK MANAGEMENT
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
2.2 | Use Planning Tools.
Project Management Skills.
CHAPTER 6 PROJECT TIME MANAGEMENT
Chapter 1 The Systems Development Environment
RESEARCH, EDUCATION, AND TRAINING FOR THE SMART GRID
GIS Day Site Layout Optimization Using GIS Sulyn Gomez Mohd Samrah
13 APS
FACILITY LAYOUT Facility layout means:
ENGINEERING MANAGEMENT (GE 404)
In this tutorial you will:
SharePoint Workflow Master Class
Project Management Skills
INTELLIGENT SCHEDULING BENEFITS
Resource Scheduling Difficult. Maybe Only for Big Problems
TransCAD Vehicle Routing 2018/11/29.
Introduction to Scheduling Chapter 1
Project Resource Planning
Lesson 10: IT Project and Program Management
Importance of Project Schedules
Expedite Project Updates Using a Custom Status View
Human Computer Interaction Lecture 14 HCI in Software Process
Scheduling is Difficult
Approving Time in Kronos Manager/Supervisor Reference Guide
University of Debrecen Mongolian University of Life Sciences
CHAPTER 6 PROJECT TIME MANAGEMENT
Fwin - Maintenance TSS - Software
AGED 570: Teaching H.S. Agricultural Economics
From Use Cases to Implementation
IEEE Aerospace Conference 2019 Rob Richards, Ph.D.
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

Reduced Project Duration via Intelligent Scheduling for Submarine production & Maintenance  Pacific International Maritime Conference 2019 Jordan Ciricillo & Jorge Payne  General Dynamics Electric Boat Rob Richards, Ph.D. Stottler Henke Associates, Inc.

LESSONS Efficient scheduling is incredibly difficult Significant productivity lost due to inferior scheduling Learn from the human schedulers Model to level of detail required Reveal & explain the schedule Easy & fast to perform scenarios / what-ifs

LESSONS Efficient scheduling is incredibly difficult Significant productivity lost due to inferior scheduling Learn from the human schedulers Model to level of detail required Reveal & explain the schedule Easy & fast to perform scenarios / what-ifs

Efficient Scheduling Difficult Model to level of detail required Capture human reasoning Different scheduling applications generally require different algorithms

Why can’t you search for the best order? Ordering options scale as N!

Two tasks that can occur in either order (one at a time) results in two options

Three tasks that can occur in any order (one at a time) results in six options

Four tasks that can occur in any order (one at a time) results in twenty-four options

The example below involves jobs using two resources, green and gray Why order matters? The example below involves jobs using two resources, green and gray B A E C D Schedule 1: B before C A B C E D Schedule 2: C before B A C B E D

LESSONS Efficient scheduling is incredibly difficult Significant productivity lost due to inferior scheduling Learn from the human schedulers Model to level of detail required Reveal & explain the schedule Easy & fast to perform scenarios / what-ifs

Significant productivity lost due to inferior scheduling Capture human reasoning Different scheduling domains generally require different algorithms Model to level of detail required

Scheduling results – refinery project

Microsoft Project results vs Intelligent SCHEDULING results

LESSONS Efficient scheduling is incredibly difficult Significant productivity lost due to inferior scheduling Learn from the human schedulers Model to level of detail required Reveal & explain the schedule Easy & fast to perform scenarios / what-ifs

Learn from HUMAN SCHEDULERS When decisions / tradeoffs need to be made, use the expertise of expert schedulers So that the scheduling system reacts as a human expert wants it to  E.g., when to work overtime, when to outsource Different scheduling applications generally require different algorithms Human experts help drive the best decision per algorithms

Aurora Architecture Human Directives Tasks, Resources, Constraints Preprocessor Task Queue Schedule Objects Task Ordering: Pick a Task Process Task Select/Assign Resources Task & Time Window Handle Problems Fix Problems & Optimize Schedule Propagate Constraints Criteria & Instructions Methods & Knowledge Guidance Problem Resolution Knowledge Knowledge Editors

Human knowledge DRIVES SETTINGS

LESSONS Efficient scheduling is incredibly difficult Significant productivity lost due to inferior scheduling Learn from the human schedulers Model to level of detail required Reveal & explain the schedule Easy & fast to perform scenarios / what-ifs

MODEL TO level of detail required Technical constraints (E.g., F-S, F-F, S-F, lags) Resources Labor: Occupation, skills, certifications Equipment, Tools (e.g., cranes) Usage constraints – e.g., tool can only be used for so many hours continuously &/or during a day. Spatial / physical space – e.g., job requires a certain location or type of space  two elements should (or should not) be next to each other Equipment substitutions – equipment down, know & use substitutes

Concurrent CONSTRAINTS

Non-concurrent CONSTRAINT

NON-CONCURRENT constraints: red arrows

Outsource AUTOMATION 

Remaining duration override

LESSONS Efficient scheduling is incredibly difficult Significant productivity lost due to inferior scheduling Learn from the human schedulers Model to level of detail required Reveal & explain the schedule Easy & fast to perform scenarios / what-ifs

Reveal and explain the schedule

project network

Gantt chart color-coded PER USER desired criteria

Team assignment display

Network diagram showing single-element view option

Split view showing Gantt chart same time slice as histogram, showing activities constituting resource need for one time instance

Vehicle testing schedule with build pitch

Pharma Manufacturing Machine Utilization Report Shows overall utilization of products by line Allows planners to see overall allocation and line balancing

Automatically generated explanation

LESSONS Efficient scheduling is incredibly difficult Significant productivity lost due to inferior scheduling Learn from the human schedulers Model to level of detail required Reveal & explain the schedule Easy & fast to perform scenarios / what-ifs

Easy & fast to perform scenarios / what-ifs Wall clock minimization to run a scenario critical so schedulers will actually run them Provide ways to graphically compare results

What-If: Same Demand 3 vs 2 Lines

What-if: Demand Increase

What-if: WORK WEEKEND to GET BACK On Schedule

LESSONS Efficient scheduling is incredibly difficult Significant productivity lost due to inferior scheduling Learn from the human schedulers Model to level of detail required Reveal & explain the schedule Easy & fast to perform scenarios / what-ifs