Electromagnetic Interoperability Issues Working Group

Slides:



Advertisements
Similar presentations
ELECTROMAGNETIC COMPATIBILITY Dr. Donald Church Senior Staff Engineer International Rectifier Automotive Systems November 17, 2005.
Advertisements

Conducted Immunity IEC
SWITCH-MODE POWER SUPPLIES AND SYSTEMS Silesian University of Technology Faculty of Automatic Control, Electronics and Computer Sciences Ryszard Siurek.
EMC in Electrical Power Systems Frithiof Jensen Power System Engineer November 12, 2013.
Designing a EMC Compatible Electronic Meter using AD7755 a.
Geolocation databases for spectrum sharing : ECC findings and studies EC DG CONNECT Workshop, 20 March 2015 Bruno Espinosa, Deputy Director, ECO.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Options for Protection: Protecting National Electric Grids and Critical Infrastructures Bronius Cikotas John Kappenman.
Current research work and plans Zbigniew M. Jóskiewicz Wroclaw University of Technology Institute of Telecommunication and Acoustics Wybrzeże Wyspiańskiego.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
White Papers – publication: IEEE PES Transactions – note these papers are not overly technical, may not be appropriate placement. T&D World – good audience.
Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti, Adviser, ITU.
TCCA Aircraft Certification
Roger C. Dugan Fellow, IEEE Review of the Impacts of Distributed Generation on Distribution Protection 2015 IEEE Rural Electric Power Conference Asheville,
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
1 Technical requirements on electrical goods for low voltage NV č. 17/2003 Sb. Dir. 2006/95/ES General requirements General requirements Goods or documentation.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
POWER QUALITY.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Background information on GRE/2012/44 (EMC) Proposal for the 05 series of amendments of Regulation No. 10 October 2012 Informal document GRE (68th.
The Aspect of RF & EMC in Today’s World National University of Singapore B.Tech (Electronics) EE1001E:Emerging Technology in Electrical Engineering 19.
On the Definition of Survivability J. C. Knight and K. J. Sullivan, Department of Computer Science, University of Virginia, December 2000.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
EMI EMC Introduction : Widespread use of electronic circuits for communication, computation, automation, and other purposes makes it necessary for diverse.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Dr.F. Arteche EMC DEPFET Project: A general overview.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
J.PRAKASH.  The term power quality means different things to different people.  Power quality is the interaction of electronic equipment within the.
A+ Computer Repair Lesson 9 Problems Causing Power Events.
FUNCTION GENERATOR.
R ISK AND R ESILIENCE FOR THE G RID : T HRESHOLDS AND T IPPING P OINTS James Newcomb Understanding Risk; Boulder CO, October 2015.
Piero Belforte, CSELT 1999: AEI_EMC_, EMC basics by Flavio Maggioni.
Chapter 8. Electrical Systems
(345) (345)
IEEE NPEC SC2 Equipment Qualification Electromagnetic Compatibility Compliance Type Test-Design Considerations- Installation and Mitigation Standard/Guidance.
Introduction High Voltage!!.
Entrance to EMI.
Kursus “electronic assemblies & SOLDERING Technique”
Electric Motors and Generators
Introduction to Global AC Power
Žilinská univerzita v Žiline Fakulta špeciálneho inžinierstva
Accredited Standards Committee C63® - EMC
Safety Standards & Block-Block Interface Definitions
Signal Generators Term 8.
Safety & EMC Standards & Block-Block Interface Definitions
Testing for wireless coexistence: Methods and tools
No Lab Assignment for Next Week Mandatory Attendance
Safety & EMC Standards & Block Requirements
Guide Strawman Approach 27 April 2017
EMT 462 ELECTRICAL SYSTEM TECHNOLOGY Chapter 4: AC Meters By: En. Muhammad Mahyiddin Ramli.
No Lab Assignment for Next Week Mandatory Attendance
Quality Risk Management
High Voltage Coil with Extra Insulation on initial turns
Proposed response to 3GPP ED request
TRANSFORMER Transformer is electromagnetic static electrical equipment (with no moving parts) which transforms magnetic energy to electrical energy. It.
UNIT-8 INVERTERS 11/27/2018.
Chapter 4 Transmission Impairments and Multiplexing
Protection against over voltages
The Best Value in Electronic Test & Measurement
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
GSC: Standardization Advancing Global Communications
Submission Title: [Regulatory Update]
GSC: Standardization Advancing Global Communications
Jie Xiong, Sam Sagan, Prof. Elyse Rosenbaum Prior State-of-the-Art
PowerLogic™ offer for the basic metering market
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
GSC: Standardization Advancing Global Communications
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Smart Grid Strategic EMC Recommendations for the future
Presentation transcript:

Electromagnetic Interoperability Issues Working Group Guide for Products Tested for EMC Performance February 12, 2019

Background Approximately 1,100 Members Founded in 1992 SEPA’s Mission is to to facilitate the electric power sector industry’s smart transition to a clean and modern energy future through education, research, standards, and collaboration. Approximately 1,100 Members Founded in 1992 501(c)3 membership organization

Who We Are Membership Board 700 Utilities ( IOU, Coop, Muni, PMA) 305 Corporate (Technology Providers, Developers, Consultants) 175 Other (Gov’t Agencies, Commissions, Universities, Labs, NGOs) Board 116 Coop, 107 IOU, 355 Muni

Guide for products tested for EMC performance By Don Heirman Chair of the SEPA Electromagnetic Interoperability Issues Working Group Introduction

Electromagnetic Environment - 1 The figure below indicates a simplified view of the communications overlay for the power grid, which makes the grid “smart” This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

Preface Document provides guidance for testing labs and Smart Grid device manufacturers to determine the devices immunity to various electromagnetic environments It includes Descriptions on different levels of immunity testing for different electromagnetic environments Design considerations and testing guidelines for prototype devices still in development Examples of test sequences that EMC Test labs can consider www.sepapower.org

Background Reference is made to previous whitepapers: Evaluation of the Electromagnetic Phenomena Issues on Smart Grid Reliability addresses the extent and severity of Smart Grid device operation in the electromagnetic environment. It also addressed the need for testing these devices to ascertain their immunity to the environment. EMC Test Setups for Smart Grid Devices shows that these types of tests are more complex than those commonly performed by EMC laboratories, mainly in the way they determine any degradation condition to both the power measurement and the accompanying communication channel that is beyond that is allowed or tolerated by the manufacturer of the device. www.sepapower.org

Introduction Guide is for: EMC independent test labs that determine if devices are immune to the electromagnetic environment; test levels are estimated in various reports noted in the EMIIW WG previous white paper: Evaluation of the Electromagnetic Phenomena Issues on Smart Grid Reliability and EMC Test Setups for Smart Grid Devices. Device manufacturers’ internal test labs that use immunity test results to evaluate EMC immunity problems in device prototypes under development, particularly if they are sold in areas of the world where EMC immunity testing is required. www.sepapower.org

Options in EMC test sequences 1. Apply an immunity test method that has a high probability of potentially not passing the test. Then a design change or a mitigation is applied, and a retest occurs. If the devices pass that test, the rest of the immunity tests are performed, and there is a higher probability that the device passes all tests. 2. Apply an immunity test method that is considered a benign test when a pass is expected. Then the rest of the test methods are conducted with the last test being the one that has the highest probability in stressing the device to the point of failure. 3. Use any sequence of test methods and when the device fails a particular test to stop and mitigate the device to pass that test and then continue on with the rest of the test scenarios. 4. Do not test at all and see if the device operates as intended in the electromagnetic environment where it is installed; if there are installed devices that succumb to the environment find a “fix” that can be installed where there are failures. www.sepapower.org

Selection of Immunity tests and test levels IEC 61000-4-X EMC Immunity Tests for Smart Grid Device Testing 4-2 Electrostatic Discharge (ESD) 4-3 Radiated RF immunity 4-4 Fast Transients/Bursts 4-5 Surge (lightning) 4-6 Conducted RF immunity 4-8 Power-frequency magnetic fields 4-10 Oscillatory magnetic fields 4-11 Voltage Dips/Interruptions - ac 4-12 Oscillatory Surge Withstand 4-16 Common mode disturbances 4-17 Ripple on dc input power port 4-18 Damped Oscillatory Wave 4-29 Voltage dips/interrupts - dc As indicated in two previous white papers produced by the EMIIWG, shown here is a suite of immunity tests that are considered to be a minimum number to assess the immunity of a device to a wide range of typical EM sources that can significantly affect device operation. Table 2 from EMC Test Setups for Smart Grid Devices identifies typical immunity tests that should be performed to determine if these devices reliably perform within specifications. Guidance documents: IEEE-1613(2009) + IEEE-1613.1(2013) and their successor IEEE-P1613 (201x) IEC 61850-3 (2013) Communication networks and systems for power utility automation IEC 61000-6-5 (2015) Immunity for equipment used in power station and substation environment Guidance Documents Guidance Documents IEEE-1613(2009) + IEEE-1613.1(2013) IEC 61850-3 (2013) IEEE-1613(2009) + IEEE-1613.1(2013) IEC 61850-3 (2013) IEC 61000-6-5 (2015) This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

Some issues to consider when selecting the test sequence Start with the test that is most likely cause damage Find any issue that have to be mitigated before continuing the rest of the lesser impact tests. Start with the test that is least likely to cause damage and then continuing through the test sequence until the test most likely to cause damage Maximize the information obtained before the device is subject to damage. The test sequence may be limited by the availability of test equipment or lab facility space. In this situation, the lab schedule, may dictate the test sequence. This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

More on Sequence/Order of EMC Testing The results of the EMC immunity tests are independent of each other. The tests may be performed in any order. The EUT must be functional, undamaged in any way, and meet its performance requirements at the start of each test. Some of these tests may cause damage to the EUT due to the nature of the test and the EUT. The acceptance criteria will define what, if any loss of functions, is allowable. Most EMC test labs will usually begin with the emission measurements since these tests will not damage the EUT. This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

In Case of Failures If failures (i.e., upsets) are experienced during testing: A manufacturer may choose to halt testing until the EUT can be redesigned. May result in longer development times since the EUT may fail the next test and may also need additional design changes. However, it may be best to complete as much testing as possible to expose the EUT to as many tests as possible. Could expose multiple design failures at one time but results in more initial testing and retesting. In the end, the EUT must meet all requirements and their associated performance criteria. A manufacturer might want to start with the test that is most likely to cause a failure. Expose an EUT’s weakness at the start. Issues can be handled before moving on and thereby reducing retesting if a redesign is needed. Often used when multiple samples are available, and a new working sample would be available for the next test if it the previous sample was damaged. This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

Ranking of Testing The tests were ranked by their likeliness to cause damage. The tests were placed in two group based on the expectation for damaging the EUT. Assumes that the device damage is primary, and the channel interference is secondary but still important. The two approaches are identified as Group A and Group B. While results may vary depending upon the EUT. This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

Group A (higher expectation of device damage) For IEC 61000-4-X Immunity Test Standards 4-2 Electrostatic Discharge (ESD) 4-5 Surge (lightning) 4-12 Oscillatory Surge Withstand 4-16 Mains frequency voltage common mode 4-11 and 4-29 Voltage Dips/Interruptions 4-18 Damped Oscillatory Wave This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

Group B (lower expectation of device damage) For IEC 61000-4-X Immunity Test Standards 4-10 Damped Oscillatory magnetic field 4-4 Fast Transients/Bursts (EFT) 4-3 Radiated RF 4-6 Conducted RF on power and signal lines 4-8 Power Frequency magnetic field 4-17 Ripple on DC supplies This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

Dependence on ISO/IEC 17025 Test setups documented in a test plan in: EMC Test Setups for Smart Grid Devices ISO/IEC 17025, “General requirements for the competence of testing and calibration laboratories” is used for Internationally accepted and followed by test labs Organizes the report and the detail needed Identifies the photos/diagrams of what was tested. Ensure that nothing important is left out Facilitate repeating the measurement www.sepapower.org

Organization References are in sequence when they appear in the paper Primary references are standards mainly from the International Electrotechnical Commission (IEC) as they are resource for most immunity testing standards and also those describing the electromagnetic environment Special application standards come from IEEE Power and Energy Society work Standards applicable to high power transients are shown as “references from Annex B”. www.sepapower.org

Examples 3. IEC 61000-2-5 (2017): Electromagnetic compatibility (EMC) – Part 2-5: Environment –Description and classification of electromagnetic environments 4. IEC 61000-6-1 (2016): Electromagnetic compatibility (EMC) – Part 6-1: Generic standards - Immunity standard for residential, commercial and light-industrial environments 5. IEC 61000-6-2 (2016): Electromagnetic compatibility (EMC) – Part 6-2: Generic standards -Immunity standard for industrial environments 6. IEC 61000-6-5 (2015): Electromagnetic compatibility (EMC) – Part 6-5: Generic standards -immunity for equipment used in power station and substation environment 7. Evaluation of the Electromagnetic Phenomena Issues on Smart Grid www.sepapower.org

Annex B – Severe High- Power Transient Phenomena - 1 While high-power transient events are low probability events, it is well known that when they occur, they are more likely to affect the operation of communications equipment, which operates at lower peak voltage levels than most power equipment (e.g. transformers) Two principle concerns include the possibility of a HEMP attack over the U.S. or a local IEMI attack using electromagnetic (EM) weapons A HEMP attack can illuminate a large portion of a power grid (over thousands of km) including its communications systems simultaneously An IEMI attack is a more local threat, although it is possible that such an attack could affect multiple substations or power stations within a short time frame The electromagnetic transients produced by these threats include both high peak levels of fields (~50 kV/m) with very high frequency content (MHz into the GHz range). Also HEMP can produce sub-hertz waveforms with peak fields on the order of tens of V/km, which is much higher than the worst case geomagnetic storm threat. In addition to the radiated transients, high levels of conducted transients are also produced by both threats at high frequencies (above 1 MHz) and at low frequencies (severe power harmonics due to transformer saturation) by HEMP The expected levels of these transients are described in IEC 61000-2-9, 2-10 and 2-13 This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

Annex B – Severe High- Power Transient Phenomena - 2 With regard to protection from these EM transients, IEC SC 77C has worked for many years to provide protection methods that can be applied to a variety of commercial equipment and systems These protection methods are based on standard EMC protection techniques including the use of shielded buildings, rooms, or racks to reduce the external fields to levels that can be tolerated by normally produced electronic equipment (which are designed to EMC standards) Conducted transients are reduced by the use of surge arresters and filters, but designed for the particular transients of interest The entire collection of IEC SC 77C high power EM standards are coordinated in a recent publication, IEC 61000-5-10, “Guidance on the protection of facilities against HEMP and IEMI” It is noted that these high-power EM transient standards rely strongly on testing to ensure compliance, whether the testing is performed at the equipment or system level As in the case of EMC testing, it is important to test the critical functions of the equipment under test including any communications functions This meeting, and all SEPA activities, are governed by SEPA’s By-laws and policies. (Including the Intellectual Property Rights Policy and Antitrust Policy.) SEPA © 2018 | www.sepapower.org

Key takeaways Smart Grid device immunity to the electromagnetic phenomena is critical for reliability and performance Assessing the EMC of devices is needed by performing immunity tests identified in document EMC review is needed at both the device manufacturer in-house testing and at the EMC test laboratories immunity assessment of the device perspectives The sequence of immunity tests varies and is left with the test lab to apply based on experience Attention should be paid to even a severe electromagnetic environment where fast rise time high power pulses may be present. www.sepapower.org

Thank you for your attention!