Commission Agenda Item #1

Slides:



Advertisements
Similar presentations
Best Value Pre-selection and Procurement
Advertisements

Calaveras County Water District Capital R&R Program Funding Options March 25,
Lakewood School District REFERENDUM SEPTEMBER 30, 2014.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
The City of North Bend Sanitary Sewer System
Perrin-Whitt CISD 2010 – 2011 Budget (Proposed). Tax Values.
Changes to Charter School Laws Jason Hancock Deputy Chief of Staff.
REGARDING RESERVES.  The operating budget for your association is prepared every year to project the next years expenses and determine the amount of.
TOWN OF CHESTER PROPOSED BUDGET PUBLIC HEARING MAY 1,2013 TOWN MEETING MAY 21,2013.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Green Building Demonstration Project Adam Saling City of San Diego.
Budget Hearing Sept. 12,  The “Budget” ($9,131,600 expenditures)  Disbursements/Transfers- $10,305,826 Salaries and Benefits - $7,154,154 Supplies,
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Buy American Provisions of ARRA 2009 State CDBG Recipients Workshop.
The Minnesota State Colleges and Universities system is an Equal Opportunity employer and educator. Minnesota State Colleges and Universities FY
Page 1 Town of Williamston Water Rates. Page 2 Page 3 Major New Costs Incurred Due to MCRWASA Plant Coming On Line Extra staff time: $10,000 (estimated)
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Michigan Minority Contractors Association October 2, 2015.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
Immediate Threat and Danger Program Pam Truitt  September 10, 2015.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates April 19, 2007 Prepared by:
APP. # A1 ITEM 11A, THURSDAY OCTOBER 9 Kochis Dock Replacement 1509 East Bay Avenue, Newport Beach.
DEFERRED CAPITAL PROJECTS REPORT Facilities Sub-Committee June 11, 2013.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
DUBLIN WASTE TO ENERGY - Project Update Matt Twomey Dublin City Council.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
Detroit 0% Interest Home Repair Loan Program 1 CITY OF DETROIT HOUSING & REVITALIZATION DEPARTMENT Program grant sub-recipient overseeing loan capitalization.
Pinole Valley High School (PVHS) Project Status 1 Facilities Subcommittee Meeting March 15, 2016.
Page 2 Salt Lake City International Airport – April 12, 2016 FY 2017 Budget Goals & Objectives - Budget Drivers  Implement the Terminal Redevelopment.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
Update 05/09/16. AGENDA  Re-cap of 5/4 Council Approved changes  Staff’s Alternate Budget Proposal  Goals  Financial details  Recommendations – pending.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
March 17, Major Construction Project Update West Boise - EBNR and Struvite Dixie Drain Major NPDES Permit Issues Update Phosphorous, Temperature,
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
FY 2001 CDBG Budget $16,377,000 Administration 427,540
Budget Overview State Budget Overview M & O Levy Review
Overview WMU – Case Study Software Demonstration Best Practices
FY 2017/18 General Budget Workshop
Well 38 Drilling & Testing Amendment
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
District-Wide Well Maintenance, Rehabilitation, and Repair
4.4 Procurement by grant beneficiaries
Pre-Construction Services
Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.
City of Noblesville Wastewater Utility
Moraga community Foundation
EARLY VOTING BEGINS APRIL 10. ELECTION DAY IS MAY 8, 2018.
Monterey Peninsula Unified School District
Open Hearing Presentation March 18, 2019
Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract.
Execute Purchase Order South Shore Water Reclamation Facility Building 359 Odor Control System Repairs Commission Agenda Item #8.
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Change Order Number One Purchase Order for Ferric Chloride Use
Sludge Dewatering Filter Press Controls Upgrade at SSWRF
Change Order Request Contract S02013C01 SSWRF RAS System Improvements Restore ED’s Original Delegated Authority Approve Changes in TPC Commission.
Access Hatch Replacement Phase 4
Access Hatch Replacement Phase III
Authorizing ED to Reject Bid for Contract P01005C10
Jones Island Water Reclamation Facility
KK River Flood Management Community Outreach Services
Building 360 Freight Elevator Rehabilitation at SSWRF
Commission Agenda Item #5
Capital Projects Process
Authorize ED to Execute Purchase Order
Commission Agenda Item #2
Presentation transcript:

Commission Agenda Item #1 Award Contract J06069C01 JIWRF Building Roofs Replacement – Phase 3 and Approve Changes in TPC Commission Agenda Item #1

JIWRF Roofing Systems Numerous different roofing systems of varying ages and conditions  VW responsible for inspecting and monitoring condition of roofing systems and repairs District responsible for funding capital roofing system replacements Identified need to replace roofs on 8 buildings Roofs at end of service lives

Roof Replacement Description Building No. Building Name Roof Size (ft2) Roof Replacement Description 243 Chemical Unloading Facility 6,000 Polyvinyl chloride (PVC) roof system 245 Disinfection Building 4,560 PVC roof system 247 Effluent Pump Station 12,900 256 Thickening Facility 21,760 257 Equalization and Blend Facility 8,240 Areas 1, 2, and 3: PVC roof system Areas 4 and 5 with fluid applied roof system 263 Inline Pump Station 6,660 Area A with fluid applied roof system Area C with PVC roof system 268 East Plant Gallery 3,080 289 Power House 22,400 Areas 1 and 2 with PVC roof system Area 3 with modified bitumen roof system

Project Costs/Schedule Low bid received less than budgeted Staff request to decrease TPC accordingly Contract duration is 14 months

QUESTIONS?