Commission Agenda Item #2

Slides:



Advertisements
Similar presentations
Item 5.h - Authorization to Advertise the Repairs to the Glorietta Bay Pump Station Project for Bid.
Advertisements

Slide 1 Are your Buildings Managing You? 2007 IASBO Conference May 16, 2007 Mike Steffens, Ameresco Jerry Brendel, Superintendent, Woodridge SD #68 Wendy.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Lakewood School District REFERENDUM SEPTEMBER 30, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
The City of North Bend Sanitary Sewer System
Perrin-Whitt CISD 2010 – 2011 Budget (Proposed). Tax Values.
Welcome to presentation on Contract Management System ( Primavera Software Solutions) (EPPM & CMS)
State of Oklahoma Information Services Division Contracts and Purchasing Unit 1.
TOWN OF CHESTER PROPOSED BUDGET PUBLIC HEARING MAY 1,2013 TOWN MEETING MAY 21,2013.
Bridge Engineering Section Bridge Rehabilitation.
Arapahoe Estates Community Annual Meeting February 26, 2009.
Fundamentals of Project Management A complete flow.
Buy American Provisions of ARRA 2009 State CDBG Recipients Workshop.
The Minnesota State Colleges and Universities system is an Equal Opportunity employer and educator. Minnesota State Colleges and Universities FY
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
BUDGET OFFICE AUGUST 6, EXPENDITURE RECOMMENDATIONS.
FY2014 Budget – Items of Interest Supplemental Budget Documents Proposal to use $1,964,676 of Fund Balance dollars to pay for General Fund Capital projects.
Capital Renewal Plan Update May Recent Projects.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
Keith Roberts, P.E. Project Implementation Engineer IDOT – District 9.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Carson City, Nevada Finance Department July 1, 2016 through June 30, 2017 Budget Workshop.
Detroit 0% Interest Home Repair Loan Program 1 CITY OF DETROIT HOUSING & REVITALIZATION DEPARTMENT Program grant sub-recipient overseeing loan capitalization.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Update 05/09/16. AGENDA  Re-cap of 5/4 Council Approved changes  Staff’s Alternate Budget Proposal  Goals  Financial details  Recommendations – pending.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
PORT OF TACOMA. Request Final Acceptance of Contract No for the work associated with the WUT Crane Power Modifications, Project No. E8023. Final.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Overview WMU – Case Study Software Demonstration Best Practices
Stockton Event Center Audit Recommendations and City Response
CITY OF NEW SMYRNA BEACH
Capital Project Needs Assessment
District-Wide Well Maintenance, Rehabilitation, and Repair
Pre-Construction Services
SJVRWRF Dewatering Building Corrosion Remediation
Heritage Tree Ordinance Update
REAL ESTATE SERVICES DEPARTMENT
Awarded Vendors Bid No MS Preventative Maintenance & Repair Service for Kitchen Equipment Contract Term ends 6/30/2023 (6 years) Board Approved.
Optimization for Airport Facilities
PCC Update 08/26/09 Implementation Phase 1
Proposed K-20 Budget FY 08/09.
Roanoke County Schools Budget Work Session March 15, 2018
M E A S U R E ‘G’ P R O G R A M U P D A T E
Making a Purchase using Federal Funds
Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract.
Execute Purchase Order South Shore Water Reclamation Facility Building 359 Odor Control System Repairs Commission Agenda Item #8.
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Change Order Number One Purchase Order for Ferric Chloride Use
Sludge Dewatering Filter Press Controls Upgrade at SSWRF
Change Order Request Contract S02013C01 SSWRF RAS System Improvements Restore ED’s Original Delegated Authority Approve Changes in TPC Commission.
Access Hatch Replacement Phase 4
Access Hatch Replacement Phase III
Authorizing ED to Reject Bid for Contract P01005C10
Jones Island Water Reclamation Facility
Design and Engineering Services
KK River Flood Management Community Outreach Services
Building 360 Freight Elevator Rehabilitation at SSWRF
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Commission Agenda Item #5
Citizens’ Bond Oversight Committee September 21, 2016
Capital Projects Process
Authorize ED to Execute Purchase Order
Commission Agenda Item #1
Presentation transcript:

Commission Agenda Item #2 Award Contract S06034C01 SSWRF Building Roofs Replacement – Phase 3 and Approve Changes in TPC Commission Agenda Item #2

SSWRF Roofing Systems Numerous different roofing systems of varying ages and conditions  Veolia responsible for inspecting and monitoring condition of roofing systems and repairs District responsible for funding capital roofing system replacements Identified need to replace roofs on 4 buildings Roofs at end of service lives

All roofs to be replaced with PVC Roof System Building No. Building Name Roof Size (ft2) Proposed Scope 358 Sludge Thickener Building 19,130 All roofs to be replaced with PVC Roof System 360 Dewatering Building Phase II 53,450 380 Maintenance Building A 8,400 381 Maintenance Building B 7,200

Project Costs/Schedule Low bid received less than budgeted Staff request to reduce TPC accordingly Contract duration is 9 months

QUESTIONS?