Likelihood 4 Allow 8 Mitigate 12 Avoid 16 3 Accept Severity

Slides:



Advertisements
Similar presentations
EXERCISE IN MITIGATION DECISIONS MODULE 2 THE MULTI-HAZARD ENVIRONMENT.
Advertisements

The Department of Energy Enterprise Risk Management Model
RISK ANALYSIS.  Almost all of the things that we do involve risk of some kind, but it can sometimes be challenging to identify risk, let alone to prepare.
Mindari Session Scoutsafe and Risk Management By RL Brian See
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
University of Sunderland COMM80 Risk Assessment of Systems ChangeUnit 11 Risk Mitigation and Contingency Planning COMM80: Risk Assessment of Systems Change.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
8 Managing Risk Teaching Strategies
ELECTRONIC SYSTEMS ENGINEERING TECHNOLOGY TEXAS A&M UNIVERSITY Innovating tomorrow’s products and systems today Dr. Joseph A. Morgan, D.E., P.E.
Project Risk Management
R-1 Project Risk Management. R-2  Qualitative Risk Analysis  Quantitative Risk Analysis  Risk Response Planning  Sticky note technique  Risk matrix.
PMI Knowledge Areas Risk Management.
Risk Management Report to Audit Committee 26 September 2006 Lee Harris Assistant Chief Executive.
Managing Risk. What is Risk Risk is the chance of things happening that could have an impact on the outcomes it achieves, or on the objectives of the.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Tingxuan Liu Risk Management in Software engineering.
Engin Ali ARTAN Industrial Engineering
Project Management Risk Management. Introduction Project planning Gantt chart and WBS Project planning Network analysis I Project planning Network analysis.
Risk & Opportunity Management Putting theory into Practice Susy Austin MQM Business Consultant.
Doug Off Ojai Oil Company Golden State Storage May 02, 2012.
STAGE #5: CLOSING 5 Process Stages of Project Management.
1 The Value of Risk Management Risk management is an essential feature of successful project management If you don't manage risk your project will ultimately.
CSC 480 Software Engineering Lecture 5 September 3, 2004.
R&D PROGRAM RISK ASSESSMENT Yuri Tsenkov UNWE – DNRS.
Risk planning Risks can be dealt with by: Risk acceptance – the cost of avoiding the risk may be greater than the actual cost of the damage that might.
Paul Cough, Director Ocean and Coastal Protection Division Environmental Protection Agency JPAC - CEC November 6, 2014.
2.8 Crisis Management and Contigency Planning Chapter 17.
1 /13 Risk Management What is Risk ?. 2 /13 Risk Management What is Risk ? Risk is the possibility of suffering loss. (Carnegie Mellon SEI definition)
RISK ASSESSMENT Risk Assessment 1 of 14 RISK ASSESSMENT A guide to the basics.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-I)
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Risk and Issue Exercise Tasks
8 Managing Risk (Premium).
Risk Management for the Diamond Drilling Industry
COMP3357 Managing Cyber Risk
Please click screen ONCE to begin presentation.
2.8 Crisis Management and Contigency Planning
Race Equality in Schools: maintaining the momentum for change   David Gillborn Institute of Education, University of London.
Project Management
Project Management
Project Management
Project Management
Risk Register I want to plan a project
کنترل داخلی چارچوب يكپارچه.
Risky Business.
System administration Risk Management
Probability and Statistics
Management. Management What is a risk? A risk is simply a probability that some adverse circumstance will actually occur.
Lesson 7 Risk Management
Insuring Against Catastrophes
Program Status (Chart 1)
مديريت ريسك پروژه (Project Risk Management)
Figure 3: Risk Analysis Model
Risk Management Process (Revised)
Must cost less than possible Impact
Lecture 2 – Risk Management Process
Risk Management CSCE 489/689 (Software Security) Fall 2018
Chapter 3 Probability Sampling Theory Hypothesis Testing.
Planning and organising Two Risk Management Introduction
MOVING FORWARD HOW CAN WE MAKE THE MOST OF THE BUSINESS-EDUCATION PARTNERSHIP COUNCIL?
Effective Risk Management in Decision Making Process
Project Risk Management
OPERATION & USE RISK ASSESSMENT – OURA
Risk Title/Description
PFMEA Summary Process Steps
Company Name: Registered Number: Presentation by:
Position and speed as a function of time
Action title DUMMY SLIDE DUMMY SLIDE DUMMY SLIDE Situation
Lesson 7 Risk Management
Presentation transcript:

Likelihood 4 Allow 8 Mitigate 12 Avoid 16 3 Accept 6 9 2 1 Severity stakeholdermap.com

Risk ratings Rating Description Avoid Find a way to avoid the risk. For example, by taking a different approach, not doing something, using different equipment etc. Mitigate Find a way to reduce the likelihood of the risk occuring or the severity of the impact if the risk does occur. Allow OK to proceed but aim to mitigate the risk if possible. Accept The risk is acceptable. The project can move forward, and mitigation of the risk is a low priority. stakeholdermap.com