Greater Pittsburgh Airport Area Property

Slides:



Advertisements
Similar presentations
COLDWELL BANKER RESIDENTIAL BUILDER, LAND & COMMERCIAL SERVICES I 30 & CR ACRES.
Advertisements

Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Titusville to Edgewater Bike Loop PD&E Study
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Environmental Assessment Public Meeting
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Longmeadow Parkway Fox River Bridge Corridor
Vacant Surplus City Property Administration & Finance Committee August 6, 2014.
8/29/20151 Docket Z (Easter Mountain, LLC) A Request to Rezone 556 Acres From RU-4 to SR-2 Cochise County Board of Supervisors October 25, 2011.
Alachua County Plat Review Process October 14, 2008.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Project Oasis West Des Moines, Iowa Presentation January 30, 2013.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
MED SR 18 Corridor Project MED PID October 13, 2015.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN-07-03a & ZONING MAP AMENDMENT RZ-OTH
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
The Central Avenue Connector Trail
Jefferson County SA Red Rocks Site Approval
Buckner Boulevard Special Purpose District PD 366
Four Winds Condominium Association August 2, 2017
The I-465 West Leg Reconstruction Project
Butte County Board of Supervisors December 6, 2016
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
Montgomery County Planning Commission
Central Polk Parkway PD&E Study
Florida Real Estate Principles, Practices & Law 39th Edition
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Jefferson County Planning Commission Hearing April 10, 2013
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
The Oakton Condominium Association September 12, 2017
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Prime Redevelopment Opportunity
Measure A Financial Oversight Committee August 7, 2013
Redesignation of I-95 and I-295
I-69 Southwest/I-610 West Loop Interchange Reconstruction
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Route 1 Salisbury, Massachusetts
Bi-County Parkway Evaluation of Impacts on Fairfax County Roads
321+/- ACRES, ALL GRASS UNIT, HOLT COUNTY, NEBRASKA
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Planning Commission Meeting: August 3, 2016
Signs, Signals, and Road Markings
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Southern Bridge Project Brown County Executive
Rochelle downtown Historic District
Biltmore C Proposed Water & Sewer Improvement Project
FRLP Proposed Boundary Line Adjustment: Confluence Virginia
U.S. 20 at State Road 2 New Interchange
Ohio Department of Natural Resources Office of Coastal Management
Overlay Districts Presented by: Zina Lagonegro Manager of Zoning
WSUP Madole Construction
Interstate 95 Corridor Improvement Plan
Washoe County Board of Adjustment
12B: Scott County CDA Comprehensive Plan Amendment, Rezoning and Zoning Code Amendment City Council June 18, 2018 Laura.
VICTORIA CITY COUNCIL MEETING
Presentation transcript:

Greater Pittsburgh Airport Area Property Information Package Scroll down Slowly

Zoned B-2 B-2 General Business. The purpose of this District is to provide for retail and service facilities which serve the needs of the general community and which are located in high volume traffic corridors to allow convenient access and to minimize traffic impact on neighborhoods and local roads.

LOCATION 1410 Feet Frontage on the South side Route 22 ,1497 Feet on Pattridge Lane North Fayette Township, Allegheny County, Pa. Less than 15 min drive to Gr Pitt Airport. 25 min Downtown Pittsburgh, 20 min Weirton W.Va.

Property Information City Water, Electric, All at property line. 33.912 Acres. Zoned B-2 Commercial Business For more information on North Fayette Township Zoning Go to this web site (Copy And Paste Below) file:///C:/Users/HERIT_000/Downloads/Zoning%20%20Codes%20NORTH%20FAYETTE.pdf

Contact Information Selling Price $1,395,000 Contact :Don W Segui /Broker Property Owner coventryproperties@msn.com (Best Means of Communication) Office 239-593-5683 Mailing Address: Coventry Properties P.O. Box 110546 Naples. Florida 34108

County Records Lot Area :33.9123 Acre Parcel ID : 0916-S-00001 Municipality : 929 NORTH FAYETTE Property Address :PATTRIDGE LN, IMPERIAL, PA 15126 Alternate ID : 9929-X-01777 School District :West Allegheny Neighborhood Code :92904 Owner Code :Corporation : State Code :Agricultural Farmstead Lot Area :33.9123 Acre Deed Book :12591 Deed Page :223

AERIAL VIEW Subject property

PLOT PLAN

Second Phase Currently Under Construction X (X) Is Subject Property

Route 576 Update Pennsylvania Route 576 (PA 576), the Southern Beltway, is a partially completed tolled highway in the southern and western suburbs of Pittsburgh, Pennsylvania, United States. Upon completion it will serve as a southern beltway around the metro Pittsburgh area from the Pittsburgh International Airport to the historic Steel Valley of the Monongahela River. The first section of the highway from Interstate 376 near Pittsburgh International Airport to U.S. Route 22 opened on October 11, 2006 at 3 p.m. Construction on a segment of the beltway that will link US 22 to I-79 near the National Cemetery of the Alleghenies is currently underway and planned for a 2020 opening, while the final segment from I-79 to PA Turnpike 43 is pending.[2][3] Federal approval has been given for both segments. Although PA 576 runs north–south between I-376 and US 22, the route is signed as east–west to reflect the routing that the completed beltway will take; PA 576 will begin to have a more general east–west routing when the second leg to I-79 opens in 2020.[4]

GREATHER PITTSBURGH AIRPORT TOP CENTER SUBJECT PROPERTY RED DIAMOND BELOW

2021 Opening Southern Beltway In December, the commission awarded a $174.3 million contract to Chicago-based Walsh Construction Co. for the building of the beltway’s interchange with Interstate 79. That represents the final phase of the 13-mile, $800 million project linking I-79 with the Findlay Connector at Route 22 in Robinson Township, Washington County, providing direct access to Pittsburgh International Airport. A 12.5-mile project from I-79 to the Mon-Fayette Expressway is proposed, with the Turnpike Commission proceeding “with final design, right-of-way acquisition and construction of the project as funding becomes available.” In the meantime, work on the middle section continues to cause temporary traffic restrictions on local streets. The latest to be affected is Noblestown Road, between the Robinson Township Municipal Building and Cooks Road, which was set to close Feb. 13,2019 for approximately 30 days. The posted detour is along Johns Avenue in Mt. Pleasant Township and McDonald Borough.