GEn-RP engineering & design Status

Slides:



Advertisements
Similar presentations
SBS Design Status Robin Wines. SBS Design Transfer in process of yoke steel from BNL, but BNL is having issues with their magnet tagging system – update.
Advertisements

1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
West Wall Compressor Requirements West Wall Mezzanine Move compressors to the West Wall to distance from magnetic field Find compressor position on West.
Chapter 13 NUCLEAR MAGNETIC RESONANCE SPECTROSCOPY Chapter 13: Nuclear Magnetic Resonance Spectroscopy.
CONFIGURATION AND SENSOR LAYOUT AC5 AC6 AC7 Accelerometer-AC AC1 HAMMER VibPilot AC4 AC3 AC2 No Gains is used. Calibration Constant are entered manually.
HERMES tracking for OLYMPUS. Part #1. Detector survey. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Muon Lifetime Eric Chu & Joseph St. Marie. Goals of our Experience Gain an understanding of electronics Design and run a working muon experiment Analyze.
CONFIGURATION AND SENSOR LAYOUT AC5 AC6 AC7 Accelerometer-AC AC1 HAMMER VibPilot AC4 AC3 AC2 No Gains is used. Calibration Constant are entered manually.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
IRB Space Choice. Considerations Patient access – Most walking, some wheelchair – Access for ambulance stretcher – No line of sight to bench work (?)
Using Stress Analyzer for Tensile Testing © 2012 Project Lead The Way, Inc.Principles Of Engineering.
Ch Magnetism I. Characteristics of Magnets (p )  Magnetism  Magnetic poles  Magnetic field  Magnetic domain.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Engineering Division 1 HHMI 8.2.X Endstation Modification Review Allan DeMello 12/13/2006.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
SBS Magnet and Support Status Robin Wines June 2013.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Status of the M-ECCTD F. Peauger - P. Bosland
The LHCb Installation Story
RD51-WG X June test beam experience: useful information for October
FIGURE 20.1 Many vehicles, especially those equipped with four-cylinder engines, use a dampener weight attached to the exhaust system or differential,
S1-G cryomodule assembly status
SBS Magnet, Optics, and Spin Transport
Polarimetry Ken Livingston Sept 2012
Update on GEp GEM Background Rates
Mechanical Engineering
Methods and Procedure for adjusting eccentric cones in INFN configuration Peter Amnuaypayoat 5/14/04.
I. Characteristics of Magnets
I. Characteristics of Magnets
Magdalena Kowalska, CERN PH-SME-IS
Enabling System Elements
Using Stress Analyzer for Tensile Testing
Fundamental Neutron Physics BL-13
The Abriana Assembly Instruction By Laser Dollhouse Designs
Run4 f K+K- analysis: analysis train
Control Racks Behind Nth Shield Wall modelled with
ارائه دهنده: محمود امین طوسی
مديريت موثر جلسات Running a Meeting that Works
September 2004 Motion Request the assigned numbers authority to assign three Element ID codes for the use of TGk. The element IDs 51, 52 and 53 are specifically.
66th ISOLDE Collaboration Committee meeting
GEANT Simulations and Track Reconstruction
Hall “12 GeV” May 27, 2003 NAPP 2003: J.J. LeRose.
PREX / CREX Collaboration Meeting and Status
Installation of Photon Beam Transport to FEH
status of experiment trigger conditon (empty)
Summer Training Department of Industrial Engineering
Charging by Magnetism Since you can create a magnetic field by running electricity through a wire, can you create electricity using a magnetic field?
Magnet, Support and Infrastructure
Diagram : Task 1 Proof Version 1
NPS Status Feb 01, 2019 Paulo M & Steven L.
Science Activity: Stnd 01 Date
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

GEn-RP engineering & design Status Robin Wines May 2019 ERR

Components of Gen-RP GEn polarimeter experiment requires SBS BB CE Polarimeter PR Polarimeters HCAL and CDET May 2019 ERR

Gen-RP Layout Configured to run with GMn experiment BL BR BB HCAL SBS Polarimeters May 2019 ERR

Gen-RP equipment- 1st setup Field Clamp SBS PR Polarimeters PR polarimeter CE polarimeter CE Polarimeter PR polarimeter E-Hut May 2019 ERR

Gen-RP equipment-2nd setup Requires removal of Field Clamp, Cu Analyzer, CH Analyzer and PR Polarimeters May 2019 ERR

GEn-RP equipment CE Polarimeter requires Main frame support with alignment and motion capabilities Cu Analyzer and frame 4 GEM subframes and mounts CH Analyzer and frame PR Polarimeters require 2 main frames with supports and alignment 2 GEM subframes and mounts 2 Plastic Scintillator mount sets 2 rail sets GEMs Cu Analyzer CH Analyzer May 2019 ERR

Shielding Requires shielding between BB & SBS for GEMs Plan to use existing shielding wall with addition of structure and lead to increase size to 42” Requires shielding of field from SBS magnet - Field clamp existing Field Clamp Shielding wall May 2019 ERR

Status May 2019 ERR

Gen-RP May 2019 ERR