IS&LEBT Commissioning Review Safety and Radiation Protection

Slides:



Advertisements
Similar presentations
COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007.
Advertisements

PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Gauges and well logging
Safety aspects: electrical and gas safety, Cs handling, radiation & fire protection Matthias Kronberger, Mats Wilhelmsson On Behalf of the Linac4 ion source,
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Lali Tchelidze Safety work package leader
Self-tanning Outcome 1 Maintain safe and effective methods of working when providing self-tanning.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Safety Consolidation in and around the Injector chain* S Baird On behalf of R Brown, V Chohan, J-L Duran-Lopez, B Linseisen, R Steerenberg, F Szonsco (for.
Copyright  Progressive Business Publications Electrical Safety.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
MNM Fatal Electrical Electrical October 16, 2004 (Missouri) October 16, 2004 (Missouri) Crushed Stone Operation Crushed Stone Operation Laborer.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Mitsubishi I-MiEV Isolation Procedure.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ELECTRICAL SAFETY in the Lab. 1.Electricity takes the path of least resistance. 2.Electricity wants to go to ground. 3.If an electrical appliance or tool.
Pipeline Safety Management Systems
Report Technical Director Storage-Ring-Installation Completed
20 Principles for Managing Behavioural Safety & Process Safety
CONFINED SPACE ENTRY TRAINING PROGRAM
Current Plant Performance
(Modified from University Of South Carolina)
ELENA installation and commissioning status
HEL – Safety aspects Christelle Gaignant
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
East Area Renovation Project team #6 Launch safety agreement
Electrical Equipment CSP uses conventional electrical equipment in the majority of areas All installations follow the mandatory electrical codes The.
Electrical Equipment CSP uses conventional electrical equipment in the majority of areas All installations follow the mandatory electrical codes The.
Click anywhere to get started…
From AS :   Part 4— Commissioning, operation and asset management
Andreas Jansson, Lali Tchelidze
Workshop on Accelerator Operations
Updates on ESS Handbook for Radiation Protection
Charging without contact
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
Radiation protection organisation
Helen Boyer OHS group leader
PSS1 overview Stuart Birch
Operations, Risks & Hazards
Ion Source and LEBT control system topology, Interlock strategy
TS2 PSS Architecture, Concepts of Operations and Interfaces
Personnel Safety system 0 for the Ion Source and LEBT (PSS0)
Operations Section Leader
ISRC and LEBT Vacuum System Design
PSS0 Scope Stuart Birch 8th February 2018.
PSS0 Design & Concept of Operations
LEBT water cooling system
PSS Verification and validation
STUB configuration Mats Pålsson
Safety Analysis and Safety Functions
(Beam) Commissioning Plan
Radiation Protection Handbook
Safety Readiness Review (SRR) Thomas Hansson, ESH
TS2 PSS; update on concepts of operation and system's architecture
ESHAC Meeting # Peter Jacobsson Head of ESH
References / Documents
ISrc & LEBT – ICS Installation Readiness Review
Rack installation and local tests for the MEBT Chopper Rack
Polarized 3He target installation
Stuart Birch On behalf of Protection Systems Group
Presentation transcript:

IS&LEBT Commissioning Review Safety and Radiation Protection Helen Boyer / Sigrid Kozielski ESH Division European Spallation Source ERIC 28 August 2019

Positive Radiation Protection Communication with RPO in daily meetings Support during surveys and dosimeter exchange OHS Good control of area, good fencing and management of area. ATEX area was respected

Negative Radiation Protection Management of removable shielding Near miss (see other slide) OHS See fire and electrical issues

Safety and RP Incidents Occurrence title Occurrence unit Type of occurrence 2019-83 Part of accelerator tunnel found pitchblack G01 Accelerator Tunnel (AT) Risk observation 2019-22 Beam left on while working inside shielding wall Normal Conducting Linac (NCL) Near miss 2019-20 Water leakage during the relocation of the LEBT Faraday cup 2018-170 Nitrogen gas bottle not properly fixed in a safe state next to equipment Front End Building (FEB) Level 90 2018-90 Sparking of Cable Tray 2018-89 Masking of interlock signal during integration test of PSS0 for the Ion Source and LEBT Test stand 2018-80 Temporary removal of shielding material and attached dosimeters

RP Incidents Beam left on during exchange of radiation monitors Initial Cause: failure in communication Root cause: stress applied to the shift leaders to extract as much beam as possible and causing safety measures to be set aside Recommendations: Local panel showing if beam is on or off RP risk assessment of placement of dosimeters Review communication practices

OHS Issues Fire and explosion ATEX assessment and follow up actions – permanent hydrogen monitor Minimising fire load in area Shutdown of fire suppression system and no compensatory measures in place Sealing of pipes and cables between fire compartments Electrical Ensure design and implementation of grounding fully in place Issues associated with high voltage test Demonstration of safe shutdown of equipment in the event of a need for emergency intervention

OHS Issues - 2 Control room air quality Meeting to understand issues Checks of air handling units and filters Deep clean Change of furniture Consultant to carry out more detailed analysis

Top 3 issues Control of removable shielding Review of ATEX controls Demonstration of shutdown of equipment if emergency services intervention required

Questions