19th July 2019 Finish the MU96 re-installation

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
{. Let one of our dedicated Service Trucks come to help you with your electrical needs.
Phase Difference = Phase Difference = 0.05.
Measuring Leakage Current on Singles and Ladders P. Riedler and S. Ceresa, August 2005 Sensor Chip Manipulator Needle for sensor back side contact Probe-card.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
Performance New requirement s for circuit integrity: enhanced cables BS : 2002 Fire Detection and Fire Alarm Systems for Buildings Part 1: code.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.

EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
EHN1 – EN/EL Progress update J. Devine 25/02/16. Integration – Jura Substation Position updated to avoid clash with door. Meeting next week for Civil.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Decommissioning of CTF3 Nothing has been studied on the cost, manpower needed, environmental impact (RP) etc. This is just to raise some points that may.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
PS CHILLED WATER PROJECT SHUT-DOWN WHY? THE AGE OF THE PIPING - installed in years ago - technical life of piping normally years.
1 Mulch Lane Bridgeton Mo
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
ABT-EC EYETS Activities 2nd reports
Update on the Critical Path of the PS Booster Schedule for the EYETS
Controls & software Andy Butterworth.
YETS & LS2 Works EN-El on LHC / Power distribution
EHN1 Extension planning
CE Status: Activities executed until 03/08 and ongoing
EN 4946 – Refurbishment of Electrical Substations
De-cabling strategy during YETS
LHC Civil Engineering Activities for YETS – LS2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Renovation of the 45-year old PS magnets
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS PS + PS SWY + TT2 Facility Coordinator:
YETS & LS2 Works EN-EL / Power distribution
James Ridewood BE-OP-SPS
Extension SR1 WP3 Electrical installations
East Hall under construction
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
The Steps for Basement Renovations
PSB-PS instrumentation for LIU
GIS Portal Racks Project
'. \s\s I. '.. '... · \ \ \,, I.
' '· \ ·' ,,,,
SEQUENCE OF OPERATIONS
Сабақ тақырыбы: Теңдеу.
ABP/RTL Main RTL Activities for 2007/8:-

LINAC 3 Meeting ICL machines Injectors
Progress on cryostat design and production
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

19th July 2019 Finish the MU96 re-installation EN-EL lights renovation (Gallery 3) Asbestos cleaning campaign (MU08 – MU13) LINAC4 connection BTP installation Lighting change over sequence – Phase 1 BTP inst. Lighting and power change over to take place Friday morning to definitive supplies (ME45/Building 365). Lighting will be swapped sequentially to avoid any blackouts within the affected zones of the PS. 50% of normal lighting will be available at all times. EN-EL consolidation SMB asbestos cleaning MU96 re-installation No access to the inner and outer PS galleries No access between SS07 and SS14 LINAC4 connection 4-Jul-2019

19th July 2019 EN/EL Lighting + Power change over in PS, SS39-SS76 Friday 19th July Lighting change over sequence – Phase 1 BTP inst. Lighting and power change over to take place Friday morning to definitive supplies (ME45/Building 365). Lighting will be swapped sequentially to avoid any blackouts within the affected zones of the PS. 50% of normal lighting will be available at all times. EN-EL consolidation SMB asbestos cleaning MU96 re-installation No access to the inner and outer PS galleries No access between SS07 and SS14 LINAC4 connection 4-Jul-2019

19th July 2019 Finish the MU96 re-installation EN-EL lights renovation (Gallery 3) Asbestos cleaning campaign (MU08 – MU13) LINAC4 connection BTP installation Lighting change over – Phase 2 BTP inst. EN-EL consolidation SMB asbestos cleaning MU96 re-installation No access to the inner and outer PS galleries No access between SS07 and SS14 LINAC4 connection 4-Jul-2019

19th July 2019 Finish the MU96 re-installation EN-EL lights renovation (Gallery 3) Asbestos cleaning campaign (MU08 – MU13) LINAC4 connection BTP installation Lighting change over – Phase 3 BTP inst. EN-EL consolidation SMB asbestos cleaning MU96 re-installation No access to the inner and outer PS galleries No access between SS07 and SS14 LINAC4 connection 4-Jul-2019

19th July 2019 Finish the MU96 re-installation EN-EL lights renovation (Gallery 3) Asbestos cleaning campaign (MU08 – MU13) LINAC4 connection BTP installation Lighting change over – Phase 4 BTP inst. EN-EL consolidation SMB asbestos cleaning MU96 re-installation No access to the inner and outer PS galleries No access between SS07 and SS14 LINAC4 connection 4-Jul-2019

19th July 2019 The power change over will be done in two phases. Finish the MU96 re-installation EN-EL lights renovation (Gallery 3) Asbestos cleaning campaign (MU08 – MU13) LINAC4 connection BTP installation Power change over – Phase 1 BTP inst. The power change over will be done in two phases. Each area will be inspected to ensure that no works are in progress before the change-over. EN-EL consolidation SMB asbestos cleaning MU96 re-installation No access to the inner and outer PS galleries No access between SS07 and SS14 LINAC4 connection 4-Jul-2019

19th July 2019 Finish the MU96 re-installation EN-EL lights renovation (Gallery 3) Asbestos cleaning campaign (MU08 – MU13) LINAC4 connection BTP installation Power change over – Phase 2 BTP inst. EN-EL consolidation SMB asbestos cleaning MU96 re-installation No access to the inner and outer PS galleries No access between SS07 and SS14 LINAC4 connection 4-Jul-2019