Charles Sommer October 21st, 2019

Slides:



Advertisements
Similar presentations
1 CAN WE TURN A PHONE IN TO A SATELLITE? Android Open 2011San Francisco,10th Oct
Advertisements

Israeli Universal Spacecraft Bus Characteristics and Design Trade-Offs
LightSail.
Engineering Roles We will be forming groups of 3 students
Attitude Determination and Control
Commercial Confidential 1 LIM Yoram Yaniv, October 2010 LIM Yoram Yaniv, October 2010.
CASTOR Jr. MIT 2LT Corey Crowell 2LT Matt McCormack Lucas de la Garza Spenser Parra.
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
Attitude & Orbit Control Subsystem 26 April 2007.
Torque and the vector product
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
S/C System Design Overview Robert G. Melton Department of Aerospace Engineering.
The NASA Ames PhoneSat Project Mike Safyan DCC 2011, Baltimore 9/16/11.
University at Buffalo GLADOS SHOT II Balloon Payload Presentation June 29, 2012 Andrew Dianetti, Alex Wende, Bryant Carlson, Joe Flannery 1.
AMSAT Fox-1 Overview AMSAT Engineering Team 2011 Space Symposium.
1 Formation Flying Shunsuke Hirayama Tsutomu Hasegawa Aziatun Burhan Masao Shimada Tomo Sugano Rachel Winters Matt Whitten Kyle Tholen Matt Mueller Shelby.
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 Inter-Connect Board (ICB) Jerry Zdenek
Attitude Determination and Control System (ADCS)
Brief introduction of YINGHUO-1 Micro-satellite for Mars environment exploration J. Wu, G. Zhu, H. Zhao, C. Wang, L. Lei, Y. Sun, W. Guo and S. Huang Center.
1 Solar-B Data Co-Alignment Plan T.Shimizu (NAOJ) Solar-B MO&DA Working Group Solar-B 4 th Science
Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Contractor 3. I. Launch III. Formation Alignment with Star Pictures Data downlink Stationkeeping II. Deployment IV. Deorbit.
Overview and Operations of FITSAT-1 (NIWAKA) RAST2013 Istanbul 13 th June, 2013 Takushi Tanaka FITSAT-project Fukuoka Institute of Technology
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
Guidance, Navigation and Controls Subsystem Winter 1999 Semester Review.
Final Version Dick Bolt Code 302 May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Success.
Guiding Control Subsystem (GCS) Overview
1 Jet Propulsion Laboratory JPL Flight Team Adam Nikolic Josh Ruggiero Bob Hoffman Dusty Terrill.
Attitude Determination & Control System Group 930 & 931.
Arizona Space Grant Symposium April 19, 2008 SWE Imaging Payload Command and Data Handling Jordan Cluster.
PTAR Presentation Jonathan DeLaRosa, Jessica Nelson, Ivan Morin, JJ Rodenburg, & Tim Stelly Team Cronus.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
Section 19.1 Mission Operations Steve Odendahl Honeywell Technology Solutions, Inc. 5 Space Technology “Tomorrow’s Technology Today” GSFC ST5 PDR June.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Be P16102 Constrain Subsystems House Internals Provide Access Mount components securely Stow Solar Panels Gather Solar Energy Expose Panels before Deployment.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
1 ARMADILLO – SHOT II The University of Texas at Austin Travis Imken Shaina Johl Christopher McBryde Travis Sanders June 29, 2012 Boulder, CO.
CubeSat Platform for SeaHawk
Sony Mavica Tutorial By Cheryl Abbiati Insert Battery.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
KUFASAT STUDENTS’ SATELLITE
E. Ponce2-1, G. Garipov2, B. Khrenov2, P. Klimov2, H. Salazar1
BNSC Agency Report to WGISS21 Budapest, May 2006 Wyn Cudlip
Universal Interface, 4-fold, FM, US/U 4.2
CINEMA System Engineering
Telemetry system The telemetry, tracking, and command (TT&C) subsystem performs several routine functions abroad a spacecraft. The telemetry or "telemetering"
ACS UC Berkeley Space Sciences Laboratory
CINEMA Orbit/Attitude? (looking down from top toward earth)
VIRTIS Operations at Lutetia
Launch Readiness Review
CUSat High Altitude Test (CHAT) Mission Briefing
Polar Orbiting INfrared Tracking Receiver Overall Mission Review
SDO Flight Dynamics Subsystem
HA1L High Altitude 1U Laboratory
HA1L High Altitude 1U Laboratory
Launch and On-orbit Checkout
Rotational kinetic energy
Attitude Determination and Control Preliminary Design Review
CubeSat vs. Science Instrument Complexity
Attitude Determination Overview
Rigid Body: Rotational and Translational Motion; Rolling without Slipping 8.01 W11D1 Today’s Reading Assignment Young and Freedman: 10.3.
Instrument Commissioning SDO SOWG - January 18-19, 2007 Purpose/Goal:
Rigid Body: Rotational and Translational Motion; Rolling without Slipping 8.01 W11D1 Today’s Reading Assignment Young and Freedman:
The Deorbiting of GOCE – A Spacecraft Operations Perspective
Ground Stations and Radio License
Radio Interface Board Status
Presentation transcript:

Charles Sommer October 21st, 2019 ConOps Charles Sommer October 21st, 2019

ConOps – Considerations 90 min polar orbit NORAD data retrieval 7 days after launch Always switching to sun pointing when battery reaches 55% (43Wh) of capacity (77Wh) Always taking night side when doing autonomous operations Battery and Camera heaters ON when on night side Transponder ON only when necessary and at full battery power Worst case power losses considered 5% from Kill Switch 20% from EPS switches 10%, 20% or 40% for Interface Boards switches 12/17/2019

Overview NARROW OPERATIONS AAReST Initialization Camera Deployment Rigid Mirror 1 Test Rigid Mirror 2 Test Deformable Mirror 1 Narrow Test Deformable Mirror 2 Narrow Test Surrey MirrorSat Reconfiguration Deformable Mirror 1 Wide Test IIST MirrorSat Reconfiguration Deformable Mirror 2 Wide Test IIST MirrorSat Extended Mission AAReST Decommission WIDE OPERATIONS 12/17/2019

AAReST Initialization NARROW OPERATIONS AAReST Initialization Camera Deployment Rigid Mirror 1 Test Rigid Mirror 2 Test Deformable Mirror 1 Narrow Test Deformable Mirror 2 Narrow Test Surrey MirrorSat Reconfiguration Deformable Mirror 1 Wide Test IIST MirrorSat Reconfiguration Deformable Mirror 2 Wide Test IIST MirrorSat Extended Mission AAReST Decommission WIDE OPERATIONS 12/17/2019

AAReST Initialization Step Actions ADCS Mode – State Duration NIGHT AUTO Autonomous Init. EPS + OBC + Radio ON (by default) None – Tumbling 30 s max UHF/VHF Antennas Deployment Beacon every 1 min ADCS Initial Commissioning ADCS ON + Health check 15 s Angular rates determination 5 min Detumbling w/ torque rods Detumbling 4 orbits TLE & Sun Pointing GPS ON + Signal Acquisition + TLE computation NIGHT AND DAY Sun pointing with torque rods + battery charging Survival – Sun Tracking 2 orbits MANUAL ADCS Magnetometer and Reaction Wheel Commissioning Magnetometer calibration and survey 3 orbits Deploy Magnetometer if necessary 1 orbit Reaction wheels ramp-up test NORAD data 12/17/2019

AAReST Initialization – Energy drawn 12/17/2019

Camera Deployment NARROW OPERATIONS AAReST Initialization Rigid Mirror 1 Test Rigid Mirror 2 Test Deformable Mirror 1 Narrow Test Deformable Mirror 2 Narrow Test Surrey MirrorSat Reconfiguration Deformable Mirror 1 Wide Test IIST MirrorSat Reconfiguration Deformable Mirror 2 Wide Test IIST MirrorSat Extended Mission AAReST Decommission WIDE OPERATIONS 12/17/2019

Camera Deployment Step Actions ADCS Mode – State Duration MANUAL Camera Stage 1 Deployment Camera ON + Health check + Download first images Sun Tracking 1 orbit DAY Actuate Camera Burnwire + Take BIC picture Conf Change 10 s Camera Stage 2 Deployment Start Camera Accelerometer acquisition + BIC video 5 s Actuate Camera Frangibolt None – Tumbling 20 s Set new inertias + detumble + download video/data Detumbling ADCS Fine Sun Sensor and Star Tracker Commissioning Fine Sun Sensor Commissioning 1 orbit min. Star Tracker Commissioning Star Tracking 12/17/2019

Camera Deployment – Energy drawn 12/17/2019

Rigid Mirrors Tests NARROW OPERATIONS AAReST Initialization Camera Deployment Rigid Mirror 1 Test Rigid Mirror 2 Test Deformable Mirror 1 Narrow Test Deformable Mirror 2 Narrow Test Surrey MirrorSat Reconfiguration Deformable Mirror 1 Wide Test IIST MirrorSat Reconfiguration Deformable Mirror 2 Wide Test IIST MirrorSat Extended Mission AAReST Decommission WIDE OPERATIONS 12/17/2019

RW Desaturation + Sun tracking Rigid Mirrors Tests Step Actions ADCS Mode – State Duration DAY MANUAL Rigid Mirror Initialization RM ON + Health check + Release Mirror Sun tracking 1 min Camera ON + Set picomotors ground values to MirrorBox NIGHT AUTO RM Test Fine point towards calibration star Fine pointing 10 min Take several SIC image every n seconds (star centered + boom jitter test) 30 min Desaturate RW + Download and assess images + recharge RW Desaturation + Sun tracking 1 orbit RM Blind Search Algorithm (if necessary) Start blind search algorithm (if necessary) + save SC images RM Optical Alignment Start optical alignment algorithm + save SC images 12/17/2019

Rigid Mirrors Tests – Energy drawn 12/17/2019

Deformable Mirrors Tests NARROW OPERATIONS AAReST Initialization Camera Deployment Rigid Mirror 1 Test Rigid Mirror 2 Test Deformable Mirror 1 Narrow Test Deformable Mirror 2 Narrow Test Surrey MirrorSat Reconfiguration Deformable Mirror 1 Wide Test IIST MirrorSat Reconfiguration Deformable Mirror 2 Wide Test IIST MirrorSat Extended Mission AAReST Decommission WIDE OPERATIONS 12/17/2019

Deformable Mirrors Tests Step Actions ADCS Mode – State Duration MirrorSat Initialization Power up MS + Healthcheck + downlink results Sun tracking 1 orbit Same operations as RM NIGHT AUTO DM Influence Function Computation Fine point towards calibration star Fine Pointing 10 min Start influence function computation algorithm + save SIC images + influence function results Several orbits Desaturate RW + Download and assess results + Recharge RW Desaturation 5 orbits DM Wavefront Error Minimization Start wavefront error minimization algorithm 12/17/2019

Deformable Mirrors Tests – Energy Drawn 12/17/2019

MirrorSats Reconfiguration NARROW OPERATIONS AAReST Initialization Camera Deployment Rigid Mirror 1 Test Rigid Mirror 2 Test Deformable Mirror 1 Narrow Test Deformable Mirror 2 Narrow Test Surrey MirrorSat Reconfiguration Deformable Mirror 1 Wide Test IIST MirrorSat Reconfiguration Deformable Mirror 2 Wide Test IIST MirrorSat Extended Mission AAReST Decommission WIDE OPERATIONS 12/17/2019

MirrorSats Reconfiguration Step Actions ADCS Mode – State Duration DAY MANUAL MS Frangibolt Actuation Camera, PICs, WiFi ON + Start BIC video + Actuate Frangibolt None 20 s Detumble + download video + Verify MS still held by permanent mags Detumble + Sun Tracking 1 orbit MS Free Fly Test Start BIC video + Actuate Burnwire 2 s Actuate EMS to gently push MirrorSat + Test LED pattern 10 s Pull MirrorSat back with EMS Detumble + download video and results MS Reconfiguration Start BIC video + Actuate EMS to push MirrorSat Update ADCS to L shaped inertias with 1 MS attached Conf Change 5 s Use LEDs and EMS to let MS free fly X mm away Rotate CoreSat 45 deg Pull back, dock MS back with EMS + update ADCS inertias

IIST MirrorSat Extended Mission NARROW OPERATIONS AAReST Initialization Camera Deployment Rigid Mirror 1 Test Rigid Mirror 2 Test Deformable Mirror 1 Narrow Test Deformable Mirror 2 Narrow Test Surrey MirrorSat Reconfiguration Deformable Mirror 1 Wide Test IIST MirrorSat Reconfiguration Deformable Mirror 2 Wide Test IIST MirrorSat Extended Mission AAReST Decommission WIDE OPERATIONS 12/17/2019

IIST MirrorSat Extended Mission Step Actions ADCS Mode – State Duration DAY MANUAL IIST MirrorSat Separation Actuate EMS to gently push away IIST MS None 20 s Update ADCS to I shaped inertias with 1 MS missing Conf Change ? IIST MirrorSat Experiment Keep IIST MS in view of patch antenna (max 1km?) Actuate IIST MS propulsion system at a given distance (?)

MirrorSats Decommission NARROW OPERATIONS AAReST Initialization Camera Deployment Rigid Mirror 1 Test Rigid Mirror 2 Test Deformable Mirror 1 Narrow Test Deformable Mirror 2 Narrow Test Surrey MirrorSat Reconfiguration Deformable Mirror 1 Wide Test IIST MirrorSat Reconfiguration Deformable Mirror 2 Wide Test IIST MirrorSat Extended Mission AAReST Decommission WIDE OPERATIONS 12/17/2019

AAReST Decommission Send a command to switch OFF: OBC Radio Controller Radio 12V line would still be powered (unswitchable) Currently, no “firecode” like command to switch off everything